VRX SILICA LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2021
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director)
SECRETARY
Ian Hobson
REGISTERED AND PRINCIPAL OFFICE
Level 1, 6 Thelma Street
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
Website:
www.vrxsilica.com.au
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 11, 172 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
Level 32, Exchange Tower
2 The Esplanade
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
VRX Silica Limited shares (VRX) are listed on the
Australian Securities Exchange
VRX Silica Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31 December
2021. In order to comply with the provisions of the Corporations Act 2001, the directors report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date of
this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director) (appointed 1 September 2021)
PRINCIPAL ACTIVITIES
The principal continuing activities during the half-year of entities within the consolidated entity was
mineral exploration.
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of VRX Silica Limited was $3,239,861 (2020: loss
of $822,135).
The following is a summary of the activities conducted by VRX Silica Limited (VRX or Company) during
the half year ended 31 December 2021 at its silica sand projects at Arrowsmith North, Arrowsmith
Central (located 270 km north of Perth) and at Muchea (located 50 km from Perth), all situated in
Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration company with three high-value,
advanced, very long-term silica sand projects in Western Australia, a Tier 1 mining region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases with secure
tenure and a combined +1bn tonne Mineral Resource of 99.6% to 99.9% SiO2 grade silica sand.
The Company and its management team is WA based as are its three large scale, high-grade and low
impurity silica sand projects. Each project can be run independently and supply high grade silica sand
to many diverse markets.
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main ingredient in all
types of glassmaking, including specialty solar panel and high-tech glass. The glass manufacturing
industry demand is increasing at a rate of 5-6% per year, or about 8-10 million tonnes pa. Around 47%
of the world’s glass is made in Asia.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is currently
experiencing increasing demand at a time of a global supply shortfall.
VRX Silica Limited
2
DIRECTORS’ REPORT
A Project development pipeline to ensure a disciplined, staged development of world-class
assets
The Arrowsmith North silica sand project will lead a staggered and disciplined development program
with first production, subject to final environmental approvals, expected in 2022, followed by Muchea
and Arrowsmith Central.
VRX has the most-advanced silica sand projects for an ASX listed company in Australia with planning,
Aboriginal heritage and environmental studies having commenced in 2017.
Mining Leases are granted over all three projects as well as various Miscellaneous Licences for access
with permitting and infrastructure preparations well-advanced.
The scale of the projects provides for a long-term opportunity for silica sand export and potential for
glass manufacturing and downstream industries in Western Australia.
Arrowsmith North - Near-term development opportunity on a world-class silica sand project
The mining and processing operation is relatively simple and low impact with long-term production
expected to commence initially at Arrowsmith North on the 223Mt Ore Reserve @ 99.7% SiO2 in 2022,
subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a unique
patented process circuit.
Process circuit design and detailed engineering has been designed following an extensive metallurgical
testing regime. Further bulk testwork programs commenced prior to 31 December 2021 continue to
refine the operating parameters and provide final product samples to an extensive list of potential
buyers. Large samples (50-60kg) are required for glassmaking furnace testing and foundry resin coating
testing. The samples have been requested by potential buyers following previous successful testwork
on smaller (1-5kg) samples.
Geotechnical surveys were completed before 31 December 2021 for the plant site and access roads.
The plant design is well progressed along with determination of non-process infrastructure
requirements. The creation of an overall site and plant model will culminate in 3D modelling which can
be viewed on the Company’s website (www.vrxsilica.com.au).
The Company has identified long-lead items and has commenced the specification and production of
tender documentation of processing equipment for the plant in preparation for the procurement process
in order to enable a timely construction program following a decision to mine at Arrowsmith North.
In addition, a process water bore was successfully drilled to access water from the Yarragadee North
deep aquifer and currently aquifer testing is underway to supply data for an abstraction licence
application for 0.9Gl of water. The development of monitoring boreholes for a borefield is underway.
The plant has been designed to operate predominately with recycled water.
Gas pipelines run adjacent to each of the project areas and it is planned for the plant in the medium to
long term to run on a hybrid gas and solar power supply following a tender process for power supply
contractors.
