AGM Presentation
Released
Released
Announcement PDF
November 2026
The most advanced pure-play silica sand company on the ASX
Annual General
Meeting
Presentation
To be renamed Ortus Minerals Limited (ASX Reserved:ORT)
2
Important Information
Important Information
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a
verbal presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this
document, VRX has not considered the objectives, investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk. There is no guarantee of
exploration success, and even if exploration success is achieved, there is no guarantee that development of any mineral deposit will be economically viable VRX strongly suggests that investors
consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To
the maximum extent permitted by law, none of VRX, its related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts
any liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words
“anticipate“, believe”,“ expect”,“ project”,“ forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on,
revenue models, pricing, earnings and financial position and performance are also forward looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the
control of VRX, its related bodies corporate, and their directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied
in such statement. Actual results, performance or achievements may vary materially from any projections and forward looking statements and the assumptions on which those statements are based
In particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time prove to be false, inaccurate or incorrect
Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything
contained in it forms the basis of any contract or commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the
United States The securities of VRX have not been, and will not be, registered under the US Securities Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction
of the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the Securities Act and any other applicable securities laws or
pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws.
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral Resource and Ore Reserves for the Company’s silica sand projects is extracted from releases to ASX on
27 May 2026 (Arrowsmith North), 17 September 2019 (Arrowsmith Central), 9 May 2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and Boyatup (18 August 2022). The Company confirms that it
is not aware of any new information or data that materially affects the information included in this document and all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from
the original market announcements.
The Company confirms that all the material assumptions underpinning the production target, or the forecast financial information derived from the production target, in the 2026 Updated BFS dated 27
May 2026 continue to apply and have not materially changed.
3
Introducing VRX Silica | Setting the Scene
Introducing VRX Silica | Setting the Scene
• Silica sand is one of the most heavily used raw materials in the world
after air and water.
• VRX Silica Limited (VRX) has Australia’s largest silica sand Ore Reserve,
with the advanced Arrowsmith Project (Arrowsmith) hosting an Ore
Reserve of 221Mt at 99.5% SiO₂.
• The Muchea Project (Muchea) is one of the highest-grade silica sand
projects in Australia, with a Mineral Resource of 208Mt at 99.6% SiO2.
• Once all approvals are in place, Arrowsmith construction is expected to take
12 months, commencing in Q1 CY2027.
• Low capital intensity. ~A$74.5m of CapEx builds Arrowsmith’s 2Mtpa plant
for a 25-year LOM post-tax NPV8 of A$179m with +100 year mine life.
• Muchea is not as advanced in the approval process as Arrowsmith, but the
nature of its silica sand is such that the CapEx is expected to be ~A$32.8m,
capable of being largely funded out of Arrowsmith’s cashflow.
• +100 years of annuity-style cashflows from Arrowsmith and Muchea
create significant shareholder optionality. Growth versus dividends.
• Having largely worked its way through the regulatory process at Arrowsmith,
VRX is now building out an execution Team led by experienced mining
executive, Tony Swiericzuk, with a strong track record in delivering major
projects.
• VRX has a market capitalisation of A$30.5m and the support of its two
major shareholders in Sparta (~13.7%) and Nebari (~10.5%) who
understand the funding requirements to deliver Arrowsmith.
