Quarterly Activities Report
Released
Released
Announcement PDF
During the September 2015 Quarter, Ventnor Resources Limited (ASX: VRX) (Ventnor or
Company) conducted the following activities:
EXPLORATION
Thaduna/Green Dragon JV – Copper
Ventnor Resources Ltd (Ventnor or the Company) is a base-metals focused explorer which
had, since listing on the ASX in February 2011, focused on defining a copper resource at the
historic Thaduna/Green Dragon copper project which is located 170km north of Meekatharra in
Western Australia.
In the 30 months following Ventnor’s listing, the Company drilled more than 65,000 metres of
RC and diamond core at the Thaduna/Green Dragon Copper Project with supporting
metallurgical testwork and multi-element assays.
Ventnor shareholders voted unanimously for the Company to enter a landmark farm-in and joint
venture agreement with Sandfire Resources NL (Sandfire) which was finalised 4 December
2013.
This agreement removed the need for Ventnor to raise additional funding for mine development
and enabled it to fast track development while giving Ventnor a 20% free carried interest in the
toll treatment of Thaduna Green Dragon ore at Sandfire’s nearby DeGrussa operation.
The Thaduna Project is located 40km east of DeGrussa and represents the largest copper
resource in the Doolgunna-Bryah Basin Region outside of Sandfire’s DeGrussa-Doolgunna
Project.
Sandfire is the manager of the Joint Venture and currently owns a 35% interest in the project
with the right under the farm-in agreement to earn up to a further 45% (total of 80%).
During the September Quarter 2015, Sandfire completed an RC drill program at Thaduna,
reporting results including:
TDRC001:
TDRC004:
5m @ 3.2% Cu and 9.6g/t Ag from 251m down-hole
4m @ 1.5% Cu and 1.9g/t Ag from 193m down-hole.
The RC drill program comprised five holes drilled at a dip of 63o to an average depth of
approximately 240m down-hole. Holes had been planned and selected to target gaps in
previous drill coverage over the main orebody between known mineralised intercepts. These
five new holes also tested drill methods in order to maintain RC resource definition holes and
diamond pre-collars at the proposed trajectory, given that the Thaduna Copper Project is
susceptible to significant drill-hole deviation.
During the December 2015 Quarter, Sandfire plans to undertake a diamond drilling program
comprising six drill-holes aimed at Resource definition.
Black Dragon Gold Project
The Black Dragon Gold Project is located 370 kilometres northeast of Kalgoorlie and 22
kilometres northeast of nearby Tropicana Gold Mine, which is a JV with AngloGold Ashanti
(70%) and Independence Group (30%). The Tropicana Project has a Resource in excess of 7
million ounces of gold.
The Black Dragon prospect was initially sampled by AngloGold Ashanti with rock chip and soil
sampling. In a small area of outcrop of approximately 150 metres by 150 metres, 31 rock chip
samples returned better than 1g/t Au with a peak value of 573g/t Au. Shortly after the granting
of E39/1828, Ventnor Resources undertook a reconnaissance field trip to confirm the location of
the surface rock chip results reported by the previous operator and to undertake multi-element
assays.
The initial rock chip gold results were announced 28 April 2015, with the multi-element results
reported 28 May 2015. At that time, it was postulated that the high-grade mineralisation at
Black Dragon was potentially epithermal in origin due to the presence of significant silver,
tellurium and barium in the surface rock chips.
Ventnor raised $597,072 through a share placement in late June 2015, specifically to fund an
initial drilling program at Black Dragon which was scheduled to commence in late July or early
August, subject to upgrading the access roads around the Black Dragon site, and preparing the
pads for drilling.
The first drill program was designed to be shallow and close spaced to determine the near
surface strike, dip and plunge of the prospect, which can be erratic in a potential epithermal
gold system.
This initial drill program proposed to follow up earlier field work which had mapped and sampled
outcropping quartz veins and indicated very high-grade rock chip assays.