Arrowsmith North has access to established infrastructure such as the unused rail line (from Eneabba
to Geraldton) which runs adjacent to the Arrowsmith project tenements. A joint co-operation agreement
with Mid West Ports Authority (for export of silica sand product from Geraldton Port) has been signed
and collaboration has commenced with Arc Infrastructure for a dedicated train unloader at the Geraldton
Port. The Company has access to the adjacent Brand Highway and a road intersection plan has been
submitted to Main Roads to enable road transport of silica sand product in the short term.
VRX Silica Limited
3
DIRECTORS’ REPORT
Heritage Arrowsmith North
VRX has conducted comprehensive Aboriginal Heritage Surveys over the 30-year mining envelope at
Arrowsmith North and access roads. These surveys were conducted with Aboriginal Consultants from
the Yamatji Southern Regional Corporation, anthropologists and VRX.
No previously unrecorded Aboriginal archaeological sites were found during the surveys which was
consistent with previous surveys in the area. The absence of newly recorded Aboriginal sites
demonstrates that unsuitable conditions exist for the formation and persistence of surface
archaeological sites or previously unrecorded ethnographic sites within the project area and surrounds.
There are no recorded heritage features in the survey area requiring action or management.
During the Heritage surveys the Company engaged the consultants to record fauna observations while
traversing the survey area. These observations were compiled at the end of each day to provide a firsthand summary of field observations of potential fauna sightings. This data will be incorporated into
fauna submissions as part of the environmental approvals process. The Company has used this
exercise as an introduction to the future Ranger program with the Yamatji Southern Regional
Corporation.
Vegetation Direct Transfer
VRX has developed a unique and progressive mining and rehabilitation method for its silica sand
projects. The Vegetation Direct Transfer (VDT) method provides rapid and comprehensive regeneration
of mined areas based on continuous rehabilitation as mining progresses. The VDT method is a madefor-purpose mining method which removes and replaces a 400mm-deep sod with topsoil to the mined
area containing the vast majority of native flora and invertebrate fauna remaining intact.
At the VRX selected mine areas, the root structures in the loose sand are relatively shallow at 200300mm in depth and ideally suited for the VDT system. The method has been developed to provide the
best rehabilitation outcome for the recalcitrant sedges and grass species.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
QA/QC Metallurgical Testwork
Extensive metallurgical testwork has been undertaken by sand processing specialists BHM Process
Consultants to ensure throughput and quality can be maintained. This has resulted in the development
and successful testing at lab scale of a new and unique process circuit incorporating flotation.
An Australian patent for the process has been lodged by BHM to protect the unique intellectual property
for the benefit of VRX to utilise and share in future licensing. Flotation will replace spirals and screening
by upstream classifying, which is intended to not only reduce capex and operating costs but also
produce a more consistent high grade marketable product.
The flotation reagents are organic and rapidly oxidise once used, presenting no environmental issues.
Bulk pilot plant scale testing is currently underway and will supply further large samples to potential
buyers. Testing to date with sample sizes referred to above has resulted in an Arrowsmith North product
of 99.7% SiO2 with Fe2O3 <500ppm after processing and a preliminary Muchea product of 99.9% SiO2
with Fe2O3 <100ppm after processing (high-grade).
The Company’s goal is to provide for consistent QA/QC production and extend the silica sand resources
that can be processed consistently for sale.
VRX Silica Limited
4
DIRECTORS’ REPORT
The Approvals Progress
Arrowsmith North
VRX has conducted extensive environmental studies over the Company’s silica sand projects over a
number of seasons in anticipation of requirements of the State and Federal environmental regulation
departments to undertake approvals assessments. These surveys commenced shortly after the
tenements were acquired and the number and extent of these surveys have expanded following further
consultation with related departments. The Company has initially concentrated on gaining approval for
development of the Arrowsmith North project.
