Arrowsmith North Mineral Resource and Ore Reserve Update
Released
Released
Announcement PDF
11 November 2022
ASX ANNOUNCEMENT
Arrowsmith North
Mineral Resource and Ore Reserve Update
Highlights:
Maiden Proved Ore Reserve of 9.2Mt and updated total
Ore Reserve of 221Mt
ASX: VRX
Capital Structure
Updated Mineral Resource of 768Mt @ 98.0% SiO2,
includes a Measured Resource of 10Mt @ 95.9% SiO2
Shares on Issue:
558.4 million
Unlisted Options:
35.3 million
Pilot plant testwork confirms product specifications
for marketing and offtakes
Corporate Directory
VRX Silica Limited (ASX: VRX) (VRX or Company) is pleased to
announce an update to the Mineral Resource Estimate (MRE) and
Ore Reserve Statement (ORS) for its Arrowsmith North Silica Sand
Project, located 270km north of Perth.
The MRE update is based on an additional 130 close spaced grade
control holes1. These holes were drilled as a pre-production activity
to increase the resource confidence in the initial years of mining, and
to produce a bulk sample for pilot scale metallurgical testwork and
the generation of bulk samples for potential offtake partners.
The pilot plant testwork of a 3.3 tonne bulk metallurgical composite
is complete. In combination with market analysis a suite of 5 saleable
products have been determined that will be produced from
Arrowsmith North. Process and Engineering design of the proposed
Process Plant has been guided by the chemical and physical
specifications of these products. The declaration of these five
products is used to define the saleable Ore Reserve declared in this
Statement.
VRX Silica Managing Director Bruce Maluish said: “This updated
Mineral Resource and Reserve is a culmination of significant
metallurgical testwork and evaluation of the Resource to determine
the premium products we can produce.
“These products include sought after foundry sand as well as
glassmaking sand suitable for flat glass, including automobile glass
and also container glass.
“We have despatched large samples to a number of foundry and
glassmaking companies in Korea, Japan and Taiwan for evaluation
and subsequent discussions for offtake.”
1 ASX announcement of 11 March 2021, “Arrowsmith North Grade Control Drilling”.
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica sand
projects in Australia.
The creation of this proved ore reserve has led to a high confidence schedule of the final products
that will be available for sale for the initial 6 years of mining. This will allow for a proactive marketing
effort to return the best economic outcomes from the project. Future grade control programs and ore
reserve updates will occur within 5 years of the commencement of mining.
VRX Silica Interactive Investor Hub
Engage with us directly by asking questions, watching video summaries, and seeing what other
shareholders have to say about this and past announcements at our Investor Hub, at:
https://vrx.freshamplify.com/.
Detailed Information
In March 2021 VRX completed the pre-production activity by conducting a close spaced grade
control drilling program of 130 AC holes with the aim of improving the resource confidence for the
initial years of mining, and to produce a bulk metallurgical composite that represents the material
that will be processed in these initial years and to process this material through a pilot plant that
mimics the current designed process flow to generate bulk samples for potential offtake partners.
VRX engaged CSA Global to update the Arrowsmith North MRE with the expectation that the new
estimate would not be materially different from the published estimate2, as the CSA update was
confined to the new data generated by the grade control drilling, see Figure 1, which shows the area
(shown in green) that was included in the updated MRE.
Figure 1 – CSA MRE Update – Green area updated
2 ASX announcement of 9 July 2019, “Arrowsmith North Mineral Resource Estimate Upgrade”.
2
The updated MRE resulted in a category upgrade to the material in the area grade controlled to a
measured resource. A summary of the updated MRE is shown in Table 1, and the JORC 2012
Table 1 is included in Appendix 2.
Arrowsmith North - Mineral Resources
9 July 2019 Estimate
SiO₂ Al₂O₃ Fe₂O₃ TiO₂
Classification Mt
%
%
%
%
Measured
Indicated
248 97.7
1.0
0.4
0.2
Inferred
523 98.2
0.8
0.3
0.2
771 98.0
0.9
0.3
0.2
Total
LOI
%
0.5
0.4
0.4
Updated Estimate
SiO₂ Al₂O₃ Fe₂O₃ TiO₂ LOI
Classification Mt
%
%
%
%
%
Measured
10 95.9
1.9
0.7
0.3
0.7
Indicated
237 97.7 1.00
0.40 0.20 0.50
Inferred
521 98.2 0.80
0.30 0.20 0.40
768 98.0 0.90
0.30 0.20 0.40
Total
Change
Mt
%
10
-11
-2
-3
-4.6%
-0.4%
-0.4%
*Note: Interpreted mineralisation is domained into different sand types based on drill logging
data and chemical analysis results. Depletion zones include the upper 0.5 m for
rehabilitation purposes, 2 m base of sands within the ‘grade control’ area, iron richer sand
ridges in the west and minor swamp zones in the east and south of the modelled area.
Differences may occur due to rounding.
Table 1:
Arrowsmith North Mineral Resource Estimate
ASX Listing Rule 5.8.1 Summary
The following summary is provided to assist VRX with public reporting of the Mineral Resource
estimate.
