ASX ANNOUNCEMENT
June 2022 Quarterly Activity Report
The following is a summary of the activities conducted by VRX
Silica Limited (VRX or Company) during the June 2022 quarter
at its silica sand projects at Arrowsmith North, Arrowsmith Central
(located 270 km north of Perth), Muchea (located 50 km from
Perth) and Boyatup (located 100 km east of Esperance), all
situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand
exploration company with four high-value, advanced, very longterm silica sand projects in Western Australia, a Tier 1 mining
region.
The Company has multi-decade scale contiguous sand deposits
on granted Mining Leases with secure tenure and a combined
+1bn tonne Mineral Resource of 99.6% to 99.9% SiO2 grade silica
sand.
The Company and its management team is WA based as are its
four large scale, high-grade and low impurity silica sand projects.
Each project can be run independently and supply high-grade
silica sand to many diverse markets.
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and
water. It is the main ingredient in all types of glassmaking,
including specialty solar panel and high-tech glass. The glass
manufacturing industry demand is increasing at a rate of 5-6%
per year, or about 8-10 million tonnes pa. Around 47% of the
world’s glass is made in Asia.
Silica sand is an essential component of the foundry and casting
industries. The largest foundry industry is in Korea where it
dominates the industry particularly for large marine components.
ASX: VRX
Capital Structure
Shares on Issue:
558.4 million
Unlisted Options:
35.3 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
Silica sand is also the main ingredient in concrete.
Silica sand is a finite resource that is rapidly being exhausted and
the Asia-Pacific region is currently experiencing increasing
demand at a time of a global supply shortfall.
The Company is actively
assessing other silica
sand projects in
Australia.
A Project development pipeline to ensure a disciplined, staged development of
world-class assets
The Arrowsmith North Silica Sand Project (Arrowsmith North) will lead a staggered and
disciplined development program, followed by the Muchea Silica Sand Project (Muchea) and
Arrowsmith Central Silica Sand Project (Arrowsmith Central).
VRX has the most-developed ASX listed company silica sand projects in Australia with
planning, Aboriginal heritage and environmental studies well advanced having commenced in
2017.
Mining Leases are granted over these three projects as well as various Miscellaneous
Licences for access with permitting and infrastructure preparations well-advanced.
The scale of the projects provides for a long-term opportunity for silica sand export and
potential for glass manufacturing and downstream industries in Western Australia.
Arrowsmith North
The mining and processing operation is relatively simple and low impact with long-term
production expected to commence initially at Arrowsmith North on the 223Mt Ore Reserve @
99.7% SiO2 in 2022, subject to final environmental approvals.
A revised capital estimate is currently underway on a tailored 2Mtpa processing plant with a
unique patented process circuit.
Process circuit design and detailed engineering has been designed following an extensive
metallurgical testing regime. The results of a bulk testwork program undertaken during the
March and June 2022 quarters are still pending due to laboratory delays. The bulk program
has produced sufficient final product samples to be sent to an extensive list of potential buyers
once confirmation assays and Particle Size Distribution (PSD) evaluation have been
completed.
Potential buyers require significant sized (50-60kg) samples for both glassmaking furnace
testing and testing for the foundry industry Resin Coated Sand (RCS).
Arrowsmith North Approvals
During the quarter the Company lodged the Environmantal Review Document (ERD) with the
Environmental Protection Authority of Western Australia (EPA) for Arrowsmith North.
The ERD document is required under the EPA’s public environmental review process and will
be released for public review following the review by the EPA. The ERD was prepared
according to the procedures in the EPA’s Environmental Impact Assessment (EIA; Part IV
Divisions 1 And 2) Procedures Manual (EPA, 2021b).
The ERD is a comprehensive summary of the project environmental setting, the physical
elements of the mine and infrastructure, operational elements, the extent of effects on the
environment and the proposed rehabilitation and closure plan.