WESTERN
AUS TR A L I A
Geraldton
P O R T
Perth
Esperance
P O R T
1 Arrowsmith Projects
2 Muchea
3 Boyatup
Road haulage to port
0 100 km
4
1. Closing share price on ASX on 19 November 2026
2. Options comprising 111.2m VRXO quoted options (10c, 30-Jun-28), 68.4m unlisted options (various ex. prices and dates)
3. As at 30 September 2026 (excludes ~$2.55m Arramall debt funding)
4. As at 16 September 2026
ASX Ticker VRX
Share Price1 A$/sh $0.031
Shares Outstanding #m 984.3
Options Outstanding2 #m 179.6
Performance Rights #m 23.0
Market Capitalisation A$m $30.5
Cash Position3 A$m $4.4
Enterprise Value A$m $28.7
Monthly Rolling Liquidity A$m $0.3
Corporate Overview – VRX Silica (ASX:VRX)
CAPITAL SUMMARY SHARE REGISTER4
SHARE PRICE
13.7%
10.5%
6.1%
10.5%
59.3%
Sparta/Delphi
Nebari
Board & Management
Other Top 20 Shareholders
Other ~1,300 shareholders
A supportive, commodities focused share register, with a strong understanding of
the resources sectors and the Company’s long term growth strategy
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
$0.000
$0.020
$0.040
$0.060
$0.080
$0.100
$0.120
$0.140
$0.160
Nov-24 Feb-25 May-25 Aug-25 Nov-25 Feb-26 May-26 Aug-26 Nov-26
Volume (m)
Share Price (A$)
5
BOARD OF DIRECTORS
VRX Board and Management | Continuing to Evolve
Peter Pawlowitsch
Interim Chairman and Non-Executive Director
Senior executive: over 10 years’ experience in the
accounting profession and more recently business
management and the evaluation of businesses and mining
projects
Bruce Maluish
Non-Executive Director
Technical and finance: over 40 years’ experience in mining
industry including previous managing director and general
manager roles
David Welch
Non-Executive Director
Senior executive: responsible for strategy, business
transformation and performance, commercial negotiations
Tony Swiericzuk
Chief Executive Officer
Experienced mining executive with deep expertise across
exploration, project development and operations, with a
strong track record delivering major projects at Fortescue
Metals Group (Port Hedland and Christmas Creek) and for
Strike Energy (South Erregulla), supported by a long-
standing, high-performing execution team and strong
stakeholder engagement.
Mr Swiericzuk is highly incentivised to deliver for VRX, with remuneration
including performance rights vesting upon a suite of performance hurdles:
Weight of
Performance
Package
1. Positive FID for Arrowsmith North 13%
2. Payment received for first shipment from Arrowsmith North 13%
3.
Annualised run rate of 1 Mtpa production (measured over a 3-month
period) from Arrowsmith North
22%
4.
Annualised run rate of 2 Mtpa production (measured over a 3-month
period) from Arrowsmith North
26%
5. Next project (Muchea or other) fully approved to construct 26%
CHIEF EXECUTIVE OFFICER
PERFORMANCE EQUITY
6
Silica Sand | Investment in the Energy Transition
Silica Sand | Investment in the Energy Transition
Foundry
Castings
Solar Panel
Glass Insulation
Roof
Tiles
Window
Glass
Screen
Glass
Container
Glass
Paints &
Coatings
Building
Cladding
Automotive
Glass
Tyres &
Rubber
Concrete Ceramics
& Tiles
Glassware Micro- chips Pool
Filtration
• The current global demand for industrial silica sand is ~400Mtpa, anticipated
to grow ~4.5% CAGR1 with low volatility over the next decade.
• Growth in silica sand demand is being driven by the energy transition –
solar, premium glass, semiconductors – alongside established foundry,
ceramics and filtration markets.
• Asia-Pacific accounts for over 60%2 of the silica sand demand globally,
driven by industrialisation and urbanisation in China, India and Southeast
Asia.
• At the same time, supply is tightening as high-grade deposits become
increasingly scarce and new supply faces environmental, regulatory and
logistics hurdles.
• VRX holds 100% ownership of three silica sand projects in Western
Australia, with a combined Mineral Resource of ~1.4bn tonnes grading 99.5-
99.9% SiO₂.
• The Arrowsmith Project product suite will target markets that make up to
55.8% of the APAC demand supplying foundry and glass sand, with
960ktpa under binding offtake with buyers in China, South Korea, Taiwan
and the Philippines.
• Muchea introduces significant optionality to develop a range of value-added
products.
