Half Year Accounts
Released
Released
Announcement PDF
VRX SILICA LIMITED
ABN 59 142 014 873
INTERIM FINANCIAL REPORT
FOR HALF-YEAR ENDED
31 DECEMBER 2023
CORPORATE DIRECTORY
DIRECTORS
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director)
SECRETARY
Ian Hobson
REGISTERED AND PRINCIPAL OFFICE
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Telephone: (08) 9226 3780
Facsimile: (08) 9226 3764
Website:
www.vrxsilica.com.au
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 17, 221 St George's Terrace
Perth WA 6000
Telephone: (08) 9323 2000
Facsimile: (08) 9323 2033
AUDITORS
RSM Australia Partners
Level 32, Exchange Tower
2 The Esplanade
Perth WA 6000
AUSTRALIAN SECURITIES EXCHANGE
VRX Silica Limited shares (VRX) are listed on the
Australian Securities Exchange
VRX Silica Limited
1
DIRECTORS’ REPORT
Your directors submit the financial report of the consolidated entity for the half-year ended 31 December
2023. In order to comply with the provisions of the Corporations Act 2001, the directors report as follows:
DIRECTORS
The names of the Directors who held office during or since the end of the half-year and until the date of
this report are noted below. Directors were in office for this entire period unless otherwise stated:
Paul Boyatzis (Non-Executive Chairman)
Bruce Maluish (Managing Director)
Peter Pawlowitsch (Non-Executive Director)
David Welch (Non-Executive Director)
PRINCIPAL ACTIVITIES
The principal continuing activities during the half-year of entities within the consolidated entity was
mineral exploration.
REVIEW OF OPERATIONS
The net loss for the half-year attributable to members of VRX Silica Limited (VRX or Company) was
$2,157,302 (2022: loss of $2,621,638).
The following is a summary of the activities conducted by VRX during the half year to 31 December
2023 at its silica sand projects at Arrowsmith North, Central and Brand (located 270 km north of Perth),
Muchea (located 50 km from Perth) and Boyatup (located 100 km east of Esperance), all situated in
Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development company with
five high-value, advanced, very long-term silica sand projects in Western Australia, a Tier 1 mining
region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases with secure
tenure and a combined 1.4Bn tonne Mineral Resource 1 of 99.6% to 99.9% SiO2 grade silica sand2.
The Company and its management team is based in Western Australia, as are its five large scale, highgrade and low impurity silica sand projects. Each project can be run independently and supply highgrade silica sand to many diverse markets.
Figure 1: VRX Projects Locations
1
2
See table on page 21
See ASX releases on 28 August 2019, 11 November 2022, and 18 October 2019
VRX Silica Limited
2
DIRECTORS’ REPORT
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main ingredient in all
types of glassmaking, including specialty solar panel and high-tech glass. The glass manufacturing
industry demand is increasing at a rate of 5-6% per year, or about 8-10 million tonnes pa. Around 47%
of the world’s glass is manufactured in Asia.
Silica sand is an essential component of the foundry and casting industries. The largest foundry
industry is in Korea where it dominates the industry particularly for large marine components.
Arrowsmith North can produce three grades of sought after foundry sand. Bulk samples have been sent
to Korean and Japanese foundry companies and foundry sand suppliers who have confirmed that the
product meet their rigorous requirements.
Silica sand is also the main ingredient in concrete and is the largest user of available supplies and a
primary reason for depleted resources in Asia including silica sand reserves that may be beneficiated
to glassmaking and foundry quality.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is currently
experiencing increasing demand at a time of a global supply shortfall.
Arrowsmith North
Update on Arrowsmith North Environmental Approvals Process
On 31 October 2023 VRX provided an update on its application for environmental approval (Proposal)
at Arrowsmith North.
The Company announced to ASX on 9 June 2023 that the Environmental Review Document (ERD) for
the Proposal had been accepted by the Department of Water and Environmental Regulation (DWER)
for publication and a four-week Public Environmental Review (PER). The PER period closed on 16 July
2023.
On 7 September 2023 DWER provided the Company with a summary of the public submissions
received during that period. The Company lodged on 31 October 2023 its draft Response to
Submissions (RtS) for consideration by the Environmental Protection Authority of Western Australia
(EPA).