The Company received a request from the EPA for further information on 4 July 2022 and the
response was submitted on 12 July 2022. The Company awaits EPA confirmation that the
document will been released for public review.
The indicative timetable for the development of Arrowsmith North sees final EPA approval in
December 2022, with the six-month construction phase scheduled to commence in January
2023.
An important feature of the proposed rehabilitation is the use of the unique Vegetation Direct
Transfer (VDT) method which is estimated to result in the best restoration of the mine area
vegetation and habitat.
The VDT methodology can be viewed at:
https://vrxsilica.com.au/miningandrehabilitationmethodology/
Key Plant Equipment for Arrowsmith North
During May 2022 VRX, announced the start of project capital expenditure for its Arrowsmith
North processing plant, with the purchase of two major items of sand processing capital
equipment.
With the support of specialist engineering consultancy ProjX, VRX purchased locally a 3m
diameter x 8m long RCR-designed feed trommel and a 3.6 x 8.5m Schenck “banana” vibrating
screen.
Figure 1: Feed trommel
The trommel was previously part of a mineral sands operation and is now at Hotweld
Engineering, a Bunbury based mechanical & fabrication workshop for a refurbishment
evaluation and quote. The screen was previously in use at a lithium processing plant and has
been relocated to RCR, a Bunbury based mechanical equipment workshop where it has been
refurbished.
The acquisition of these two key pieces of plant equipment for Arrowsmith North is a significant
saving in both lead time and capital. The Company’s strategy to purchase and refurbish highquality second- hand major plant equipment has both pre-empted any lead time issues
associated with ongoing global supply chain disruption and delivered more than $1 million in
capital savings to-date.
VRX will continue to pursue other lead time and cost-saving opportunities to capitalise on its
first-mover advantage in Western Australia’s emerging silica sand sector, at a time when there
is fast-rising global demand for high-quality, responsibly sourced silica sand volumes.
The trommel is a key piece of process equipment, comprising a rotating screening barrel
mounted over a large sump on a structural steel-base frame. Mined sand passes through the
screen panels and is pumped to the processing plant. The trommel is in excellent condition
structurally and an ideal fit-for-purpose item of major process equipment for the project.
Figure 2: The trommel barrel is loaded for transport
The screen had undergone strip, non-destructive testing and assessment by the OEM
(Original Equipment Manufacturer) and refurbishment is completed.
Figure 3: Schenck screen being refurbished at RCR
Arrowsmith Central
During the June quarter the Company announced that its Arrowsmith Central Silica Sand
Project (Arrowsmith Central) has moved to the next stage of the environmental approval
process with the EPA.
Consistent with the EPA’s approach at Arrowsmith North and the Company’s expectations for
Arrowsmith Central, the EPA will assess the proposal at a Public Environmental Review (PER)
level of assessment as required under section 40(2)(b) of the Environmental Protection Act
1986. The PER period is four weeks.
The Company lodged on 20 June 2022 an Environmental Scoping Document (ESD) which
details the environmental studies that are required to inform the assessment of the project.
These include:
•
Flora and Fauna Studies
•
Dieback Assessment
•
Surface water and Hydrology Studies
•
Cultural and Heritage Assessment
•
Greenhouse Gas estimate
•
High Level Air Quality Assessment
Lodgement of the ESD is a fundamental step in the EPA administration procedures to inform
the Environmental Impact Assessment of Arrowsmith Central. The Company is confident the
project has addressed the Environmental Principles, Factors and Objectives of the guidelines
for assessment.
Other government agencies will be restricted from approving any approvals related to the full
development of the project until the EPA process is complete (noting exploration and
investigations are not restricted). This does not impact upon the Company’s current
development plans.
This is another significant step in the development of the Company’s second silica sand project
at Arrowsmith Central and the Company will progress the application as expeditiously as
possible.
Whereas the Company is not in a position at this stage to set a definitive timeline for the
approval process, it is expected that work-to-date with the EPA on seeking approval for
nearby and broadly similar Arrowsmith North will greatly assist in this application.