1. IMARC 2 February 2026
2. IMARC Asia Pacific Silica Sand Market (2025)
7
93%
7%
81%
15%
4%
Priority Project Overview
WESTERN
AUS TR A L I A
Geraldton
P O R T
Perth
Esperance
P O R T
1 Arrowsmith
2 Muchea
3 Boyatup
Road haulage to port
0 100 km
Arrowsmith Project
1
1
259 Mt
Ore Reserves
1,381 Mt
Mineral Resources
• High-grade project with compelling financials
• Strategically located close to port and Brand Highway
• The suite of Arrowsmith products will target the foundry and glass
markets
• +100 year mine life hosting an Ore Reserve of 221Mt @ 99.5% SiO2
• VRX has secured 960ktpa binding offtakes, with production commencing
at 1Mtpa for the first two years
• Production targeted for early CY28
Muchea Project
1
2
• Very high-grade, low-impurity project with superior financials
• Located 50km north of Perth
• The higher-grade products will supply the ultra clear and premium glass
markets, with these products priced at a premium
• The Muchea Project will complement Arrowsmith production with an
additional Resource of 208Mt @ 99.6% SiO2
• Muchea development will follow soon after Arrowsmith
Arrowsmith1
Muchea
Boyatup
1. Arrowsmith Reserves Combined - North / Brand / Central
8
PRODUCTION
• Arrowsmith to commence production
and ramp up to 2Mtpa plant
nameplate capacity
• Multi-generational potential of 100+
years
RESOURCES
• One of the largest silica sand
resources on the ASX
• Multi-asset portfolio to produce to
various product specs
• Strategic infrastructure advantage
Multi-Generational Operation with Consistent Economic Performance
PROFITABILITY
• Steady state Arrowsmith EBIT of
A$715m, with a payback of 4.6 years
• Muchea Project to follow with elevated
EBIT of A$1.54bn feeding into high-
grade markets
CASH FLOW
• Positive operating cashflow from
Arrowsmith only, with Muchea providing
upside
• Arrowsmith generates cashflow of
A$467m over the 25 years life of mine
COSTS
• Low CapEx of A$74.5m
• Arrowsmith C1 operating costs of
A$35.05/t
• Muchea C1 operating costs of
A$32.74/t
+100 years of annuity-style cashflows from Arrowsmith to support the development of the high-value Muchea Project and VRX’s broader Project suite
SALES
• Combined sales revenue of A$5.9bn
across the two projects
• Arrowsmith products will sell for
US$38-43/t
• Muchea products will sell at a premium
1. VRX Arrowsmith North 2026 Updated BFS (May 2026).
2. VRX Muchea 2019 BFS ( 18 October 2019).
9
-250
-200
-150
-100
-50
0
50
100
150
200
250
300
2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050 2051 2052
A$m
Revenue OPEX & Sustained Capital Royalties & Selling Costs Upfront CAPEX Principal Repayment Interest Tax Net Cash Flow
Strong Multi-Generational Future Cashflow
Arrowsmith and Muchea can deliver strong cashflow over the first 25 years of modelled life of mine, underpinned by a resource that supports a potential +100 year
mine life and sustainable returns for shareholders
Net cash flow = revenue less operating costs and sustaining capital, royalties and selling costs, upfront capital, debt principal and interest, and tax. Cash flows are presented in real terms.
Combined cash flow derived from the production targets and financial information in the Arrowsmith North 2026 BFS and the Muchea 2019 BFS.
Please refer to slide 27 for important details of material assumptions and risks relating to the forecast information in this slide.
~$71.3 million p.a. average cashflow, in real
terms over +20 years
Muchea: First
Production
10
Silica Sand Market
11
1. IMARC Group, Asia Pacific Silica Sand Market (2025)
VRX Strategically Positioned to Meet Growing APAC Demand
The engine of the global silica sand demand, regional demand is led by China and India
Arrowsmith
38.6%
China
22.4%
India
5.6%
Australia
11.8%
Malaysia
9.4%
S. Korea
8.2%
Japan
Share of APAC market (value, 2025): 30%+ 15–30% 8–15% <8%
>60%
of global silica sand
consumption is in Asia-Pacific¹
5.6% p.a.