Geology and Geological Interpretation
Silica sand mineralisation at Arrowsmith North occurs within the coastal regions of the Perth Basin,
and the targeted silica sand deposits are aeolian sand dunes that overlie limestones and paleocoastline.
The geological modelling was completed based on government soil mapping data in conjunction with
auger and AC drill logging data. The Mineral Resources were estimated above 3-D wireframe basal
surfaces for the white and yellow sands, with the surfaces based on the geological boundaries
defined by logged sand types and chemical analysis results from the drill data. The horizontal extents
of the interpreted sand layers are limited to within the VRX nominated Arrowsmith North target area
and with reference to the publicly available soil mapping data.
The silica sands are covered by a 300 m thick humus layer and are underlain by limestone.
3
Drilling Techniques
Drilling over the project area was completed by means of AC and hand auger methods. Auger drilling
was completed in 2017 along existing tracks, with drill spacing of 400 m (east) by 1,000 m (north)
along the section lines.
AC drilling was completed in two stages using a Landcruiser mounted drill rig. Stage 1 drilling was
completed in 2019, with holes located on the auger drilling tracks as well as along new section lines,
forming an overall nominal 400 m section line spacing with drill holes nominally spaced at 400 m
(east) by 400 m (north) over the majority of the modelled area. Stage 2 drilling, also referred to as
grade control drilling, was completed in March 2021, with 130 holes drilled for 1,459.1 m. Drilling
was completed on a drillhole spacing of 50 m (east) by 100 m (north). AC drilling hole depths range
between 3 m and 21 m with an average depth of 10.9 m. All holes were drilled vertically.
Drill hole collar locations are shown in Figure 1, with the full drill hole listing in Appendix 1.
Sampling and Sub-sampling Techniques
The 100 mm screw auger drilling samples were taken from 1 m down hole intervals. The sample
was sufficiently moist to allow it to cling to the auger screw, with care taken during screw extraction
to prevent sample disaggregating from the screw and falling back into the hole. At the end of each
1 m sample run, the screw was removed from the hole and the sand sample deposited into a plastic
tub. The samples typically weighed 8 kg.
AC drilling samples are 1 m down hole intervals with sand collected from a cyclone mounted rotary
cone splitter, and approximately 2-3kg (representing 50% of the drilled sand) was collected. Two
sub-samples, A and B, of approximately 200 g were taken from the drill samples. Samples were
bagged and ticketed with sample numbers prior to transport to the analytical laboratory.
Sample Analysis Method
The “A” samples from all drilling were submitted to Intertek Laboratory, located in Maddington, W.A.
The samples were dried and then pulverised in a zircon bowl to reduce the particle size to -75 μm.
Multi-element analysis from the pulverised samples was completed by an initial four-acid digest
including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon tubes. The digest was then
analysed by means of Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry (ICPOES) analysis. Loss on Ignition at 1000°C (LOI) was analysed by Thermal Gravimetric Analyser
(TGA). Silica is then reported by difference (SiO2 % = 100% - (LOI % + Major oxides)).
The assay results have also undergone internal laboratory quality assurance (QA), which includes
the analysis of standards, blanks, and repeat quality control (QC) samples. Standards were included
in the drill sample submissions at a ratio of 1:20. Field duplicate samples were submitted in a ratio
of 1:20, and the laboratory routinely duplicated analyses from the pulverised samples at a ratio of
1:25.
An analysis of all the QC data was undertaken and validates the drill assay dataset for use in the
Mineral Resource estimate.
4
Estimation Methodology
A single block model with two parent cell sizes was constructed and used for grade interpolation.
The first block dimensions of 200 m (E) x 200 m (Y) x 4 m (Z) are considered appropriate for the
areas covered by wide spaced drilling. The second block sizes of 25 m (E) x 50 m (Y) x 2 m (Z) cover
the area with the grade control drilling.
Grade interpolated into the block model included SiO2, Al2O3, CaO, Fe2O3, K2O, LOI (1000°C), MgO
and TiO2. Particle size distribution data (PSD) for -150 µm, >500 µm and > 600 µm were also
interpolated. Grades from top cut and composited data were interpolated into the parent cells by
ordinary kriging. Blocks were estimated using a search ellipse of 150 m (major) x 100 m (semi-major)
x 4 m (minor) dimensions, with a minimum of 6 and a maximum of 16 samples from a maximum of
4 samples per drillholes. Cell discretisation of 3 x 3 x 2 (X, Y, Z) was employed.
Hard boundary estimation was used when estimating within the mineralisation domains, such that
samples from one sand domain could not be used to interpolate blocks in an adjacent domain.
PSD sample analyses for -150, +500 and +600 fractions were interpolated using ordinary kriging.
Blocks were estimated using a search ellipse of 1000 m (major) x 600 m (semi-major) x 2 m (minor)
dimensions for the -150 PSD fraction, and 1500 m (major) x 400 m (semi-major) x 2 m (minor)
dimensions for the +500 and +600 PSD fractions. A minimum of 2 and a maximum of 6 samples
were used for all PSD grade interpolations, from a maximum of 4 samples per drillhole.
