MiningNews Select Conference Presentation
Released
Released
Announcement PDF
ASX Announcement
19 September 2023
VRX to present at MiningNews Select Conference
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is
presenting at the MiningNews Select conference in Perth,
Western Australia today.
Managing Director Bruce Maluish will be providing investors
with an update on the Company’s silica sand projects at the
conference from 12:40pm WST. A copy of the presentation
follows this announcement.
See a recording of an interview with Mr Maluish given at the
conference at VRX MiningNews Select Interview.
This announcement has been authorised for release to ASX
by the Managing Director, Bruce Maluish.
ASX: VRX
Capital Structure
Shares on Issue:
572.9 million
Unlisted Options:
49.8 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
Geothermal Energy
Dandaragan Geothermal
Energy Permit, 145km
north of Perth, WA
The Company is actively
assessing other silica sand
projects in Australia.
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed on the
ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand and Central),
Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity
on the planet after air and water. It is
the main ingredient in all types of
glassmaking, including specialty solar
panel and high-tech glass, and foundry
casting. It is a finite resource that is
running out, with the Asia-Pacific
region experiencing an ever-growing
supply shortfall that is driving up prices.
Arrowsmith is located 270km north of
Perth. Arrowsmith North boasts a
minimum 25-year mine life capable of
producing more than 2Mt tonnes per
year of high-grade (99.7% SiO2)* silica
sand for export to the foundry,
container glass and flat glass markets
in Asia, with permitting well advanced,
and will lead production.
Muchea, located 50km north of Perth,
is an ultra-high-grade (99.9% SiO2)*
silica sand project capable of producing
sand required for ultra-clear glass for
solar panels and other high-tech glass
applications.
Boyatup, located 100km east of
Esperance, is under
development and capable of producing
sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
2
VRXSILICA
Silica Sand
“Essential to World Growth”
September 2023
Important information
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be
read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this document, VRX has not
considered the objectives, investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk. There is no guarantee of exploration success, and even if exploration
success is achieved, there is no guarantee that development of any mineral deposit will be economically viable VRX strongly suggests that investors consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To the maximum extent
permitted by law, none of VRX, its related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any
liability arising out of fault or negligence for any loss arising from the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words “anticipate“,
believe”,“ expect”,“ project”,“ forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on, revenue models, pricing, earnings
and financial position and performance are also forward looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of VRX, its related
bodies corporate, and their directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or
achievements may vary materially from any projections and forward looking statements and the assumptions on which those statements are based In particular, potential revenue opportunities and guideline pricing models
set out in this document are based on certain assumptions which may in time prove to be false, inaccurate or incorrect Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no
obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything contained in it forms the
basis of any contract or commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States The securities of VRX have not
been, and will not be, registered under the US Securities Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction of the United States, and may not be offered or sold in the United States
except in compliance with the registration requirements of the Securities Act and any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the
Securities Act and any other applicable securities laws.