forecast APAC market
growth, 2026-2034¹
Share of APAC market by value (2025)¹
China 38.6%
India 22.4%
Malaysia 11.8%
South Korea 9.4%
Japan 8.2%
Australia 5.6%
Others 4.0%
12
Strong Demand Growth in Arrowsmith’s Target Markets
The regional market is forecast to reach US$11.5bn by 2034, with glass and foundry making up over half the demand
Asia-Pacific Silica Sand Market (US$m)
2020-2025 historical, 2026-2034 forecast
5,312.7
6,968.2
7,356.7
9,139.6
11,522.5
2020 2021 2022 2023 2024 2025 2026E 2027E 2028E 2029E 2030E 2031E 2032E 2033E 2034E
Historical Forecast
5.7%
9.3%
12.4%
16.8%
21.6%
34.2%
Other
Abrasives
Filtration
Hydraulic fracturing
Foundry
Glass 55.8%
VRX target
Arrowsmith
North
markets
Arrowsmith produces foundry sand (AFS 20, 35, 55), with AFS 35
and 55 also saleable as glass sand²
Demand by end use, 2025
Share of Asia-Pacific market value
+ 6.2% p.a. | Glass Demand Growth: 2026 - 2034
1. IMARC Group, Asia Pacific Silica Sand Market Report 2026–2034 (2025 base year).
2. VRX Arrowsmith North 2026 Updated BFS (May 2026).
13
Premium Markets
Amid the rapid development of technology industries and the global energy shift, demand for ultra-high grade silica sand is growing
• Silica sand is one of the most heavily used raw materials in the world after air and water. Only a
small share of it is pure enough for high value glass and technology uses.
• Muchea’s high grade, low impurity resource is well positioned to supply premium priced markets,
where demand is expected to keep growing.
• Demand growth is being driven by semiconductors, AI hardware and advanced electronics,
positioning high-purity silica as a critical input into the global technology supply chain.
• Solar remains a major source of large-scale demand. Photovoltaic panels need low-iron, ultra-clear
glass, and that can only be made from silica sand of around 99.9% SiO₂ with very few impurities.
• Construction and urbanisation in Asia keep demand strong for premium flat glass, including ultra-
clear glass for high-rise buildings and architecture.
• Supply is getting tighter. Environmental limits on river and coastal dredging in several countries are
cutting the supply of quality sand. Glass grade sand can’t be replaced with construction-grade sand.
• High-grade deposits that sit near the surface and close to infrastructure are scarce. That gives a
strategic edge to large, clean deposits in stable places like Western Australia.
14
Arrowsmith Silica Sand Project
+ 100 years of production
15
Arrowsmith Overview
Well positioned to supply the growing foundry and glass markets in the Asia-Pacific region
1. State environmental approval and mining permit granted. Amendments sought to relocate processing plant/ infrastructure and use alternative offset site
at adjacent Arramall farm – expected to be approved Q4CY26
• VRX has been granted the state environmental and mining permits for Arrowsmith with final
amendments to the permits pending and expected to be granted Q4 CY261.
• The processing plant, infrastructure and access roads are being moved to outside the originally
designed Mine Development Envelope onto the adjacent farm to lower the environmental impact and
save upfront capital, requiring an amendment to the granted permit.
• Production is to ramp up to the plant’s 2Mtpa nameplate capacity.
• Ore Reserve of 221Mt @ 99.5% SiO2, supporting a 25-year life of mine with additional resource to
support a +100-year mining operation.
• Arrowsmith is strategically located to capitalise on the proximity to infrastructure such as:
• Established deep water bore with extraction approval;
• Access via Brand Highway to Geraldton Port (100km); and
• Hybrid gas and solar/battery option now available.
• The Project financing process is underway with Pareto Securities appointed for debt financing.
• Arrowsmith production and first trial shipments are targeted for early CY28.