The EPA has collated comments from all relevant State Government departments on the RtS and is
awaiting comments from the Commonwealth Department of Climate Change, Energy, the Environment
and Water. In the interim, the EPA has provided preliminary comments, and the Company has lodged
a response to address these comments. As is standard procedure, the Company will be required to
update its RtS document in response to all formal comments once they are provided by the EPA.
Subject to review and acceptance of the updated RtS document by the EPA, the EPA will prepare an
assessment report recommending whether the Proposal should be approved by the Western Australian
Environment Minister and provide recommended conditions. Environmental approval for Arrowsmith
North is crucial and linked to VRX’s ability to secure other necessary approvals for mining.
VRX appreciates the interest the public has shown in the proposal and is pleased that it has now
progressed to the next stage of the environmental approvals process for Arrowsmith North. The
submissions received during the public review period were reflective of that interest.
The Proposal has the potential to underpin a project lasting many decades and underscores the
enormous economic contribution that could flow to the Irwin Shire in particular and Western Australia
more broadly.
VRX Silica Limited
3
DIRECTORS’ REPORT
Background to the Proposal and Environmental Approvals Process
The Proposal includes the sequential block mining of silica sand, development of a mine feed plant,
moveable surface conveyor, pipeline, processing plant, stockpiles, freshwater supply bore, access
corridor, laydown, administration, water storage and associated infrastructure including a gas fired
power station, communications equipment, offices, a workshop and additional laydown areas. Access
to the site will be via an access road connecting the mine to Brand Highway. A freshwater supply bore,
water pipeline and access road will be located within the Access Development Envelope (ADE). All
other infrastructure will be located within the Mine Development Envelope (MDE).
The Proposal will result in clearing and rehabilitation of up to 353.8 ha of native vegetation, 14.5 ha of
which will remain cleared for the life of the Proposal, and up to 339.3 ha of native vegetation that will
be progressively rehabilitated via Vegetation Direct Transfer (VDT). The VDT methodology can be
viewed at
https://vrxsilica.com.au/miningandrehabilitationmethodology/.
This process includes salvaging and translocating intact sods comprised of soil, sub soil and vegetation
(mulched to a height) to already mined areas for planting. This approach results in minimal disturbance
to plant roots and rapid recovery of native flora.
VRX has previously received confirmation from the Commonwealth Department of Climate Change,
Energy, the Environment and Water for an accredited assessment under the Environment Protection
and Biodiversity Conservation Act 1999 (Cth) (EPBC Act). Accredited assessment means the
Commonwealth can rely on environmental assessments undertaken by the EPA for the purpose of its
approval decisions under the EPBC Act on proposals that may have a significant impact on a matter of
national environmental significance.
VRX has conducted extensive environmental studies on its silica sand projects over a number of
seasons since 2017 in anticipation of requirements of the State and Commonwealth environmental
regulation authorities to undertake approvals assessments. These surveys commenced shortly after
the tenements were acquired and the number and extent of these surveys have expanded following
further consultation with these authorities. The Company has initially concentrated on gaining approval
for development of Arrowsmith North.
The Proposal was referred to DWER for assessment by the EPA under Part IV, Section 38 of the
Environmental Protection Act 1986 (WA) (EP Act) in March 2021. The referral was reviewed and in
May 2021 the EPA determined that the Proposal would be assessed and set the level of assessment
for the Proposal at PER with a requirement for a proponent-prepared Environmental Scoping Document
(ESD) and a four-week public review period for the ERD.
The Company submitted its ESD to the EPA for assessment in September 2021. The ESD was
approved in March 2022.
In May 2022 VRX lodged with the EPA the first-draft ERD for the Proposal. The ERD was prepared
according to the EPA’s Administrative Procedures Manual and other guidance documents and
amendments. The ERD is a comprehensive summary of the Proposal’s environmental setting, the
physical elements of the proposed mine and infrastructure, operational elements, the extent of impacts
on the environment and the proposed rehabilitation and closure plan. VRX received a request from
DWER for further information in early July 2022 and submitted its response later that month.
In November 2022, DWER requested additional information. The Company lodged a revised ERD and
response table in December 2022. VRX then received a request for further information in April 2023
and provided a final ERD to DWER in May 2023, which was accepted by DWER on 8 June 2023 for
publication and the PER.
The final ERD, which comprises a 341-page summary and 32 appendices detailing a comprehensive
environmental impact assessment of the Proposal, was published by the EPA for a four-week PER
period, commencing on 19 June 2023.