Assays on the rock chips resulted in high-grade results for gold, silver and tellurium.
These include:
BD016
BD100
BD101
BD102
BD103
64 g/t Au,
568 g/t Au,
213 g/t Au,
70 g/t Au,
626 g/t Au,
38 g/t Ag,
7 ppm Te
585 g/t Ag, 462 ppm Te
304 g/t Ag, 219 ppm Te
143 g/t Ag, 87 ppm Te
154 g/t Ag, 651 ppm Te
On 16 July 2015 Ventnor announced approval had been received from the Western Australian
Department of Mines and Petroleum for the proposed drilling campaign at the Black Dragon
Gold Project.
On 11 August Ventnor announced that drilling of approximately 2,000 metres of RC drilling to a
nominal depth of 60 metres had commenced at Black Dragon. The assay program had been
designed to test the potential for a new style of mineralisation in this exciting gold region.
Itincluded a campaign of multi-element assays and a review of the historic drilling and soil
sampling around Black Dragon and the surrounding district.
During the drilling program Ventnor announced on 3 September that visible gold had been observed
in drill samples at its Black Dragon Gold Project. A total of 33 RC drill holes were completed for 2,492
metres of drilling. The average vertical depth per hole was 50 metres.
During drilling, 15 RC samples were selected on the basis of observed geology and hand
portable XRF results. These samples were panned; visible gold and silver were noted in 12 of
the samples.
This announcement noted that discrete ore intercepts or any indication of true widths of gold
bearing lodes would be subject to final assays expected in September 2015.
The deposit is visually and structurally different to typical West Australian archean gold
deposits. On-site drill hole planning was flexible to deal with the expected variations in dip and
strike. The observed geology and preliminary multi-element assays from a hand-held XRF and
laboratory confirmatory assays from the RC drilling confim the Company’s belief that Black
Dragon is an epithermal-style deposit.
Ventnor was in a position to announce the first assay results from the initial drill program at its
Black Dragon Gold Project in Western Australia on 17 September 2015.
Sample assays from all holes received by 17 September 2015 indicated anomalous gold
results.
Significant results include:
BDRC1001
9m @ 7.08g/t Au, 3.88g/t Ag from surface
Inc 2m @ 24.74g/t Au, 14.14g/t Ag from 1m DH
BDRC1006
2m @ 4.47g/t Au, 0.70g/t Ag from 7m DH
BDRC1007
3m @ 3.14g/t Au, 1.17g/t Ag from 7m DH
Very encouraging results from the maiden drill program at Black Dragon confirmed the belief
that this is a constrained epithermal gold system that is quite distinct from Tropicana. The
deposit has a structural complexity typical of an epithermal system which will require a flexible
exploration approach to determine the geological controls on the higher grade zones.
As at the end of the period further results were pending, along with an extensive multi-element
assaying program.
The results received from the first eight holes are summarised below. Initial laboratory analysis
has been for gold and silver only. Results from multi-element analysis of selected intersections
are pending.
Hole Id
Easting Northing Az
BDRC1001 170677 6289446 330
BDRC1002
BDRC1003
BDRC1004
BDRC1005
BDRC1006
170682 6289437
170659 6289483
170686 6289432
170690 6289423
170665 6289430
330
330
330
330
330
Dip
-60
Incl.
Incl.
-60
-60
-60
-60
-60
Incl.
BDRC1007 170673 6289412 330
-60
BDRC1008 170696 6289457 330
-60
From
0
1
6
6
To
9
3
7
12
31
33
7
8
46
7
33
5
44
34
9
9
48
10
41
7
DH m Au ppm Ag ppm
9
7.08
3.88
2
24.74 14.15
1
10.87
5.60
6
1.15
0.24
NSA
13
0.26
0.10
1
0.51 NSA
2
4.47
0.70
1
8.71
1.30
2
5.57 NSA
3
3.14
1.17
8
0.51
0.19
2
2.98
0.50
The results above are encouraging in that generally they are higher grade than indicated by
historic reconnaissance drilling.