Figure 4: Arrowsmith Central Location
Figure 5: Arrowsmith Central Vegetation
The Arrowsmith Central mining development area has been selected to avoid environmentally
sensitive areas, in particular, so that no large trees suitable for Carnaby Cockatoo roosting or
nesting are impacted.
At the VRX selected mine areas, similar to the Arrowsmith North project, the root structures in
the loose sand are relatively shallow at 200-300mm in depth and ideally suited for the VDT
system. The method has been developed to provide the best rehabilitation outcome for the
dominant and recalcitrant sedges and grass species.
Muchea
Development of Muchea will follow development at Arrowsmith North.
Muchea will have access to established infrastructure such as grid power, is adjacent to the
Brand Highway and the underutilised railway which connects to the Kwinana Port (approx.
100km).
Gas pipelines run adjacent to Muchea and water will be accessed from the Yaragadee deep
aquifer.
The Company has had many offtake enquiries for Muchea silica sand from Asian markets and
believes that the consistent production of such high-grade silica sand with a low iron content
will be in high demand as raw material for the manufacture of predominately premium ultraclear glass production, particularly for the burgeoning solar panel manufacturing industry. VRX
continues to receive these enquiries on a regular basis.
In July 2021, VRX commissioned Mattiske consulting to undertake a detailed springtime flora
and vegetation study on a selected priority area of 350Ha. This is in addition to a 2017 desktop
survey and an extensive field survey in spring 2018.
In combination with previous detailed fauna survey reports VRX was able to select this priority
area to mine that will have the least impact to the environment and habitats and include
significant resources. No priority species have been recorded within this selected area.
The Company has lodged a Program of Work (POW) with the Department of Mines, Industry
Regulation and Safety (DMIRS) within this priority area to conduct further detailed drilling and
sampling. A supporting Native vegetation Clearing Permit (NVCP) application has also been
lodged.
Boyatup
VRX conducted a 206 hole, 312m, 400m x 800m spaced air core drill program at its Boyatup
Silica Sand Project (Boyatup), located approximately 100km east of Esperance, Western
Australia.
Results of early work undertaken by VRX and the previous tenement holder indicated in-situ
sand grades up to 99.7% SiO2 with potential to produce a very low Fe2O3 product.
Drilling took 9 days with final assay results received in late June 2022. This data is being
assessed to enable a maiden mineral resource to be estimated. Drilling has also produced
bulk material for metallurgical testwork to determine the product quality that the project can
produce.
The drilling was undertaken pursuant to a POW approved by DMIRS.
A heritage (site avoidance) survey undertaken by the Esperance Tjaltjraak Native Title
Aboriginal Corporation (ETNTAC) cleared the area for the drill program.
An Environmental desktop study over the project area has been completed utilising databases
from the Department of Biodiversity Conservation and Attractions (DBCA) to review regional
data on:
1. Priority flora
2. Priority ecological communities
3. Threatened ecological communities; and
4. Significant fauna.
The desktop study is over an extensive area including the drill targets and surrounding
vegetation and habitats. This study will enable future planning of environmental studies to
support an application for environmental and mining applications.
Geothermal Energy Resources
On 21 January 2022, DMIRS released 21 areas in Western Australia for applications for
Geothermal Exploration Permits with a closing date for applications being 21 April 2022.
Within the nominated time frame, VRX made a number of applications for permits proximal to
the Company’s current Arrowsmith North and Arrowsmith Central silica sand holdings.
The applications were made as part of VRX Silica’s overall green energy intentions as
demonstrated by the hydrogen gas MOU signed with XODUS Energy Pty Ltd and embodied
in the Company’s ESG statement.
The process is a competitive bid and the Company expects there will be significant interest.
There is no guarantee of a successful application. DMIRS has not indicated as to when the
bidding process will be finalised.
