Company Presentation - Amended
Released
Released
Announcement PDF
WA Silica Sand Project Developer
October 2019
Important Information
Disclaimer and Cautionary Statements
This document has been prepared by VRX Silica Limited (VRX). The information contained in this document is for information purposes only and has
been prepared for use in conjunction with a verbal presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an
investment decision. In preparing and providing this document, VRX has not considered the objectives, investment profile, financial position or needs of
any particular recipient. Mineral exploration is subject to significant risk. There is no guarantee of exploration success, and even if exploration success is
achieved, there is no guarantee that development of any mineral deposit will be economically viable. VRX strongly suggests that investors consult a
financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of VRX, its related bodies corporate, or their shareholders,
directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any liability arising
out of fault or negligence for any loss arising from the use of information contained in this document.
This document may include “forward-looking statements” within the meaning of securities laws of applicable jurisdictions. Forward looking statements
can generally be identified by the use of the words “anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”,
“could”, “may”, “target”, “plan”, “guideline”, “guidance” and other similar expressions. Indications of, and guidance on, revenue models, pricing,
earnings and financial position and performance are also forward-looking statements.
Such forward-looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and
other factors, many of which are beyond the control of VRX, its related bodies corporate, and their directors, officers, employees, contractors, agents
and advisors, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or
achievements may vary materially from any projections and forward looking statements and the assumptions on which those statements are based. In
particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time
prove to be false, inaccurate or incorrect. Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no
obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any
jurisdiction, and neither this presentation nor anything contained in it forms the basis of any contract or commitment. Without limiting the foregoing,
this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities of VRX have not
been, and will not be, registered under the U.S. Securities Act of 1933, as amended (Securities Act) or the securities laws of any state or other
jurisdiction of the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the
Securities Act and any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration
requirements of the Securities Act and any other applicable securities laws.
2
Important Information (cont.)
Disclaimer and Cautionary Statements (cont.)
Full details of the bankable feasibility studies for the Arrowsmith North, Arrowsmith Central and Muchea projects, including material assumptions
underpinning production targets and forecast financial information, are contained in VRX’s ASX announcements of 28 August 2019, 17 September 2019
and 18 October 2019, respectively. All such material assumptions continue to apply and have not materially changed. Whilst VRX considers all of the
material assumptions to be based on reasonable grounds, there is no certainty that they will be correct or that the range of outcomes indicated within
the studies will be achieved.
The probable ore reserves and inferred mineral resources for the Arrowsmith North, Arrowsmith Central and Muchea projects have been prepared by a
Competent Person and Competent Person’s Statements are set out below.
The production targets for the Arrowsmith Central and Muchea silica sand projects incorporate in each case the probable ore reserves that sit within the
proposed mining areas for the respective projects and a portion of the inferred mineral resources within each of those areas. Given the simple nature of
the silica sand deposits at both projects, VRX expects that additional drilling will be sufficient to upgrade the inferred mineral resources for both projects
and to realise the production targets. Notwithstanding this, there is a low level of geological confidence associated with inferred mineral resources and
there is no certainty that further exploration work will result in the determination of indicated mineral resources or that either or both of the production
targets at Arrowsmith Central or Muchea will be realised.
Competent Person’s Statements
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Exploration Results and Muchea Aircore Drilling Area
Mineral Resources are based on data collected and complied under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr Reid,
BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a Competent Person under the 2012 edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the
data in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Auger area Mineral Resources is based on information
compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction and supervision of Dr Andrew Scogings, who is an Associate
of CSA Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists.
He is a Registered Professional Geologist in Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian
Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the disclosure of information
in this report in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Probable Ore Reserves is based on data collected and
compiled under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr Reid, BSc (Geology), is a registered member of the
Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and the activity being undertaken to qualify as a Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and context in which it appears.