16
Arrowsmith – BFS Economics1
Development of a world class silica sand project
1. Arrowsmith North 2026 Updated BFS, announced to ASX on 27 May 2026.
NPV8 (post-tax)
A$179m
IRR (post-tax)
31%
Payback
4.6 years
Target Production
2Mtpa
CAPEX
A$74.5m
Includes Contingency
and Arramall Farm
purchase
Total Sales
A$2.6bn
US$38-43 per dry metric
tonne, 25 years
Operating Costs
A$35.05/t
C1
costs, incl royalties
Commodity Prices
US$38-43/t
FOB (A$54-61/t)
RESOURCE 221Mt Ore Reserve @ 99.5% SiO2 supporting over 100 years of production – multi-generational project
• The BFS contemplates processing a total of 52Mt over a 25-year life of mine, representing ~24% of Arrowsmith’s 221Mt Ore Reserve and only ~4% of
VRX’s total Mineral Resource. The Ore Reserve alone supports +100 years of production.
• Given the magnitude of the Arrowsmith Ore Reserve, VRX sees the potential to significantly scale and bolt-on projects (beyond Muchea), providing
additional upside to the BFS economics.
17
Arrowsmith - Tried and Tested Processing Flowsheet
Simple processing flowsheet with minimal complexities
1 Open pit mining
2 Loader feeder
3 Trommel screening
4 Attritioning cells
5 Hydrofloat
6 Size screening
7 Product stockpiles
8 Road haulage (Brand Hwy)
9 Geraldton Port export
• A conventional washing and sizing circuit used in silica
sand operations worldwide, with no unproven processing
steps.
• A$74.5m CapEx inclusive of the 2Mtpa plant.
• Washing, floating and sizing only, no requirement for toxic
reagents.
• Producing four products: AFS 20, AFS 35, AFS 55 and
Local; AFS 35 and 55 can also be sold as glass sand.
• Products to be hauled to Geraldton Port for export via the
Brand Highway (100km).
18
A Simple, Low-Impact Approach to Silica Mining
From pit to rehabilitation
No tailings dam, no blasting, no toxic reagents: a material point of difference from most hard-rock mining operations
1
Clear
30-40 m vegetation strip stripped
and moved directly to rehab
2
Mine
Free-dig loader at a 5-15 m face:
no drilling or blasting
3
Screen
Mobile trommel separates sand
physically
4
Process
Plant washes and grades sand
using bore water
5
Rehabilitate
VDT re-establishes vegetation as
mining advances
Silica sand resource
Deep groundwater source
5
Progressive rehabilitation
Landform re-vegetated behind mining
Water bore
5C licence to
draw from the aquifer
Product
4
Processing plant
Freehold land
Screened sand to plant
3
2
5-15 m
mining height
1
30-40 m strip
cleared just ahead of the face
Native vegetation
Undisturbed ahead of mining
MINING ADVANCES
Vegetation Direct Transfer (VDT) to rehab
• Unlike hard rock silica operations, Arrowsmith doesn’t require drilling, blasting or toxic reagents. The sand is dug, washed and trucked, keeping the
operation simple, low-cost and low-risk.
1. VRX Annual Report to shareholders (24/09/2026)
19
1. VRX ASX announcement, 20 Jan 2025.
2. VRX ASX announcement, Oct 2025.
3. VRX ASX announcement, Dec 2025.
4. VRX Arrowsmith North 2026 Updated BFS, 27 May 2026.
Silica Sand Offtakes
Six conditional binding contracts with established foundry and glass supplier across four Asian markets
Path to bankable offtake
JAN 2025
Non-binding term sheets
Offtake interest grows to 640ktpa from buyers in Korea, Japan
and Taiwan1
OCT 2025
4 binding contracts 410ktpa
Foundry, glass and filter media suppliers in South Korea,
Taiwan and the Philippines²
DEC 2025
2 binding contracts 550ktpa
Foundry and glass suppliers in China3
MAY 2026
Updated BFS
960ktpa binding offtake underpins the project financial model³
VRX Silica has executed six binding offtake contracts for 960ktpa across four countries, for
~50% of production at Arrowsmith.
• South Korea, Taiwan and the Philippines (Oct 2025): four contracts signed for 410ktpa.
• South Korea: two suppliers for the automobile foundry industry.
• Taiwan: supplier of foundry sand, glass sand, water filter media and sized dry sand.