VRX Silica Limited
4
DIRECTORS’ REPORT
Arrowsmith Brand Mineral Resource Estimate
In May 2023, VRX announced an extension of its known JORC 2012 compliant Resources at
Arrowsmith with a new Resource at its new Arrowsmith Brand Silica Sand Project, located 270km north
of Perth.
On 19 July 2023 VRX announced the grant of a Mining Lease (M70/1418) at Arrowsmith Brand. The
new Resource is contiguous and south of Arrowsmith North and bounded to the south by the Brand
Highway road reserve.
The Mining Lease has an area of 1,994 Ha and predominately within Exploration Licence E70/5027,
partially within E70/5109 and is contiguous with the granted Arrowsmith North Mining Lease M70/1389.
See Figure 2 below.
The combined Resources at Arrowsmith now provide a future pipeline of additional production utilising
some of the infrastructure to be developed at Arrowsmith North.
Whilst development of Arrowsmith Brand is not a current priority, extended timelines are now
commonplace for mining approvals and this project has the potential to expand production to meet ever
increasing demand for silica sand products.
The silica sand at Arrowsmith Brand is similar to Arrowsmith North, with testwork to-date from samples
within this Resource indicating similar products can be produced.
Figure 2: Arrowsmith Brand Silica Sand Project Location
VRX Silica Limited
5
DIRECTORS’ REPORT
Detailed Information
Arrowsmith Brand generates an additional silica sand project focused on an area of the Arrowsmith
North mineral resource area that is not in the near-term development pipeline and prior work indicated
the potential for nearby additional Resources. By splitting Arrowsmith North at the southern boundary
of the granted mining lease M70/1389 and extending the Resource by drilling to the south, Arrowsmith
Brand was established.
Arrowsmith Brand contains a subset of the previously reported Arrowsmith North mineral resource
estimate (MRE)3, also Figure .
Table 1 below shows the prior Arrowsmith North MRE split between the new Arrowsmith Brand and the
Arrowsmith North Silica Sand Projects.
Arrowsmith North - Mineral Resource
11 November 2022 Estimate
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Measured
10
95.9
1.9
0.7
0.3
0.7
Indicated
237
97.7
1.00
0.40
0.20
0.50
Inferred
521
98.2
0.80
0.30
0.20
0.40
Total
768
98.0
0.90
0.30
0.20
0.40
Arrowsmith North Mineral Resource
in Arrowsmith Brand Project
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Inferred
255
98.0
0.91
0.31
0.17
0.44
Total
255
98.0
0.91
0.31
0.17
0.44
Arrowsmith North Mineral Resource
Ex Arrowsmith Brand Project
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Measured
10
95.9
1.9
0.7
0.3
0.7
Indicated
237
97.7
1.0
0.4
0.2
0.5
Inferred
266
98.4
0.7
0.3
0.2
0.4
Total
513
98.0
0.9
0.3
0.2
0.4
Table 1: Prior Arrowsmith North MRE apportioned to Brand Mineral Resource
3
ASX announcement 11 November 2022, “Arrowsmith North Mineral Resource and Ore Reserve Update”.
VRX Silica Limited
6
DIRECTORS’ REPORT
VRX has completed a vacuum drilling program at Arrowsmith North extending into Arrowsmith Brand.
A total of 68 holes for 786m were drilled on M70/1389 to gain material for future metallurgical testwork
within the proposed Arrowsmith North mining area. These holes infill the existing 50m spaced grade
control drilling which was used to estimate the measured resource and proven reserve. These samples
will not materially change these estimates and have not been assayed.
An additional 49 holes for 656m were drilled on existing tracks to the south in what is now known as the
Arrowsmith Brand Project. These holes infill and extend the prior reported MRE for Arrowsmith North.
Drilling intersected high quality silica sand which has been assayed and modelled and has resulted in
a MRE for Arrowsmith Brand.
Figure 3: December 2022 Drill hole locations.
VRX Silica Limited
7
DIRECTORS’ REPORT
The Arrowsmith Brand MRE is reported in accordance with the JORC Code 2012 Edition. Drilling was
completed generally on an 800m x 800m drill hole grid and defines a band of homogeneous yellow
sand overlying white sand. Drilling encountered zones of clay rich fine sand which were excluded from
the MRE. The potential silica sand products from Arrowsmith Brand are expected to be suitable for
industries such as flat, automobile and container glass manufacturing and foundry casting.
The Arrowsmith Brand MRE is shown in the table below.