3
Investment Highlights
1
EMERGING AUSTRALIAN STRATEGIC SILICA SAND PRODUCER
2
OUTSTANDING PROJECT ECONOMICS AND LOGISTICS
Combined NPV10 of $727m
3
IDEALLY PLACED TO CAPITALISE ON ROBUST MARKET OUTLOOK AND
DEMAND
4
RAPID PATHWAY TO FINANCING AND PRODUCTION
4
The world is facing a global sand crisis
5
Silica Sand Use
Construction Sand
Concrete
Glassmaking
Float, Containers, Architectural, Thin Film
Metal Casting/Foundry
Automobile parts
Oil/Gas Well Stimulation
Frac sand/proppant
Metallurgical
Ferrous and Non-ferrous Alloys
Paint and Coatings
Brightness and durability
Chemical Production
Sodium silicate, Silicon gels
Ceramics and Refractories
High temp resistance
Filtration
Water production
Recreational
Inert growing media, Golf bunkers
Target Market
6
Market Outlook
Asian glass making production increasing 5-6% per year (~8 - 10Mtpa Growth)
Glassmaking silica sand demand by region*
Use
Spec
4%
5%
Market in
Asia
Growth in
Asia
Float (Plate) Glass
99.5% SiO2
60 - 65Mt
5% - 6%
Container Glass
99.5% SiO2
70 - 75Mt
5% - 6%
Cover Glass
(Solar Panels)
99.95% SiO2 & Low Fe
5 - 6Mt
+30%
Smart Glass
(Ultra Clear)
99.97% SiO2 & Low Fe
1 - 2Mt
5% - 6%
Specialist Glass
(Thin Screen)
99.97% SiO2
500 - 600kt
+10%
8%
47%
16%
VRX’s Target
Market
20%
Source: Stratum Resources
Asia Pacific
Western Europe
Africa/Middle East
North America
Eastern Europe
Central and South America
*Source: Freedonia estimate
7
VRX’s Silica Sand Strategy
Identify and delineate large scale silica sand resources
close to infrastructure
Explore opportunities for further processing to value-add
Develop plans for the mining and export of high quality
silica sand
8
Three Advanced WA Silica Sand Projects
Muchea (100%)
• Very high-grade product with outstanding financial
metrics
• Well located to key port and rail infrastructure
• Specialist glass products
• Potential +100 year mine life:
- JORC Resource of 208Mt @ 99.6% SiO2
- Probable Ore Reserve of 18.7Mt @ 99.9% SiO2
• BFS completed Oct 2019
Arrowsmith North (100%)
• High-grade with exceptional financial metrics
• Close proximity to port and rail infrastructure
• Glass making, foundry and ceramic markets
• Potential +100 year mine life:
- JORC Resource of 771Mt @ 98% SiO2
- Probable Ore Reserve of 223 Mt @ 99.7% SiO2
• BFS completed Aug 2019
Arrowsmith Central (100%)
• High grade with strong financial metrics
• Adjacent to rail infrastructure to port
• Container glass and foundry products
• Significant resource base:
- JORC Resource of 76.5 Mt @ 96.8% SiO2
- Probable Ore Reserve of 18.9 Mt @ 99.6% SiO2
• BFS completed September 2019
Geraldton
Port
Kwinana
Port
9
BFSs Demonstrate Exceptional Economics*
Arrowsmith North
Arrowsmith Central
$242.3m
$147.6m
$337.9m
$727.8m
Post Tax, ungeared IRR
79%
60%
96%
83%
Payback period (yrs) (post tax) (ramp up rate)
2.4
2.8
2.3
2.4
Post Tax, ungeared NPV10
Exchange Rate US$/A$
$0.70
Life of Mine (yrs) (BFS Study)
25
Muchea
Total
EBIT
$1.144bn
$737m
$1.540bn
$3.421bn
Total Sales (25 years) no escalation
$2.773bn
$2.167m
$3.345bn
$8.285bn
$835m
$539m
$1.123bn
$2.497bn
$28.260m
$25.88m
$32.8m
$87m
Cashflow after finance and tax
Capex (2 mtpa)
Capex contingency (inc)
Life of Mine C1 costs, FOB Geraldton (inc
Royalties)
Tonnes Processed (million tonnes) (BFS Study)
20%
Production Target (initial 25 years) (Mt)
Probable Ore Reserves (million tonnes)
Ore Reserve life (yrs)
JORC Resources (million tonnes)
99.7%
SiO2
$30.18
$27.67
$32.74
$30.24
53
51
54
158
47.7
39.6
48.3
136
19
18.7
242
10
77
9-10
208
1,056
204
102
771
99.6%
SiO2
* Full details of the bankable feasibility studies for the Arrowsmith North, Arrowsmith Central and Muchea projects, including material assumptions
underpinning production targets and forecast financial information, are contained in VRX’s ASX announcements of 28 August 2019, 17 September 2019
and 18 October 2019, respectively. All such material assumptions continue to apply and have not materially changed. Whilst VRX considers all of the
material assumptions to be based on reasonable grounds, there is no certainty that they will be correct or that the range of outcomes indicated within the
studies will be achieved.