VRX has received confirmation from the Commonwealth Department of Agriculture, Water and the
Environment (DWER) for accredited approval under the Environment Protection and Biodiversity
Conservation Act 1999 (EPBC Act). Accreditation of the Environmental Protection Authority’s (EPA)
assessment processes means that the Commonwealth can rely on environmental assessments
undertaken by the EPA for the purpose of its approval decisions under the EPBC Act on proposals that
are likely to have a significant impact on a matter of national environmental significance. If the EPA
assesses a proposal at the level of PER under the agreement, separate assessment by the
Commonwealth is not required.
The Proposal was referred to EPA services on 17 March 2021 for assessment under Part IV of the
Environmental Protection Act 1986 (EP Act).
On 24 May 2021 it was determined that the Proposal should be assessed at a Public Environmental
Review level of assessment and, as a result, an Environmental Scoping Document (ESD) was to be
submitted to the EPA for assessment. A draft ESD was prepared and submitted to DWER for
assessment on 29 June 2021.
VRX has also sought consent from the EPA to amend the proposed development (s43A application) at
Arrowsmith North during the assessment phase.
The amendment comprises the following:
•
Relocation of the silica sand processing plant from the Access and Processing Development
Envelope to within the Mine Development Envelope.
•
Removal of the western access train loadout facilities.
•
Removal of the solar farm area (which will be relocated once suitable land is accessed).
•
A reduction in the extent of the Access and Processing Development Envelope from 447 hectares
(ha) to 61 ha and renaming it the Access Development Envelope.
•
An overall reduction in the extent of clearing from 412.2 ha to 366.5 ha.
Restricting the project to use of the southern access route for trucking in the short term removes the
complexities surrounding the western access option and reduces the project footprint. The southern
route will also provide for development of a rail loadout facility in the future.
Pursuant to section 43A of the EP Act, the EPA has given its consent to the amendment, which will
enable the proposed action to continue to be assessed by accredited assessment by the Department
of Agriculture, Water and the Environment (DAWE).
The determination has been updated on the EPA website:
https://www.epa.wa.gov.au/proposals/arrowsmith-north-silica-sand-project
A draft ESD (Version A) for the Proposal was submitted to the EPA on 29 June 2021 for assessment
and comments were provided by the EPA on 18 August 2021. VRX addressed the EPA’s comments
and submitted an updated draft ESD (Version B) to the EPA on 22 September 2021.
VRX Silica Limited
5
DIRECTORS’ REPORT
During October 2021, the EPA’s guidance for the preparation of ESDs was amended and the Company
was requested by DWER to amend and re-submit the draft ESD in line with the new guidance. Further
comments were provided by the EPA on 7 December 2021. VRX prepared and submitted an amended
draft on 13 December 2021.
Subsequent to 31 December 2021, additional comments by the EPA on the amended draft ESD were
received, and 18 January 2022 these were addressed by the Company and the document re-submitted.
The ESD requires the approval of the EPA Board before the approval process proceeds.
A significant number of studies have already been completed:
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Desktop, recce and detailed flora and vegetation surveys
Desktop, basic, detailed and targeted fauna surveys
Short Range Endemic species desktop and field assessment
Terrestrial Environmental Quality
Dieback field and follow up assessment
Surface Water Drainage assessment
Groundwater Hydrology
Acid Mine Drainage
Social Surrounds and Archaeological and Ethnographic Heritage survey
Cultural Values and Heritage assessment
Greenhouse Gas Emissions estimation
Air Quality assessment
Permit for Construction of Water Bore
Fig 1: Arrowsmith North vegetation
VRX Silica Limited
6
DIRECTORS’ REPORT
Key assessment milestones to be completed
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EPA approves ESD
Mining Scope to DMIRS
EPA publishes ESD
Submission of draft ERD
EPA accepts ERD and authorises release of ERD for 4 week public review (assumes
no further revisions required)
EPA provides summary of submissions to proponent
Submit response to submissions to EPA
EPA reviews response to submissions
EPA accepts and publishes proponent’s response to submissions
EPA finalises assessment report (including consultation on draft conditions) and sends
recommendation to Minister
Mining Proposal to DMIRS
There will be no further direction on any future survey requirements or timing until the ESD is approved
by the EPA.