Arrowsmith Brand Mineral Resource Estimate
(see ASX release dated 9 May 2023)
Zone
Mt
SiO₂ %
Al₂O₃ %
Fe₂O₃
%
TiO₂ %
LOI %
White
144
98.4
0.8
0.2
0.2
0.4
Yellow
379
96.9
1.6
0.5
0.2
0.7
Total
523
97.3
1.4
0.4
0.2
0.6
Increase over Prior Estimate
268
Classification
Inferred
Million Tonnes
Table 2: Arrowsmith Brand Mineral Resource
*Note: Interpreted mineralisation is above a basal layer of clay and/or limestone. Depletion zones include the upper 0.3
m excluded for rehabilitation purposes. Only areas with a minimum sand depth of 1m were included. Differences may
occur due to rounding. Prior estimate is summarised in Table 1.
Details of the Mining Lease for Arrowsmith Brand are set out in Table 3. See also Figure . VRX expects
to advance the project using the well-known process that has been followed at its other silica sand
projects currently being developed.
These activities include:
•
•
•
•
environmental surveys;
further metallurgical testwork;
marketing studies; and
mine planning studies, which will inform scoping and pre-feasibility studies.
Tenement
Holder
Application date
Grant Date
Area (Ha)
M 70/1418
Ventnor Mining Pty Ltd
01/08/2022
18/07/2023
1,994
Table 3: Arrowsmith Brand tenement details
VRX Silica Limited
8
DIRECTORS’ REPORT
Muchea
Drilling
In April 2023, a Program of Works (PoW) to drill on existing tracks, south of the granted mining lease
M70/1390, was approved by the Department of Energy, Mines, Industry Regulation and Safety (or
DMIRS, as it was then known). This program was planned to infill a previous hand auger program that
was completed as part of the due diligence process prior to the acquisition of the project 4. Vacuum
drilling over 5 days in November 2023 completed 69 holes for 953.5 metres. Drilling was spaced
typically 200m along the tracks infilling the original drilling.
Figure 4: Vacuum drilling at Muchea
As expected, the drilling intercepted high quality white sand, with holes being drilled to the full depth
allowable. Assays are pending. A second stage of drilling has been approved and following completion
of drilling the Mineral Resource Estimate will be updated.
The Company referred a proposal to undertake further exploration drilling and trials of the Vegetation
Direct Transfer rehabilitation methodology (VDT Trials) within M70/1390 to support the future
development of Muchea to the Federal Department of Climate Change, Energy, the Environment and
Water (DCCEEW) for an assessment under the EPBC Act. The Department determined that the
proposal is not a controlled action and that the works may be carried out under certain conditions.
The Company plans to undertake the drilling and VDT trials in the second quarter of 2024.
4
VRX: ASX announcement of 5 April 2018, “Muchea Silica Sand Project Drill Results”
VRX Silica Limited
9
DIRECTORS’ REPORT
Design and Engineering
VRX has largely completed all material engineering work for construction of a 2 million tonne per year
silica sand processing plant at Arrowsmith North, including detailed design.
The engineering has been based on a comprehensive metallurgical testwork program and peer
reviewed process circuit design and testing. The design incorporates some innovative processing
techniques which allows flexibility for the Company to produce multiple products to meet market
requirements for foundry and glassmaking silica sand.
This design work by the engineering team at ProjX, will allow a very long production future at Arrowsmith
North with low emissions and carbon footprint.
During the quarter the Company has progressed with further detailed engineering by Original
Equipment Manufacturers (OEM) both in Australia and overseas, including:
•
•
•
•
Metso OKTOP - Conditioner tank detail engineering
Metso Outotec - Thickener detail engineering
CAVEX Hydrocyclones - Cyclone cluster engineering drawings
Integrated Switchgear and Systems – Switchroom & 415V MCC’s design drawings
VRX has also commissioned the manufacture of a Modified Cat 980 Bucket and Quick Hitch for VDT
trials to be conducted at Muchea.
$2 million Investment Attraction Fund Grant
On 18 July 2023 VRX announced it had received confirmation from the Western Australian State
Government that the Company’s grant application for $2 million in matched funding under the
Investment Attraction Fund (IAF) has been approved with a Financial Assistance Agreement (FAA) for
the grant executed that day.
The IAF is part of the State Government’s Diversify WA initiative, a collaboration between government,
industry and the community supporting the WA Government’s focus on creating secure, quality jobs,
growing and diversifying the economy and attracting new investment.
