Signficant reduction in corporate overheads
and costs management
Key points:
Completion of top-down review of corporate
overheads and expenditure
Director fees and salaries reduced by 50%
together with costs control measures introduced
across exploration activities, personnel and admin
VRX well-funded following recent fully
underwritten entitlement offer with Arrowsmith
North environmental approvals process nearing
completion
VRX Silica Limited (VRX or Company) (ASX:VRX) announces
completion of a top-down review of corporate overheads and
expenditure, following its recent $2.46m fully underwritten
entitlement offer.
The Company has introduced cost saving initiatives across the
business, with director fees and salaries reduced by 50% and
significant cost control measures implemented on non-critical
exploration activities and project development costs, personnel
and corporate administration. The changes take effect
immediately.
The Company continues to progress as its main priority the
environmental approvals process for its Arrowsmith North
Silica Sand project, which is now in its final stages. An update
in this regard was provided to ASX on 30 May 2024.1
The Company expects these cost control measures will remain
in place through to completion of this process.
VRX Chairman, Paul Boyatzis commented, “Pleasingly VRX is
through to the final stages of the environmental approvals
process for Arrowsmith North and management continues its
dialogue with both State and Federal authorities to complete
this process.
1 ASX announcement dated 30 May 2024, Arrowsmith North Environmental
Approval Update
ASX: VRX
Capital Structure
Shares on Issue:
628 million
Unlisted Options:
104 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
Geothermal Energy
Dandaragan Geothermal
Energy Permit, 145km
north of Perth, WA
The Company is actively
assessing other silica sand
and downstream
processing projects in
Australia.
“Whilst the Company is well funded following its recent capital raising, the Board is cognisant
of the need to preserve capital as the regulatory approvals process continues beyond originally
expected timeframes. These cost control measures form part of a prudent capital
management program for the Company and have been implemented to ensure that VRX is
best positioned to advance Arrowsmith North into development and production.
“Shareholder frustration at industry-wide delays in the approvals process is evident and
understandable, and the Board thanks shareholders for their continued support and patience.”
In accordance with ASX listing rule 3.16.4, the Company advises that the annual base salary
of VRX Managing Director, Bruce Maluish, will reduce from $340,000 to $170,000 (plus
statutory superannuation). There are no other changes to his employment terms.
This announcement has been authorised for release to ASX by the Chairman, Paul Boyatzis.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 54
2
ASX Announcement
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed on the
ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand and Central),
Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity on
the planet after air and water. It is the main
ingredient in all types of glassmaking,
including specialty solar panel and hightech glass, and foundry casting. It is a
finite resource that is running out, with the
Asia-Pacific region experiencing an evergrowing supply shortfall that is driving up
prices.
Arrowsmith is located 270km north of
Perth. Arrowsmith North boasts a minimum
25-year mine life capable of producing
more than 2Mt tonnes per year of highgrade (99.7% SiO2)* silica sand for export
to the foundry, container glass and flat
glass markets in Asia, with permitting well
advanced, and will lead production.
Muchea, located 50km north of Perth, is an
ultra-high-grade (99.9% SiO2)* silica sand
project capable of producing sand required
for ultra-clear glass for solar panels and
other high-tech glass applications.
Boyatup, located 100km east of Esperance,
is under
development and capable of producing
sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
Share your feedback
Discover