Emergence of a new mining sector
Arrowsmith and Muchea
Silica Sand Projects
July 2022
Important information
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this document, VRX has not considered the objectives,
investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk. There is no guarantee of exploration success, and even if exploration success is achieved, there is no guarantee that development
of any mineral deposit will be economically viable VRX strongly suggests that investors consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To the maximum extent permitted by law, none of VRX, its
related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from
the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words “anticipate“, believe”,“ expect”,“ project”,“
forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on, revenue models, pricing, earnings and financial position and performance are also forward
looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of VRX, its related bodies corporate, and their
directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or achievements may vary materially from any projections
and forward looking statements and the assumptions on which those statements are based In particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time prove
to be false, inaccurate or incorrect Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything contained in it forms the basis of any contract or
commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States The securities of VRX have not been, and will not be, registered under the US Securities
Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction of the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the Securities Act and
any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws.
Competent Persons Statement
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Exploration Results and Muchea Aircore Drilling Area Mineral Resources are based on data collected and compiled under the supervision of Mr David Reid,
who is a full-time employee of VRX Silica. Mr Reid, BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and
the activity being undertaken to qualify as a Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the
form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Auger area Mineral Resources is based on information compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction and
supervision of Dr Andrew Scogings, who is an Associate of CSA Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. He is a Registered Professional Geologist in
Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the
Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the disclosure of information in this report in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Probable Ore Reserves is based on data collected and compiled under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr Reid,
BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and context in which it appears.
Project Highlights
WA based, pure-play silica sand mining company with advanced silica sand projects
100+ year production life
❑ 100% owner of three high value Silica Sand Projects in Western Australia - Tier 1 mining region
❑ Multi-decade-scale contiguous sand deposits with significant high-grade Resources
❑ Most-advanced non-private silica sand projects in Australia with planning, heritage and
environmental studies having commenced in 2017
❑ Initial offtake term sheet signed for supply to S. Korean foundry industry, with strong interest from
other potential customers in SE Asia at a time of diminishing global supply and increasing demand
❑ Arrowsmith North to lead staggered/disciplined development – first production expected mid 2023
– followed by Muchea and Arrowsmith Central
❑ Mining Leases granted over all three projects with permitting and infrastructure preparations welladvanced
❑ Scale of projects provides long-term opportunity for silica sand export and glass manufacturing
and downstream industries in Western Australia
3
Silica Sand
The foundation of modern cities
❑ Silica sand is the most-used commodity on the planet after
air and water.
❑ It is the main ingredient in all types of glassmaking,
including specialty solar panel and high-tech glass.
❑ Around 47% of the world’s glass is made in Asia, and the
glass manufacturing industry is increasing at a rate of 5-6%
per year – or about 8-10 million tonnes.
❑ Silica sand is also the main ingredient in concrete.
❑ It is a finite resource that is running out.
❑ The Asia-Pacific region is currently experiencing a supply
shortfall and increasing demand.
4
Silica Sand – World Class Portfolio
Project development pipeline to ensure disciplined, staged
development of world-class assets
❑ WA based company and management team
❑ Most advanced non-private projects in Australia
❑ Three large scale, high grade and low impurity silica sand projects
– Arrowsmith North, Arrowsmith Central and Muchea
❑ Each project can be run independently and supply raw material
to diverse markets
❑ Simple and low impact mining and processing
❑ Access to established infrastructure (logistics, power, water, gas)
– rail lines to port run adjacent to all project tenements
– gas pipelines run adjacent to each of the project areas
❑ Infrastructure planning and permitting well-advanced
5
Corporate Summary
Capital Structure
Share Price
Ordinary Shares on Issue
558 million
Options on Issue
35 million
Market Capitalisation
Person
Role
Experience
Paul Boyatzis
Chairman
Governance: Over 30 years experience in investment, equity
markets and managing public companies
Bruce Maluish
Managing
Director
Technical and Finance: Over 35 years in mining industry
including previous roles as ASX MD and General Manager
Peter
Pawlowitsch
NonExecutive
Director
David Welch
13cps *
$75 million*
Cash
$9 million
Debt
Nil
Enterprise Value
$66 million
Shareholders
Board and Management
12%
Senior executive in Finance and Corporate roles
Top 20 Total
33%
NonExecutive
Director
Senior executive responsible for strategy, business
transformation and performance, commercial negotiations,
stakeholder engagement for major projects
Broker Coverage
Steven
Papadopoulos
Commercial
Manager
Legal and Commercial: Over 20 years experience as corporate
lawyer and commercial advisor in resources and other
industries
Yoonil Kim
Marketing
Manager
Marketing: 16 years’ experience selling silica sand in the Asian
market
Argonaut
Euroz Hartleys
* Share price on 28 June 2022
6
Arrowsmith North
Near-term development opportunity on a world-class silica sand project
❑ Production expected to commence mid 2023 (subject to final environmental approvals)
❑ 223Mt ore reserve @99.7% SiO2(100 year production!)