• Philippines: supplier to glass manufacturers.
The October contracts run for four years each, with fixed prices for the first two years in line
with the BFS assumptions.
• China (Dec 2025): two contracts signed for 550ktpa. The buyers supply the foundry and
glassmaking industries.
Contractual Terms
• Conditions: subject to financing, final permitting, port access and an initial trial
shipment.
• Payment: irrevocable letter of credit from an accredited bank.
• Pricing: BFS assumes US$38-43/t FOB depending on product.
• Product: predominantly foundry sand.
• Logistics: road haulage to Geraldton Port for export
20
Arrowsmith – the Largest Ore Reserve Among its ASX Listed Australian Peers
221 Mt at 99.5% SiO₂ - larger than any other ASX listed Australian silica sand development project
1: VRX Silica Arrowsmith North 2026 BFS; Diatreme Resources (DRX) 15/10/2026 PFS Confirms NSP potential as new FNQ silica sand mine ; Perpetual Resources (PEC) 17/03/2021
Maiden Ore Reserve and Outstanding Beharra PFS Result Update
64Mt
151Mt
221Mt
1.5Mtpa
3.0Mtpa
(5.0Mtpa
Ph2)
2.0Mtpa
Arrowsmith North
(VRX)
99.5% SiO₂
Northern Silica
(Diatreme)
99.25% SiO₂
Beharra
(Perpetual)
98.6% SiO₂
ASX Listed Australian Silica Sand Peers1
← Ore reserve (Mt) Plant capacity (Mtpa) →
Product Use
Proved
(Mt)
Probable
(Mt)
Total
(Mt)
SiO₂
(%)
Fe₂O₃
(%)
AFS 20 Foundry 0.8 24.2 25.0 99.5 0.07
AFS 35 Foundry / glass 3.9 102.5 106.4 99.5 0.06
AFS 55 Foundry 2.7 51.1 53.8 99.2 0.10
Local Local market 1.8 34.1 35.9 – –
Total 9.2 212 221
Arrowsmith Ore Reserve (JORC 2012)
Arrowsmith Project Milestones
Jan 2025 Positive WA EPA recommendation
Aug–Sep 2025 Environmental, works and mining proposal approvals received
Oct–Dec 2025 Six binding offtake contracts signed (960ktpa)
May 2026 Updated BFS released
Next Final investment decision; first production targeted early CY28
• Arrowsmith is the largest Ore Reserve among its ASX listed silica sand
Australian peers (221 Mt, 1.5x Northern Silica) with 960 ktpa under binding
offtake, leaving FID as the last step before first production in early CY28.
• Cape Flattery is Australia’s largest silica sand mine, wholly owned by unlisted
Mitsubishi Corporation.
21
Arrowsmith is on track for First Shipments in early CY28
Indicative Project development timeline
Q4 Q1 Q1
Q2 Q3 Q4
2026 2027 2028
Q4 CY26
Approval amendments
finalised
Q4 CY26
Site establishment & early
works
Q1 CY27
Process plant
construction starts
Q3 CY27
Mining operations
commence (pre-strip)
Q4 CY26
Project financing
finalised
Q4 CY27
Plant commissioning
Q1 CY28
First trial shipments to
offtake customers
Today
Q4 CY26
Muchea BFS update
commences
Q1 CY27
Muchea BFS update complete;
permitting & approvals
commence
Arrowsmith Muchea
22
Muchea Silica Sand Project
23
Muchea Overview
Large scale, world class, very high-grade, low impurity silica sand project
• Muchea is located ~50km north of Perth, within close proximity to key established
infrastructure including transport, power and port.
• Muchea is one of Australia’s largest high grade silica sand resources, combining rare
scale and purity, and is well placed to supply Asia-Pacific’s energy transition.
• Muchea sits on granted Mining Leases and Miscellaneous Licences, with lessons from
Arrowsmith expected to streamline the permitting process, environmental studies, mining
method and plant design.
• VRX has conducted significant testwork demonstrating recoveries of +99.9% SiO2 -
<100ppm Fe2O3 producing a very high-grade, low impurity product.