Also, during December 2021, the mining proposal for the Department of Mines, Industry Regulation and
Safety (DMIRS) was drafted with formal lodgement subject to the receipt of EPA approval for the ESD.
An initial project scope document has been prepared and will be discussed with DMIRS prior to the
lodgement of the proposal.
Arrowsmith Central
VRX has referred a proposal for the Arrowsmith Central silica sand project to DAWE for assessment
under the EPBC Act. Prior to 31 December 2021, VRX was advised by DAWE it has determined that
the Proposal is a Controlled Action and the statutory assessment approach timeframe will await a
decision by the WA Government to determine whether an accredited assessment is an appropriate
method.
The Arrowsmith Central Proposal was referred to the EPA under s. 38 of the EP Act on 10 September
2021. A notice for further information under s. 38F (1) and (2) of the EP Act was then received on 8
December 2021.
VRX has requested and had approved an extension of time to the end of February 2022 to supply the
information requested to incorporate the additional material from the September 2021 detailed flora and
vegetation study at Arrowsmith Central. The study results are expected early February 2022.
Offtake
The Company has entered into an initial offtake term sheet for the supply of Arrowsmith North foundry
sand products to the South Korean foundry industry, with strong interest from other potential customers
in SE Asia at a time of diminishing global supply and increasing demand.
The customers, prominent South Korean foundry sand suppliers and users, Dong A Heung Eop Mining
Co. Ltd (Dong A) and Dong Nam Corporation (Dong Nam) supply casting and silica sand to Kia,
Hyundai, Daewoo and Samsung Renault. This is a first for VRX and Australia as it is the first and only
supply contract for foundry sand from Australia to South Korea.
The term sheet, which is non-binding and conditional on project approvals, sets out the terms and
conditions for a FOB silica sand supply contract from Geraldton Port, as well as product specifications,
quality control and variation limits, term and quantity determination, sampling and analysis procedures,
dispute resolution, FOB (INCO 2020) terms and required documentation and Letter of Credit payment
terms.
The final purchase price is to be determined once the delivery date can be committed.
VRX Silica Limited
7
DIRECTORS’ REPORT
Muchea - Large scale, world class high-grade silica sand project
Development of the Muchea silica sand project will follow once production has commenced at
Arrowsmith North.
Muchea will have access to established infrastructure such as grid power, adjacent to the Brand
Highway and the underutilised railway which connects to the Kwinana Port (approx. 100km).
Gas pipelines run adjacent to the Muchea silica sand project and water will be accessed from the
Yaragadee deep aquifer.
As the plant will be identical to that at Arrowsmith North, it will also utilise the patent pending process
with the flotation process and upstream classifying.
This is intended to not only reduce capex and operating costs but also produce a more consistently
high-grade marketable product. Testing to-date at lab scale 20-40kg samples, has resulted in 99.9%
SiO2 with Fe2O3 <100ppm after processing (high-grade).
The Company has had regular overseas enquiries for Muchea silica sand and believes that the
consistent production of such high-grade silica sand with a low iron content will be in high demand as
raw material for the manufacture of premium ultra-clear cover glass production, particularly for the
burgeoning solar panel manufacturing industry.
Fig 2: Muchea Banksia open woodland
VRX Silica Limited
8
DIRECTORS’ REPORT
Boyatup
The Company has commissioned an environmental desktop study over the Boyatup region to
commence the approvals process.
The Company has planned for a drill program Q2 2022 to follow up initial hand auger reconnaissance
drilling and assays.
The Solar Panel Industry
To meet 2050 greenhouse gas targets the world requires +400GW of solar installation per year. A
record 140GW was installed in 2020. The majority of solar panels are manufactured in China and the
top 10 producers of “cover glass” for solar panels are all Chinese companies.
Australian Solar Panel Installation
Solar panel installation in Australia is a fast-growing industry. As of September 2021, Australia’s 2.96
million solar PV installations had a combined capacity of 23.46GW. In the preceding 12 months 4.12GW
were installed in Australia.