10
Arrowsmith Projects
11
Proximity to Key Infrastructure
• Arrowsmith Projects located 100 km
Geraldton Port
south of Geraldton Port and 270km north
of Perth
• Rail connections to Geraldton Port
Rail to Geraldton
12
Arrowsmith North Overview
• Very large-scale potential:
‒ Probable Ore Reserve of 223 Mt @
99.7% SiO2
• Exceptional project economics
• BFS completed Aug 2019:
‒ Post Tax, ungeared NPV10 – $242m
‒ Post Tax, ungeared IRR – 79%
‒ Capex (2mtpa) – $28.3m
‒ BFS LoM – 25 years
• Substantial testwork confirms glass-making
quality (+99.7% SiO2)
• Low environmental impact mining
propositions
• Mining Lease applications lodged for
Arrowsmith North (1,730 Ha)
13
Arrowsmith North Upgrade
0.212mm – 1.0mm Screen
• Removes majority of
impurities
• Upgrades to +99.5% SiO2
product
• Delivers spec suitable for
float and container glass
market
14
Processing
Established processing techniques - No chemicals & no dust
15
Processing Plant Design
16
Arrowsmith North
Kwongan Low Heath
17
Muchea Project
18
Muchea – Strategic Location
• Located on UCL
• 50 km north of Perth
• 14 km north of Muchea
• Transport logistics in place:
Muchea
Silica Sand Project
• Adjacent to Brand Highway
• Significant rail capacity - under-utilised
with strong interest from operators
• Export through Kwinana Port
19
Muchea - Overview
• Muchea is potentially a world class high-grade silica
sand deposit
• Granted tenure 100% VRX
• Potential 100 year mine life:
• Probable Ore Reserves of 18.7Mt @ 99.9% SiO2
• JORC Resource of 208 Mt @ 99.6% SiO2
• BFS completed in Oct 2019 demonstrate exceptional
economics:
• Post Tax, ungeared NPV10 – $338m
• Post Tax, ungeared IRR – 96%
• Capex (2mtpa) – $32.8m
• BFS Study LoM – 25 years
• Mining Lease application lodged (3,000 Ha)
• NT Mining Agreement agreed terms
• Pre-referral discussion with EPA
20
20
Muchea – Product
Very high quality +99.9% SiO2 and <100ppm Fe2O3
Significant testwork indicates
simple processing can upgrade
sand to specialised glass quality
21
22
Silica Sand Development Timeline
ARROWSMITH
Approvals / Permitting
BFS
Commence
Construction
MUCHEA
Dec
2019
Production
Construction
June
2020
Arrowsmith
Production
Commences
Dec
2020
June
2021
Dec
2021
BFS
Commence
Construction
Approvals / Permitting
Muchea
Production
Commences
Construction
Production
23
Investment Highlights
EMERGING
AUSTRALIAN
STRATEGIC
SILICA SAND
PRODUCER
OUTSTANDING
PROJECT
ECONOMICS
AND LOGISTICS
RAPID PATHWAY
TO FINANCING
AND
PRODUCTION
IDEALLY PLACED
TO CAPITALISE
ON ROBUST
MARKET
OUTLOOK AND
DEMAND
24
Corporate & Capital Summary
Capital Structure
Directors
Shares On Issue
(m)
409
Paul Boyatzis
Non-Executive Chairman
Options on Issue1
(m)
77
Bruce Maluish
Managing Director
Share Price
cents
14.5
Peter Pawlowitsch
Cash (30 June)
A$m
1.5
Debt
A$m
Nil
Market Capitalisation
A$m
59
Non-Executive Director
1 Volume weighted exercise price 10.67 cents
Share Price (12 month)
25
Appendices
Arrowsmith North Resource
Resource
Classification
Indicated + Inferred
Domain
Million
Tonnes
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
White Sand
Yellow Sand
All Sand
313
458
771
98.7
97.6
98
0.54
1.08
0.86
0.15
0.40
0.3
0.18
0.17
0.17
0.24
0.52
0.41
Products
Classification
Product
Probable
Arrowsmith-N20
Arrowsmith-N40/NF500
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
99.7
99.7
0.2
0.2
0.05
0.05
0.035
0.035
0.1
0.1
* Details of Arrowsmith North Resource Estimate are contained in the ASX announcement of 9 July 2019
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly
available soil mapping information, above a basal surface wireframe defined based on the current drill sampling
depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp zones in the east
and south of the modelled area. Differences may occur due to rounding.
27
Arrowsmith Central Resource
Resource
Classification
Domain
Million
Tonnes
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Indicated + Inferred
All sand
76.5
96.8
1.5
0.4
0.2
0.7
Products
Classification
Product
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Probable
Arrowsmith-CF400
Arrowsmith-C20
Arrowsmith-C50
99.6
0.25
0.04
0.03
0.1
* Details of Arrowsmith Central Resource Estimate are contained in the ASX announcement of 15 August 2019
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly
available soil mapping information, above a basal surface wireframe defined based on the current drill sampling
depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp zones in the east
and south of the modelled area. Differences may occur due to rounding.
28
Muchea Resource
Resource
Classification
Domain
Million
Tonnes
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Indicated + Inferred
All sand
208
99.6
0.06
0.02
0.1
0.23
Products
Classification
Product
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Probable
Muchea-F80
Muchea-F80C
Muchea-F150
99.9
99.9
99.8
0.02
0.02
0.07
0.008
0.005
0.015
0.03
0.03
0.035
0.1
0.1
0.1
* Details of Muchea Resource Estimate are contained in the ASX announcement of 17 June 2019
*Note: Interpreted mineralisation is domained into different sand types based on drill logging data and publicly
available soil mapping information, above a basal surface wireframe defined based on the current drill sampling
depths. Depletion zones include the upper 0.5 m for rehabilitation purposes, and minor swamp zones in the east
and south of the modelled area. Differences may occur due to rounding.
29
Thank you
Bruce Maluish
Managing Director
Level 1, 6 Thelma Street
West Perth WA 6005
Phone: 08 9226 3780
Email: brucem@vrxsilica.com.au
30
Share your feedback
Discover