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral Resources and Ore Reserves for the Company’s silica sand projects is extracted from releases to ASX on 28 August 2019 and 11
November 2022 (Arrowsmith North) , 17 September 2019 (Arrowsmith Central), 9 May 2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and 18 August 2022 (Boyatup). The Company confirms that it is not aware of any
new information or data that materially affects the information included in this document and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
“Sand is the main material
that modern cities are made of ”
Vince Beiser
“The World in a Grain” 2018
The story of sand and how it
transformed Civilisation
Silica Sand - the Second-most
Consumed Material on Earth
4
“Humans are estimated to
consume nearly 50 billion tons
of sand every year”
“World Construction Aggregates”, 2016
The world is facing a global sand crisis
6
Market Outlook
Asian glass making production increasing 5-6% per year (~8 - 10Mtpa Growth)
VRX Target Market - Flat, Container, Architectural, Thin Film Glass, and;
Metal Casting/Foundry for Automobile Parts
Glassmaking silica sand demand by region*
Use
Spec
4%
5%
Market in
Asia
Growth in
Asia
Float (Plate) Glass
99.5% SiO2
60 - 65Mt
5% - 6%
Container Glass
99.5% SiO2
70 - 75Mt
5% - 6%
Cover Glass
(Solar Panels)
99.95% SiO2 & Low Fe
5 - 6Mt
+30%
Smart Glass
(Ultra Clear)
99.97% SiO2 & Low Fe
1 - 2Mt
5% - 6%
Specialist Glass
(Thin Screen)
99.97% SiO2
500 - 600kt
+10%
8%
47%
16%
VRX’s Target
Market
20%
Asia Pacific
Western Europe
Africa/Middle East
North America
Eastern Europe
Central and South America
*Source: Freedonia estimate
7
World Class Silica Sand Projects
Project development pipeline to ensure disciplined, staged
development of world-class assets
❑ WA-based company and management team
❑ Most advanced non-private silica sand projects in Australia
❑ Five very large scale, high grade and low impurity silica sand
projects each project capable of independent operation to supply
processed material to diverse markets
❑ Simple, low impact mining and processing
❑ Access to established infrastructure (logistics, power, water and
gas)
– rail lines to port run adjacent to all project tenements
– gas pipelines run adjacent to each of the project areas
❑ Scale of projects provides long-term opportunity for silica sand
export and potential glass manufacturing and downstream
8
industries in Western Australia
Portfolio Highlights
WA-based, pure-play silica sand company with advanced silica sand projects
100+ year production life
❑ 100% owner of five high value silica sand projects in Western Australia - Tier 1 mining
region
❑ Multi-decade-scale contiguous sand deposits with significant high-grade Resources
❑ Most-advanced non-private silica sand projects in Australia
❑ Mining Leases granted over four projects with permitting and infrastructure
preparations well-advanced
❑ Arrowsmith North to lead staggered development. First production expected 2023
– followed by Muchea, Arrowsmith Central, Boyatup and Arrowsmith Brand
❑ Strong interest from customers in Southeast Asia at a time of diminishing global
supply and increasing demand
9
WA Silica Sand Projects
Muchea (100%)
Arrowsmith North (100%)
•
•
•
•
High-grade with exceptional financial metrics
Close proximity to port and rail infrastructure
Glass making, foundry and ceramic markets
Potential +100 year mine life:
- JORC Resource of 771Mt @ 98% SiO2
- (Ind 248Mt @ 97.7% SiO2; Inf 523Mt @ 98.2% SiO2)
- Probable Ore Reserve of 223 Mt @ 99.7% SiO2
• BFS completed Aug 2019
•
•
•
•
Very high-grade product with outstanding financial metrics
Well located to key port and rail infrastructure
Specialist glass products
Potential +100 year mine life:
- JORC Resource 208Mt @ 99.6% SiO2
- (Ind 29Mt @99.6% SiO2; Inf 179Mt @ 99.6% SiO2)
- Probable Ore Reserve of 18.7Mt @ 99.9% SiO2
• BFS completed Oct 2019
Arrowsmith Central (100%)
•
•
•
•
High grade with strong financial metrics
Adjacent to rail infrastructure to port
Container glass and foundry products
Significant resource base:
- JORC Resource of 76.5 Mt @ 96.8% SiO2
- (Ind 28.2Mt @ 96.6% SiO2; Inf 48.3Mt @ 96.9% SiO2)
- Probable Ore Reserve of 18.9 Mt @ 99.6% SiO2
• BFS completed September 2019
Geraldton Port
Kwinana Port
10
Arrowsmith North
Near-term development opportunity for a world-class silica sand project
❑ Production expected to commence 6-8 months following final environmental approvals