Australia has the highest per capita solar capacity at 600W per capita and solar power accounted for
9.9% of Australia’s total energy production in 2020.
The installed solar capacity quadrupled between 2011 and 2016 and the price of photovoltaic power is
steadily decreasing.
Potential for manufacturing cover glass from adjacent gas/hydrogen pipeline
VRX believes it is the right time, and Muchea is the right place for WA to maximise its economic
advantages of a very long-life high-grade silica sand supply and WA domestic gas reserves, together
with rapidly developing hydrogen projects in the Mid-West, for a high-tech ultra-clear glass production
capability at Muchea.
During the half year being reported on, VRX continued its consultation with the WA State Government
to attract foreign and local investment into the development of world-class glass manufacturing and
downstream processing industries in Western Australia.
Environmental, Social and Governance - ESG
VRX has committed to a series of Environmental, Social and Governance (ESG) initiatives ahead of
the release of its FY21 Sustainability Report, the first one to be published by the Company and included
in the 2021 Annual Report.
VRX is conscious of its social licence obligations, not only in proactively engaging with the traditional
owners and other stakeholders in the region, but also as an emerging global supplier, to join the world
movement towards a low-carbon future. Carbon life cycle analysis for estimated greenhouse gas (GHG)
emissions at Arrowsmith North have been conducted.
To ensure that VRX can measure, assess and communicate progress, the Company engaged ESG
specialist Futureproof Consulting to ensure appropriate data disclosures and framework alignment.
Following global best-practice, VRX stakeholders have been engaged and a list of material ESG topics
has been developed alongside a materiality matrix to prioritise the most critical issues. Focus areas
include minesite rehabilitation, health, safety and wellbeing, endangered species, emissions and
greenhouse gases and business ethics.
VRX Silica Limited
9
DIRECTORS’ REPORT
Underpinned by a global prospective customer base, VRX applauds the fact that expectations of
corporate behaviour are changing and investment capital is being redirected towards more responsible
entities. Sustainable investment now tops $35 trillion globally, including two-year growth of 25% across
Australasia.1
This has transformed the environment in which VRX operates to one with new priorities around climate
risk, biodiversity loss and, more recently, COVID-19 and its associated public health and social
challenges.
Importantly, in these early stages of VRX developing its world-class silica sand projects, the Company
is able to investigate opportunities to limit its impact on the world in which it operates. VRX will build
resilience and drive positive outcomes through its commitment to long-term, sustainable value creation
for all stakeholders.
In partnership with the Big 4 accounting firms, the World Economic Forum (WEF) identified a set of
global, cross-industry baseline disclosures and ESG metrics for companies to use to analyse their ESG
performance and communicate this to their stakeholders on a regular basis. Disclosures were drawn
from existing voluntary standards including GRI, SASB and TCFD and across four pillars considered
the most critical for business, society and the planet.
The adoption by VRX of the WEF framework has already highlighted a number of ESG opportunities,
including the Company’s long-term objective of integration of solar and battery capacity into power
generation and a purpose-built Vegetation Direct Transfer (VDT) mining method. VDT has been
designed by VRX for rapid regeneration through continuous rehabilitation that ensures the best outcome
for the vast majority of native flora and fauna across the Company’s silica sand projects.
These initiatives reflect VRX’s commitment to reducing its environmental footprint and building
sustainable outcomes for all stakeholders, focusing on the Company’s key development assets and the
surrounding communities. The Company will update stakeholders regularly on its ESG progress and
ensure VRX and its projects remain a responsible investment opportunity.
With the support of Futureproof, VRX will measure, monitor and report on its sustainability progress.
Futureproof helps companies adapt to the growing demands of investors and stakeholders to implement
and improve their ESG strategies and reporting practices.
Corporate
On 31 July 2021, the Company’s quoted options (ASX:VRXO) expired and a strong take-up for exercise
placed the Company in a solid financial position. A total of 22,662,911 options were exercised before
their expiry date (with 21,226,543 options exercised in July 2021), representing a 94.7% take up, raising
a total of $4,079,324.
