VRX Investor Webinar
Released
Released
Announcement PDF
ASX Announcement
30 May 2024
VRX Investor Webinar
VRX Silica Limited (VRX or Company) (ASX:VRX) is pleased
to host an investor webinar with Managing Director, Bruce
Maluish at 11:30am AEST/9:30am WST on Friday, 31 May
2024.
During the webinar Mr Maluish will provide an update on the
Company’s progress at its silica sand projects, including on
the environmental approvals process at Arrowsmith North.
Register for the investor webinar via MarketOpen Direct
Connect using the link below:
https://us06web.zoom.us/webinar/register/WN_Hyw80jtjS
1y5kPUKMGxH5g
After registering, you will receive a confirmation email
containing information about joining the webinar.
Questions should be pre-submitted to info@vrxsilica.com.au
ahead of the webinar.
This announcement has been authorised for release to ASX
by the Managing Director, Bruce Maluish.
ASX: VRX
Capital Structure
Shares on Issue:
628 million
Unlisted Options:
104 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
Further information:
Geothermal Energy
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 54
Dandaragan Geothermal
Energy Permit, 145km
north of Perth, WA
The Company is actively
assessing other silica sand
and downstream
processing projects in
Australia.
ASX Announcement
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed on the
ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand and Central),
Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity on
the planet after air and water. It is the main
ingredient in all types of glassmaking,
including specialty solar panel and hightech glass, and foundry casting. It is a
finite resource that is running out, with the
Asia-Pacific region experiencing an evergrowing supply shortfall that is driving up
prices.
Arrowsmith is located 270km north of
Perth. Arrowsmith North boasts a minimum
25-year mine life capable of producing
more than 2Mt tonnes per year of highgrade (99.7% SiO2)* silica sand for export
to the foundry, container glass and flat
glass markets in Asia, with permitting well
advanced, and will lead production.
Muchea, located 50km north of Perth, is an
ultra-high-grade (99.9% SiO2)* silica sand
project capable of producing sand required
for ultra-clear glass for solar panels and
other high-tech glass applications.
Boyatup, located 100km east of Esperance,
is under
development and capable of producing
sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
Share your feedback
Discover