❑ 221Mt Ore Reserve @99.7% SiO2 (100-year production) (See Reserve Table)
❑ Grade controlled Proved Ore Reserve 9.2Mt for first 6 years of production
❑ Tailored 2Mtpa processing plant with patented process circuit, revised capital estimate and DFS
underway
❑ Access to established infrastructure –
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer
❑ Access by adjacent Brand Highway
❑ Hybrid gas and solar power supply
11
Exploration
12
Responsible Mining – the VRX Way
A made-for-purpose mining method
designed around continuous rehabilitation
❑ VRX has developed a unique and progressive
mining method for its silica sand projects
❑ The Vegetation Direct Transfer (VDT) method
provides a rapid and comprehensive regeneration
of mined areas based on continuous rehabilitation
as mining progresses
❑ The VDT method removes a 400mm-deep sod
with topsoil containing the vast majority of native
flora and invertebrate fauna remaining intact
❑ Root structures in the loose sand are relatively
shallow at 200-300mm in depth
13
Arrowsmith North
Environmental and Mining Approvals
❑ Confirmation by Commonwealth Department of Agriculture, Water and the Environment of
accredited State approval under the EPBC Act
❑ State Department of Water and Environmental Regulation and Environmental Protection Authority
(EPA) require PER assessment
❑ Environmental Scoping Document (ESD) approved in March 2022
❑ Environmental Review Document (ERD) lodged in April 2022 and amended June 2022 and again
February 2023
❑ ERD published by EPA for Public Review period ending 16 July 2023
❑ VRX preparing response to submissions
❑ Mining proposal for DMIRS lodged for assessment in parallel with ERD
14
Arrowsmith Central
Environmental and Mining Approvals
❑Confirmation by Commonwealth Department of Agriculture, Water and
the Environment of accredited approval under the EPBC Act
❑State Department of Water and Environmental Regulation and
Environmental Protection Authority (EPA) require PER assessment
❑Environmental Scoping Document (ESD) lodged with EPA in June 2022
❑Environmental Review Document (ERD) prepared and will lodge on ESD
approval
15
Arrowsmith Brand
Long-term future development opportunity for another world-class silica sand
project
❑ Production in conjunction with Arrowsmith North by independent processing or an expanded
Arrowsmith North processing plant
❑ 523Mt Inferred Resource @97.3% SiO2 (See Resource Table)
❑ Granted Mining Lease
❑ Access to infrastructure at Arrowsmith North–
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer bore at Arrwosmith North
❑ Adjacent to Arrowsmith North access road to Brand Highway
❑ Power supply can be extended to either Arrowsmith Brand independent processing or an
expanded Arrowsmith North processing plant
16
Muchea
Large scale, world class high-grade and low impurity silica sand project
❑ Production to follow Arrowsmith North subject to EPA approval
❑ Utilise VDT and duplicate plant
❑ Access to established infrastructure
❑ Underutilised railway connects to Kwinana (100km)
❑ Grid power
❑ Water from Yaragadee deep aquifer
❑ Adjacent to Brand Highway
❑ Granted Mining Lease and Miscellaneous Licences for access
❑ Significant metallurgical testwork +99.9% SiO2 - <100ppm Fe2O3 after processing (high-grade,
low impurity)
❑ Raw material for premium ultra-clear cover glass production for solar panels
❑ Potential for manufacturing cover glass from adjacent gas/hydrogen pipeline
17
VRX Silica
18
VRX Silica
19
Processing Flowsheet
Simplified wet processing, multiple products, no dust, 2mtpa processing plant at each site
Processing Plant Design
▪ Arrowsmith North, Arrowsmith
Central and Muchea to each have
2 Mtpa processing capacity
▪ No toxic reagents required
20
Processing
Plant Design
No dust
No toxic chemicals
Sustainability, Environment,
Social and Governance (ESG)
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals
CLEAN ENERGY
ECONOMIC
GROWTH
INDUSTRY
INNOVATION
SUSTAINABLE
COMMUNITIES
RESPONSIBLE
PRODUCTION
CLIMATE
ACTION
REHABILITATION
PLAN
Utilising reliable,
renewable
modern energy
Enhancing
economic and
productive
employment
Building
resilient
infrastructure
and fostering
innovation
Respecting
heritage values
Employing
sustainable
mining
methods
Reducing
emissions from
production
Employing direct
vegetation
transfer as
a unique
rehabilitation
method
22