During November and December 2021, 5.5 million unlisted options were exercised for a total of
$525,000 and 11,250,000 unlisted options expired unexercised.
Also, VRX strengthened its Board of Directors with the appointment of David Welch as a Non-Executive
Director.
Mr Welch is an experienced and well credentialed senior executive with a successful track record in the
planning, development and operation of logistics and infrastructure supply chains for commodities
markets, including mining, agriculture and industrial products sectors.
From 2007 to 2017, Mr Welch held senior executive positions within Aurizon Holdings Limited,
Australia’s largest rail freight operator. These positions included VP Iron Ore, VP Market Development
and EVP Strategy and Business Development where he had direct responsibility for strategy, business
transformation and performance, commercial negotiations, stakeholder engagement, major projects,
joint venture management, M&A and business development. He was previously the Managing Director
1
Global Sustainable Investment Review 2020
(http://www.gsi-alliance.org/wp-content/uploads/2021/07/GSIR-2020.pdf)
VRX Silica Limited
10
DIRECTORS’ REPORT
of The Millennium Group from 1998 to 2006 and was a Marketing Manager at CSBP Limited (part of
the Wesfarmers conglomerate) responsible for the management of mining reagent logistics from 1989
to 1994.
Mr Welch holds a Bachelor of Commerce (1st Class Hons) from the University of Western Australia.
Hydrogen Offtake
In March 2022 the Company announced the signing of a non-binding memorandum of understanding
(MOU) with Xodus Group Pty Ltd (Xodus) to explore the future supply of renewable hydrogen to the
Company’s silica sand projects as well as to potential, nearby glass-manufacturing facilities to enable
the production of net-zero glass.
Xodus, a global energy consultancy, specialises in the integration of environmental science,
engineering and management to provide holistic support and services in energy transition. An Xodusled consortium is developing Project MercurHy for the industrial-scale production of hydrogen gas using
renewable energy in the Mid-West region of Western Australia.
The MOU with Xodus establishes a platform for strategic confidential communication and future cooperation between the parties. It contemplates the sharing of information with a view to a future offtake
of between 9,000 tonnes to 11,000 tonnes of hydrogen per annum, which is adequate to supply a
substantial glass-making facility.
VRX Silica Limited
11
DIRECTORS’ REPORT
Details of Tenement Activities
During the period the following tenements were granted at the Arrowsmith Project:
Exploration Licence E70/5817
Exploration Licence E70/5548
Miscellaneous Licence L70/230
The following tenements were applied for at the Arrowsmith Project:
Miscellaneous Licence E70/229
General Purpose Lease G70/264
General Purpose Lease G70/265
General Purpose Lease G70/266
----------------------The information in this document that relates to the estimation and reporting of the Mineral Resource
and Ore Reserves for the Arrowsmith North, Arrowsmith Central and Muchea Silica Sand Projects is
extracted from releases to ASX on 28 August 2019, 17 September 2019 and 18 October 2019,
respectively. The Company confirms that it is not aware of any new information or data that materially
affects the information included in this document and all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
CHANGES IN STATE OF AFFAIRS
During the half-year ended 31 December 2021 there was no significant change in the entity’s state of
affairs other than that referred to in the half-year financial statements or notes thereto.
AUDITOR’S DECLARATION OF INDEPENDENCE
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act
2001 in relation to the review for the half-year ended 31 December 2021 is included within this financial
report.
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001.
On behalf of the directors
Bruce Maluish
Director
Perth, 14 March 2022
VRX Silica Limited
12
STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
For the Half-year ended 31 December 2021
Consolidated
31 December
31 December
2021
2020
$
$
Continuing operations
Revenue
27,511
83,027
Exploration and evaluation expenditure
Depreciation
Directors’ fees and benefits expense
Finance costs
Loss on revaluation of equity instruments
Share-based payments
Other expenses
(350,468)
(39,835)