The grant under the IAF is being awarded on a matched funding, dollar for dollar basis, whereby the
IAF will provide a financial contribution to VRX up to $2m.
The project proposed by VRX will investigate the potential to develop a high purity quartz (or HPQ) flour
manufacturing process and pilot plant in Western Australia, which if successful will lead to the
development of a larger commercial plant for large scale processing.
VRX intends to develop a High Purity Quartz flour manufacturing process to meet a standard of
99.999% SiO2 (5N) purity. This involves the establishment of a new lower purity quartz resource to be
beneficiated in quality, allowing a new manufacturing process tailored to beneficiating the purity of
Western Australia quartz and finally the establishment of the high purity quartz flour manufacturing plant
and the associated supply chains.
The key objective of this project is to commercialise the manufacturing process of High Purity Quartz
flour within Western Australia. This will involve sourcing and beneficiating the purity of lower quality
quartz through primarily mechanical and possibly chemical processes. The establishment of a process
and purity standard has the potential to lead to a manufacturing facility, commercial partners and a
supply chain for the critical minerals.
The three main objectives for the project are:
•
•
•
To determine the key elements that would lead to the successful commercialisation of a
manufacturing process to beneficiate the quality of the lower purity quartz (99.9% SiO 2) to a
higher silica grade.
To complete a pre-feasibility study that would determine the grade of quartz and processing
method that could feasibly be manufactured from its existing feedstocks with a target of reaching
99.999% SiO2 purity quartz flour.
To establish a full-scale manufacturing plant to process the resource into high purity quartz flour
utilising the work from the previous objectives, testwork and marketing carried out as a backbone
to support the future work to be carried out.
VRX Silica Limited
10
DIRECTORS’ REPORT
The HPQ market is one of growing demand but with a relatively small supplier base.
Initially, VRX will investigate the potential for the coarse material that will be produced from Muchea.
Recent pilot plant work completed on a 2.2 tonne bulk sample of Muchea sand indicated that a portion
of project ore may meet the specification required.
Whilst the goal is to achieve the high-quality required, by raising its high-grade silica sand resource
from Muchea to at least “4 nines” (ie. 99.99% SiO2 purity) it would still allow a wide range of high demand
large-value products to be made. This includes use as a feed material for several industries and
downstream products including paint fillers, fibre glass, water purity media, and silica flour for the
production of LCDs and silica gels.
During the half year under review the Company received its first payment under the grant and collected
a bulk sample which has been prepared and shipped to a specialist company in Germany for testwork.
Sample Shipped for High Grade Silica Flour Testwork
On 15 November 2023 VRX announced it had despatched a 1,000kg sample of selected sand from its
Muchea Silica Sand Project to a specialist laboratory in Germany.
The testwork will determine the potential yield, quality and power requirements to produce a suitable
silica flour to be used for manufacturing of LCD glass.
As the market for LCDs is steadily increasing, so to is the requirement for suitable high quality silica
flour used in their manufacturing.
Muchea silica sand has the potential to produce the grade and quality of sand that will provide the raw
material for the production of such silica flour.
This is specialised testwork that will determine the parameters required to produce the quality required
and the economic inputs to assess the viability of the process.
The initial phase of this project is comminution testing of VRX’s selected Muchea sand to determine the
yield and quality of silica flour that can be produced from the raw material. Silica flour is a high value
low iron silica product that has a specific size specification and is primarily used in the production of
LCD glass for display screens.
The demand for HPQ flour has steadily increased as has the price. Figure shows the export price of
silica flour from Taiwan5, over the last 3 years.
Figure 5: Taiwan Export Price – Silica Flour
5
Source: International Trade Administration Republic of China (Taiwan)
VRX Silica Limited
11
DIRECTORS’ REPORT
The production of HPQ flour requires only grinding and classification of the silica sand raw material and
no chemical processing. Closed circuit grinding undertaken with air classification provides the on-spec
size fractions. The process can result in a portion of fines, termed “by-product”. This by-product is a
lower value, but saleable product, that can be used in fiberglass applications, or if sufficiently high
quality, it can be sold into higher value ceramic and paint filler markets. The key to a high margin silica
flour processing operation is starting with the right raw material. The Company believes that the coarse
material at Muchea is suitable and will produce a high yield of suitable silica flour.