• The high-grade silica sand will be used in the premium ultra-clear glass markets,
which attract a significant price premium to other silica sand markets.
• Development of Muchea is expected to be funded from cash generated by the
Arrowsmith operation.
1. Muchea 2019BFS, announced to ASX on 18 October 2019
24
Muchea - BFS Economics1
Higher value product, higher margin than Arrowsmith
1. Muchea 2019BFS, announced to ASX on 18 October 2019
NPV10 (post-tax)
A$338m
IRR (post-tax)
96%
Payback
2.3 years
Target Production
2Mtpa
CAPEX
A$32.8m
Total Sales
A$3.3bn
US$55-60 per dry metric tonne, 25 years
Operating Costs
A$32.74/t C1
costs, incl royalties
JORC Indicated and Inferred Resource 208Mt @ 99.6% SiO2 supporting over 100 years of production – multi-generational project
• The pre-production funding requirements for Muchea are expected to be funded from cashflow generated by Arrowsmith.
25
Investment Thesis
Investment Thesis
Every semi-conductor chip begins with high purity silica sand, positioning premium silica assets at the foundation of the digital economy
• The VRX suite of silica sand projects in Western Australia have the potential to be multi-
generational projects with +100 years mine life, due to the significant scalability and bolt-on
project potential, providing additional upside to the BFS economics.
• With a low capex of A$74.5m, partly funded by ~A$40m of debt, Arrowsmith is set to deliver
attractive long-term cashflows. Coupled with Muchea the two projects deliver a combined
total sales of A$5.9bn each over 25 years of production.
• The low capital intensity of the projects, combined with simple, proven processing and
established infrastructure, keeps the execution risk low.
• A short 12-month construction period puts Arrowsmith on track for first shipment in Q1
CY2028.
• VRX has signed binding offtake agreements for a combined 960ktpa with suppliers in
South Korea, Taiwan, the Philippines and China.
• The regulatory and environmental processes VRX experienced with Arrowsmith will
streamline the development process of Muchea.
• VRX’s production emerges at a pivotal time, as the global demand for high-purity silica sand
increases, while supply in South-East Asia tightens due to depleted deposits, strict export
regulations and export tariffs.
• With a market capitalisation of A$30.5m and two capable major shareholders in Sparta
(~13.7%) and Nebari (~10.5%), VRX has alignment on the funding pathway for Arrowsmith.
Tony Swiericzuk
Chief Executive Officer
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Phone: 08 9226 3780
Email: info@vrxsilica.com.au
27
Cashflow Assumptions Table
Real A$ unless stated. Arrowsmith North (2026 BFS Update); Muchea (2019 BFS).
Assumption Units Arrowsmith North Muchea Combined
Project
Study basis 2026 BFS Update 2019 BFS AN 2026 + Muchea 2019
First production year year 2028 2031 2028
Mine life modelled years 25 25 -
Production
Plant feed at full rate Mtpa 2.20 2.24 4.44
Product yield % 83.0% 89.4% -
Product sold at full rate Mtpa 1.83 2.00 3.83
Ramp-up period years 2 2 -
Price and costs
Average realised price US$/t, real 43.00 48.48 -
Exchange rate US$ per A$ 0.70 0.70 -
Average realised price A$/t, real 61.43 69.26 -
Operating cost A$/t processed 33.69 31.05 -
C1 cost (inc. royalties) A$/t processed 35.06 32.72 -
Capital and funding
Upfront capital A$m, real 74.5 32.8 107.4
Sustaining capital (incl. OPEX) % of capex p.a. 1.0% 0.0% -
Debt drawn A$m 40.0 - 40.0
Interest rate % 15.0% N/A -
Debt repayment term years 4 N/A -
Company tax rate % 30.0% 27.0% -
Deferred Tax Asset A$m Shared Shared 17.1
Life-of-mine cash flow
Revenue A$m, real 2,692.0 3,324.1 6,016.2
Net cash flow A$m, real 459.8 1,127.3 1,587.1
28
Silica Sand Resources and Reserves
Share your feedback
Discover