Environmental, Social and Governance – ESG
VRX continues to deliver on its ESG responsibilities aligned to the UN’s Sustainable
Development Goals and published its maiden report in the 2021 Annual Report. During the
quarter work was undertaken to update this report for inclusion in the 2022 Annual Report.
Metallurgical Testwork R&D
During April 2022, VRX lodged a registration for an R&D Tax Incentive Application with
AusIndustry for the year ending June 2021.
The claim is for costs incurred for the R&D work undertaken by VRX and its consultants in the
core development of a new process route for high grade silica sand which includes the
recovery and testing of metallurgical composite samples, preparation and analytical testwork
to determine a process circuit design and subsequent engineering.
The Company paid fees during the quarter and received $167,229 in July 2022 after fees for
the year ending June 2021. An additional claim will be made for the year ending June 2022.
WA Investment Attraction Fund
In July 2019 the Western Australian State Government released Diversity WA to provide an
economic development framework for the state. It sets out initiatives, actions and strategies
that will contribute to achieving its vision for “a strong and diversified economy delivering
secure, quality jobs through increased investment across abroad range of industries”. It also
identifies priority sectors for strategic development that match Western Australia’s unique
strengths with global trends to achieve growth across the economy.
As part of the initiative, successful applicants will be eligible for financial assistance in the form
of grants and other incentives, subject to a Financial Assistance Agreement (FAA) from the
Investment Attraction Fund.
VRX has made an application under Stage 1, Expressions of Interest of the scheme and if
successful will be invited to progress to Stage 2 and make a detailed application.
Corporate
There was no material corporate activity during the quarter.
ASX Listing Rule 5.3 disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $71K related mainly to
tenement rents and geothermal acreage exploration permit bids.
Payments for exploration & evaluation under investing activities of $569K consists mainly of
processing plant engineering design and related metallurgical test work, environmental
surveys and approvals and heritage survey costs.
Details of tenement activities:
During the quarter, the following tenements were granted:
None
During the quarter, the following tenements were applied for:
None
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $133K
represents directors’ fees and salaries paid during the quarter.
Competent Person
The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Arrowsmith North, Arrowsmith Central and Muchea Silica
Sand Projects, and Boyatup Drilling is extracted from releases to ASX on 28 August 2019, 17
September 2019, 18 October 2019 and 24 March 2022, respectively. The Company confirms
that it is not aware of any new information or data that materially affects the information
included in this document and all material assumptions and technical parameters underpinning
the estimates continue to apply and have not materially changed.
This report has been authorised for release to ASX by the Board of Directors.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M/1389
M/1392
L70/198
L70/199
L70/202
L70/203
L70/208
L70/230
L70/229
G70/264
G70/265
G70/266
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Application
Application
Application
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M70/1390
M70/1414
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Application
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Projects Locations
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 June 2022
Year to date
(12 months)
$A’000
Current quarter
$A’000
-
-
(71)
(291)
(b) development
-
-
(c) production
-
-
(d) staff costs
(225)
(800)
(e) administration and corporate costs
(442)
(1,590)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
15
1.5
Interest and other costs of finance paid (on
lease liability)
(3)
(10)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(738)
(2,676)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(61)
(391)
(d) exploration & evaluation
(569)
(2,440)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(12 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(630)
(2,831)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
4,438
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(17)
(67)
3.10
Net cash from / (used in) financing
activities
(17)
4,371
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
10,691
10,442
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(738)
(2,676)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(630)
(2,831)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(17)
4,371
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(12 months)
$A’000
Current quarter
$A’000
-
-
9,306
9,306
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
4,289
5,677
5.2
Call deposits
5,017
5,014
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
9,306
10,691
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
133
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(738)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(569)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,307)
8.4
Cash and cash equivalents at quarter end (item 4.6)
9,306
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
9,306
7
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Not applicable
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Not applicable
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Not applicable
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
28 JULY 2022
...................................................................................
THE BOARD
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standa