Silica flour for LCD glass is one potential commercial outcome from the IAF funded grant program.
Further chemical processing of the silica flour may lead to suitable HPQ which is used in the production
of silicon wafers used in photovoltaic cells for solar panels. Also, the production of silica gels requires
high quality silica powders, these can be used in thermal protection for lithium ion batteries and many
other applications. Thermal processing of silica flour and powders can produce other high value
products such as Cristobalite and fumed silica.
These research and development activities, which start with the production of silica flour, will ultimately
result in high value downstream processing opportunities that will maximise the value of VRX’s worldclass high-quality Muchea Silica Sand Project.
Dandaragan Geothermal Project
Farm-in and JV Agreement
On 3 November 2023 VRX announced it had entered into a Farm-In and Joint Venture Agreement
(Agreement) with Hydro X Gen Pty Ltd (HXG) for the Company’s granted Geothermal Exploration
Permit (GEP) at Dandaragan, 145km north of Perth, Western Australia.
HXG is planning to conduct an initial public offering and list on the ASX as Steam Resources Limited
(www.steamresources.com.au) in 2024 (Steam).
Geothermal technology has the potential to produce long term dispatchable renewable energy for the
Mid-West region, including VRX’s Arrowsmith silica sand projects.
The grant of GEP 44 to VRX was announced to ASX on 28 July 2023. The permit was subsequently
transferred and the Agreement novated to a VRX 100% owned subsidiary, VRX Geothermal Pty Ltd.
It consists of 8 contiguous blocks and the area includes the Walyering gas field currently under
development by the EP447 Joint Venture between Strike Energy (55%) and Talon Energy (45%). The
project provides an opportunity to work with these gas companies and use extensive historical and
current data to explore potential geothermal power options.
Under the terms of the Agreement, Steam can earn up to a 90% interest in GEP 44. Steam is required
to complete an agreed exploration program and drilling campaign by 31 July 2026 to earn an initial 40%
interest in the project and an additional 30% interest by completing a feasibility study assessing the
economic viability of the production of energy from geothermal sources within the project area by that
date. Steam may earn an additional 20% interest upon the production of energy from geothermal
sources within the project area by 31 July 2029. VRX is not required to contribute funding for
development of the geothermal project.
Steam has the requisite experience and expertise to explore and develop the project. Steam Resources
is of the view that Permit 44 represents a unique development opportunity for geothermal energy
production in Western Australia that will complement their other project areas in the Northern Territory
and South Australia.
This geothermal exploration initiative was undertaken by VRX to support its silica sand projects and
long-term ambitions for the production of glass in Western Australia. Geothermal energy is a reliable,
long-term renewable energy source and an opportunity for a new renewable energy industry in the Mid
West.
The board and management of VRX are impressed by the credentials of Steam’s management team
and look forward to working with them to realise the full potential of the Dandaragan geothermal project.
VRX will retain the rights to any minerals that may be encountered in the development of the geothermal
project.
VRX Silica Limited
12
DIRECTORS’ REPORT
GEP 44
In December 2021 VRX lodged an Acreage Release nomination with the Department of Energy, Mines,
Industry Regulation and Safety (DEMIRS) for specified areas in the Mid-West to be included in a
geothermal acreage release. In January 2022 DEMIRS released 21 areas in Western Australia for
applications for GEPs with a closing date for applications of 21 April 2022. GEPs are administered by
DEMIRS under the Petroleum and Geothermal Energy Resources Act 1967 (PGERA) with areas
released as a Discrete Area Release. Successful applications are determined through a competitive
bidding system. VRX has made application for three GEPs, granted GEP 44, and has been notified the
other two permits are progressing through a section 69A PGERA consultation phase. There is no
timeline for this process. The GEP 44 has been denoted as the Dandaragan Geothermal Project.
GEP
Holders
Grant Date
Term
5l Blocks
44
VRX Silica Ltd
27 July 2023
6 years
8
Table 4: VRX Geothermal Exploration Permits
Figure 6: Dandaragan Geothermal Exploration Permit Location
VRX Silica Limited
13
DIRECTORS’ REPORT
What is Geothermal Energy?
Geothermal energy is a clean, virtually emissions-free, renewable energy resource produced from
underground reservoirs of water naturally heated by Earth’s internal heat. Steam and brine produced
from these underground reservoirs can be used to turn turbines to produce electricity either directly or
using “organic rankine cyc
Share your feedback
Discover