Australian Production
Potential silica sand mining sector in Australia
23
Other Initiatives
VRX is investigating other potential downstream products and cost saving alternatives
❑Critical Minerals Prospectus – VRX projects at Arrowsmith North and Muchea
were included in the Critical Minerals Prospectus published by Austrade
❑IAF Grant - VRX has received a grant from the State Innovation Attraction Fund
to investigate the production of silica flour
❑Geothermal Energy – Granted a geothermal permit at Dandaragan
❑Trials of VDT - VRX has applied for a NVCP at Muchea to trial the practicalities
of VDT in various vegetation types at Muchea
24
Our Team
Board
Person
Role
Executive
Experience
Paul
Boyatzis
Chairman
Governance: over 30 years’ experience in
investment, equity markets and managing
public companies
Bruce
Maluish
Managing
Director
Technical and finance: over 40 years’ experience
in mining industry including previous roles as
ASX MD and General Manager
Peter
Pawlowitsch
NonExecutive
Director
Senior executive: finance and corporate roles
David Welch
NonExecutive
Director
Senior executive: responsible for strategy,
business transformation and performance,
commercial negotiations
Person
Role
Experience
Ryan Baxter
General
Manager
Production: 15 years’ experience in mining
and construction with last 9 years
exporting silica sand
David Reid
Exploration
Manager
Technical: responsible for exploration and
mineral processing
Steven
Papadopoulos
Commercial
Manager
Legal and commercial: over 20 years’
experience as corporate lawyer and
commercial advisor in resources and other
industries
Yoonil Kim
Marketing
Manager
Marketing: 18 years’ experience selling
silica sand in the Asian market
25
Corporate Summary
Capital Structure
Share Price
11cps *
Ordinary Shares on Issue
573 million
Options on Issue
50 million
Market Capitalisation
$66 million*
Cash
$4.0 million**
Debt
Nil
Enterprise Value
$63 million
Shareholders
Board and Management
12%
Top 20 Total
33%
* Closing share price on ASX on 8 September 2023
** SPP underway
26
Right Time, Right Place
Opportunity for WA to capture its economic advantages of silica sand and gas reserves to
build world-class glass manufacturing and downstream processing industries
❑ Very long life, high-grade silica sand supply with combined 1.4 billion tonne Resource,
99.6% to 99.9% SiO2 grade (see Resources and Reserves Table at end of presentation)
❑ WA domestic gas reserves and burgeoning hydrogen projects in mid-west
❑ Long term supply of essential raw materials and green energy for glass manufacturing
(gas/solar/hydrogen)
❑ High-tech ultra-clear glass production capability from Muchea
❑ Manufacturing of solar panels in WA for a huge and growing market in Australia
27
Thank you
Bruce Maluish
Managing Director
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Phone: 08 9226 3780
Email: info@vrxsilica.com.au
Silica Sand Resources and Reserves
Ore Reserves - as at 09/05/2023
Mineral Resources - as at 09/05/2023
Project
Classification
Indicated
Muchea
Inferred
Total
Measured
Arrowsmith
Indicated
North
Inferred
Total
Arrowsmith
Inferred
Brand
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup
Total
Total Mineral Resource
Mt
SiO₂
%
Al₂O₃ Fe₂O₃
%
%
29
99.6
0.1
179
99.6
0.1
208
99.6
0.1
10
95.9
1.9
237
97.7
1.0
266
98.4
0.7
513
98.0
0.9
523
97.3
1.4
523
97.3
1.4
28.2
96.6
1.7
48.3
96.9
1.5
76.5
96.8
1.5
60
67.8
0.8
60
67.8
0.8
1,381 Million Tonnes
0.0
0.0
0.0
0.7
0.4
0.3
0.3
0.4
0.4
0.4
0.4
0.4
0.2
0.2
TiO₂
%
LOI
%
0.1
0.1
0.1
0.3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.7
0.5
0.4
0.4
0.6
0.6
0.7
0.7
0.7
0.9
0.9
Project
Classification
Product
Mt
SiO2
%
Al2O3 Fe2O3
%
%
F80
10.2
99.9
0.02 0.008
Muchea
Probable
F80C
4.25
F150
4.25
99.8
0.07 0.015
Muchea Ore Reserve
18.7 Million Tonnes
AFS20
0.8
99.5
0.25
0.07
AFS35
3.9
99.5
0.5
0.06
Proved
AFS55
2.7
99.2
0.5
0.1
Local
1.8
Arrowsmith
Proved Ore Reserve
9.2 Million Tonnes
North
AFS20
24.2
99.5
0.25
0.07
AFS35
102.5 99.5
0.5
0.06
Probable
AFS55
51.1
99.2
0.5
0.1
Local
34.1
Probable Ore Reserve
212 Million Tonnes
Arrowsmith North Ore Reserve
221 Million Tonnes
CF400
4.2
99.6
0.25
0.04
C20
8.4
Arrowsmith
Probable
C40
4.2
Central
High TiO2
2.2
<1%
Arrowsmith Central Ore Reserve
18.9 Million Tonnes
Total Ore Reserve 259 Million Tonnes
TiO2
%
LOI
%
0.03
0.1
0.035
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.03
0.1
2%
29
Share your feedback