Our flagship Arrowsmith North project and the neighbouring Arrowsmith Central and Brand, 270km north of Perth.

Ore Reserve at 99.5% SiO₂
221 Mt
Ungeared NPV₈
A$179.2M
Mine life
25 years
Planned processing plant
2 Mtpa

Arrowsmith North · Overview

Our flagship project

Arrowsmith North is our first silica sand project, in the mid-west of Western Australia about 270 kilometres north of Perth. It holds one of Australia’s most significant high-purity silica sand deposits, with a JORC (2012) Proved and Probable Ore Reserve of 221 million tonnes at 99.5% silicon dioxide.

Our 2026 Updated Bankable Feasibility Study, completed on 27 May 2026, confirms strong economics with an ungeared NPV₈ of A$179.2 million over a 25-year mine life. The project is engineered to produce distinct silica sand products for international foundry and glass markets.

Location
270km north of Perth, Western Australia
Status
Pre-construction. Final approval amendments and FID targeted Q4 2026
Products
Foundry, container glass and flat glass sand
Offtake
Six binding agreements, customers in South Korea, Taiwan, the Philippines and China
First production
Targeted early 2028

Approvals

Material approvals in place

  • State environmental approval from the Western Australian Minister for Environment (September 2025)
  • Department of Mines, Petroleum and Exploration approval of the Mining Proposal
  • Works approval from the Department of Water and Environmental Regulation, allowing construction of the processing plant
  • 5C water abstraction licence for the Yarragadee deep aquifer (September 2025)
  • Mining leases and exploration licences

Plant relocation to Arramall

After receiving our approvals, we acquired the Arramall farm, about 2,091 hectares of freehold land next to Arrowsmith North and bordered by Brand Highway. Moving the processing plant onto cleared land at Arramall reduces the native vegetation disturbed for the plant and roads, gives easy access to Brand Highway for transport to Geraldton Port, and suits a future solar farm.

The move required amendments to our existing approvals. The State agencies and the federal Department of Climate Change, Energy, the Environment and Water are finalising their decisions, which we expect in the December quarter 2026.

Commercial

Offtake and financing

We have executed six binding offtake agreements for Arrowsmith North with customers in South Korea, Taiwan, the Philippines and China. These agreements underpin the commercial case and support the financing process.

We have appointed Argonaut PCF as financial adviser and Pareto Securities as manager for fixed income debt financing. An independent technical review has been completed as part of financiers’ due diligence. Site early works are planned to start after FID, with construction taking about 10 to 12 months.

Arrowsmith tenement plan around mining lease M70/1389

The Arrowsmith hub

Arrowsmith Central and Arrowsmith Brand

Two further projects next to Arrowsmith North, held under retention licences.

Arrowsmith Central

76.5 Mt at 96.8% SiO₂

Following an air-core drill program in March 2019, the Mineral Resource Estimate was upgraded to 76.5 Mt at 96.8% SiO₂, including 28.2 Mt Indicated at 96.6% and 48.3 Mt Inferred at 96.9%. A maiden Probable Ore Reserve of 18.9 Mt was declared in September 2019.

Arrowsmith Brand

523 Mt at 97.3% SiO₂

An Inferred Resource contiguous with and south of Arrowsmith North, bounded by the Brand Highway road reserve, with silica sand similar to Arrowsmith North. Testwork indicates similar products can be made using some of the Arrowsmith North infrastructure.