The geology as intersected down-hole is very complex with host lithologies and mineralisation
trends unclear. No estimate of true widths can be made at this early stage.
Generally, the lithology appears to be a package of volcanic sediments, including wackes and
shales, which have been altered and pervasively silicified. Weathering is very shallow, with the
base of oxidation being less than 10 metres below the surface. There appears to be an
inconsistent fabric or foliation to the host rocks with further evaluation to be undertaken
following receipt of all assays to ascertain the controls on mineralisation. Drilling was
undertaken in multiple directions based initially on mapping of the local outcrop, field
observations of drill samples, and identification of alteration. This is to be expected if Black
Dragon is in fact an epithermal system, as postulated. Additional drilling will be required to
follow up on the results from this initial drilling campaign and after optimum drill direction is
determined.
Following the multi- element analyses received to date, when considered in conjunction with the
geochronology of the Tropicana Deposit, suggests that previous exploration efforts may have
been testing for an inappropriate genesis for the mineralisation identified at Black Dragon. The
mineralisation at Tropicana, 22km to the southwest, has been aged at 2520 Ma (Doyle et al.),
whereas Black Dragon is part of the Paleoproterozoic Biranup Zone which is aged at ca. 1800
Ma (GSWA). The high-grade mineralisation encountered at Black Dragon therefore may be up
to 1 billion years younger than the mineralising event that formed Tropicana.
Warrawanda Nickel Project
During the quarter, plans were advanced to conduct a Fixed Loop EM Survey over the Tempest
target identified at the Warrawanda Nickel Project. It is anticipated that this field work will be
conducted in the next quarter.
Georgina Basin IOCG Project
During the quarter the Company’s tenement holdings were reviewed and prioritized against the
backdrop of the current climate for exploration projects. As a result of this process, it was
resolved to surrender the Queensland interests, which happened late in the quarter.
Corporate
None.
Events Subsequent to the Quarter
A Fixed Loop EM (FLEM) survey was conducted in the central area of Warrawanda which also
covered both a TEMPEST line and two of the RC holes drilled by Ventnor in 2012.
The survey was designed to examine the discrepancy between the previous SkyTEM and
TEMPEST surveys which indicated differences in postulated depths to conductors at
Warrawanda. The survey was conducted as a cheaper alternative to further drilling.
Results are pending.
Competent Person’s Statement
The information in this release that relates to Exploration Results is based on, and fairly represents,
information compiled by Mr David Reid who is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM). Mr Reid is a contractor to Ventnor Resources Limited. Mr Reid has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the “2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.” Mr
Reid consents to the inclusion in this report of the matters based on information provided by him and in
the form and context in which it appears.
For further information please contact:
Bruce Maluish, Managing Director
brucem@ventnorresources.com.au
Tel: +61 8 9226 3780
www.ventnorresources.com.au
Media: Warrick Hazeldine/Luke Forrestal
Cannings Purple
Tel: +61 8 6314 6300
whazeldine@canningspurple.com.au
Interests in Mining Tenements
WESTERN AUSTRALIA
Thaduna/Green Dragon Project - Copper
Tenement
Status
M52/1060
M52/1061
L52/149
L52/150
Granted
Granted
Granted
Granted
Interest at
beginning of
quarter
(%)
65
65
65
65
Interests sold to
JV partner
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
65
65
65
65
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
Interest at
beginning of
quarter
(%)
100
100
100
100
100
100
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
100
100
100
100
100
100
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
Interest at
beginning of
quarter
(%)
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
Black Dragon Project - Gold
Tenement
Status
E39/1828
Granted
Warrawanda Project - Nickel
Tenement
Status
E52/2372
P52/1242
P52/1243
P52/1244
P52/1281
P52/1282
P52/1283
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Nickel Hills Project - Nickel
Tenement
Status
E52/2550
Granted
Doolgunna Project - Copper
Tenement
Status
E52/2548
Granted
Share your feedback