❑ Tailored 2Mtpa processing plant with patented process circuit, revised capital estimate and DFS
underway
❑ Access to established infrastructure –
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer
❑ Access by adjacent Brand Highway
❑ Hybrid gas and solar power supply
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral Resource and Ore Reserves for the
Arrowsmith North, Arrowsmith Central and Muchea Silica Sand Projects is extracted from releases to ASX on 28 August 2019, 17
September 2019 and 18 October 2019, respectively. The Company confirms that it is not aware of any new information or data that
materially affects the information included in this document and all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
7
Responsible Mining – The VRX Way
A made-for-purpose mining method
designed around continuous rehabilitation
❑ VRX has developed a unique and progressive
mining method for its silica sand projects
❑ The Vegetation Direct Transfer (VDT) method
provides a rapid and comprehensive regeneration
of mined areas based on continuous rehabilitation
as mining progresses
❑ The VDT method removes a 400mm-deep sod
with topsoil containing the vast majority of native
flora and invertebrate fauna remining intact
❑ Root structures in the loose sand are relatively
shallow at 200-300mm in depth.
8
Exploration
https://vrxsilica.com.au/miningandrehabilitationmethodology/
9
Arrowsmith North
Environmental and Mining Approvals
❑Confirmation by Cwlth Department of Agriculture, Water and the Environment of
accredited State approval under the EPBC Act
❑State Department of Water and Environmental Regulation and Environmental
Protection Authority (EPA) require PER assessment
❑Environmental Scoping Document (ESD) Approved 15 March 2022
❑Environmental Review Document (ERD) lodged 14 April 2022
❑No further direction on any future requirements or timing until
comments from PER on published ERD received from EPA (imminent)
❑Mining proposal for DMIRS drafted and lodgement subject to receipt of comments
on ESD
10
Arrowsmith Central
Environmental and Mining Approvals
❑Confirmation by Cwlth Department of Agriculture, Water and the
Environment of accredited approval under the EPBC Act
❑State Department of Water and Environmental Regulation and
Environmental Protection Authority (EPA) require PER assessment
❑Environmental Scoping Document (ESD) lodged 29 June 2022
❑Environmental Review Document (ERD) prepared and will lodge on
ESD approval
11
Processing Flowsheet
Simplified wet processing, multiple products, no dust, 2mtpa processing plant at each site
Processing Plant Design
▪ Arrowsmith North, Arrowsmith
Central and Muchea to each have
2 Mtpa processing capacity
▪ No toxic chemicals required
12
Muchea
Large scale, world class high-grade and low impurity silica sand project
❑ Production to follow Arrowsmith North subject to EPA approval
❑ Unique mining/rehabilitation method and duplicate plant
❑ Access to established infrastructure
❑ Underutilised railway connects to Kwinana (100km)
❑ Grid power
❑ Water from Yaragadee deep aquifer
❑ Adjacent to Brand Highway
❑ Granted Mining Lease and Miscellaneous Licences for access
❑+99.9% SiO2 - <100ppm Fe2O3 after processing (high-grade)
❑Raw material for premium ultra-clear cover glass production for solar panels
❑Potential for manufacturing cover glass from adjacent gas/hydrogen pipeline
13
Low grasses and sedges suitable for VDT
VRX Silica
14
Sustainability
Environmental, Social and Governance (ESG)
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals
CLEAN ENERGY
Utilising reliable,
renewable
modern energy
ECONOMIC
GROWTH
INDUSTRY
INNOVATION
SUSTAINABLE
COMMUNITIES
RESPONSIBLE
PRODUCTION
CLIMATE
ACTION
REHABILITATION
PLAN
Enhancing
economic and
productive
employment
Building
resilient
infrastructure
and fostering
innovation
Respecting
heritage values
Employing
sustainable
mining
methods
Reducing
emissions from
production
Employing direct
vegetation
transfer as
a unique
rehabilitation
method
15
Right time – Right place for WA and its economic
advantages of silica sand and gas reserves
❑ Very long life, high-grade silica sand supply with combined 1bn tonne Resource,
99.6% to 99.9% SiO2 grade
❑ WA domestic gas reserves and burgeoning hydrogen projects in mid-west
❑ Long term supply of essential raw materials and green energy for glass
manufacturing (gas/solar/hydrogen)
❑ High-tech ultra-clear glass production capability from Muchea
❑ Manufacturing of solar panels in WA for a huge and growing market in Australia
Opportunity to build world-class glass manufacturing and
downstream processing industries in Western Australia
16
Thank you