A dry bulk density value of 1.66 t/m3 was applied to all blocks in the white and yellow sand domains.
Mineral Resource Classification
The Mineral Resource has been classified based on the guidelines specified in The JORC Code.
The classification level is based upon an assessment of geological understanding of the deposit,
geological and mineralisation continuity, drillhole spacing, QC results, search and interpolation
parameters and an analysis of available density information. JORC Code Clause 49 was also
considered when classifying the Mineral Resource.
The Mineral Resource is classified as a combination of Measured, Indicated and Inferred. Figure 1
shows the distribution of the classification across the deposit.
Material that has been classified as Measured was considered by the Competent Person to be
sufficiently informed by geological and sampling data to confirm geological and grade continuity
between data points. The volumes of silica sand classified as Measured are constrained within the
area drilled in 2021 (aircore “grade control” programme).
Silica sand Mineral Resources must be reported at least in terms of purity and size distribution, in
addition to SiO2 and tonnes, and should also take account of logistics and proximity to markets. Likely
product specifications for the Arrowsmith North deposit are supported by the results of the composite
sample process test work program undertaken between 2018 and 2021.
Cut-Off Grades
No cut-off grades were used for reporting the Mineral Resource. The Mineral Resource is reported
from all classified blocks with interpolated SiO2 grades.
5
Modifying Factors
VRX has completed metallurgical test work on composites of selected drill hole samples during 2018,
2019 and 2021 to gain knowledge of attributes including final product size distribution, purity and
particle shape, so as to allow consideration of potential product specifications and general product
marketability. Discussion of results is presented in JORC Table 1 (Section 3), in Appendix 2.
CSA Global is of the opinion that process test work on the composite drill samples indicates the
Arrowsmith North deposit should be suitable for the eventual production of silica sand for glass,
ceramic and foundry markets. In addition, project location and logistics support the classification of
the Arrowsmith North deposit as an industrial Mineral Resource in terms of Clause 49 of the JORC
Code.
Reasonable Prospects Hurdle
The Competent Person deems that there are reasonable prospects for eventual economic extraction
on the following basis:
•
Available process testwork indicates that likely product qualities for glass, ceramics and foundry
sand are considered appropriate for eventual economic extraction from Arrowsmith North.
•
Potentially favourable logistics and project location support the classification of the Arrowsmith
North deposit as an industrial Mineral Resource in terms of JORC Clause 49.
•
The deposit is located adjacent to major road and rail infrastructure, and is 270 km north of Perth,
which offers a large and suitably qualified workforce to develop the Project.
•
The Mineral Resource has no overburden (excluding a shallow zone of sand to be retained for
rehabilitation purposes) and is of shallow depth.
Pilot Plant Testwork and Product Specifications
VRX has been conducting a pilot testwork program incorporating key process unit operations
reflecting the current process design. Broadly speaking these are elutriation (mimicking the Constant
Density (CD) tank), attritioning and a HydroFloat® pilot. This has been conducted on three parcels
of material totaling ~ 3t that represent the resource average of Arrowsmith North.
The design of the process flow has been developed around the chemical changes required to meet
particular specifications and the subsequent separation into saleable products by the particle size
fractions that are required by the end user. The determination of what products are to be produced
is the result of an incorporation of end user market intelligence and the in-depth knowledge of the
chemistry of the available particle sizes to arrive at the products that return the highest economic
value to the project. Appendix 3 contains the technical data sheets of the products that will bring the
best economic return.
The Company generated particle size data during its drilling programs. This data has been modelled
in the mineral resource to estimate various particle size parameters. A product yield study has been
completed using particle size data generated by the pilot plant testwork to determine the yields of
each of the products. The Ore Reserve schedule is able to effectively model the tonnages of final
products that will be available for marketing and sale to End Users. This model will be an invaluable
tool in maximizing the economics of the operating project.
6
Ore Reserve Estimate Update
The 2019 Probable Ore Reserve of 223 Mt has been updated to 9.2 Mt Proved and 211.8 Mt
Probable Ore Reserves as detailed below. Cube Consulting was engaged by VRX to complete
mining engineering work towards a life of mine production schedule to provide an updated Ore
Reserve estimate for Arrowsmith North.
The scope of work included importing and reconciling the supplied mineral resource block model,
defining mining boundaries for successive schedule timing, preparing the mining area into
appropriate blocks which would form the basis of the mining schedule, preparing a mining schedule
for the total mine life, reporting of the mining schedule physicals including material mined and the
associated products, for inclusion in the financial model, culminating in the reporting of an updated
Ore Reserves estimate for the project.
The production schedule was completed in quarterly increments for the first 7 years, followed by
annual increments for the following 38 years after which the schedule was aggregated and reported
in 5 year increments to the end of the mine’s 111 year life.
Total material movements planned are shown for the first seven years in quarterly increments in
Figure 2 and annually for years 8 to 45 in Figure 3.
The work completed supports the reporting of an updated Ore Reserve estimate for this project in
accordance with the guidelines in the JORC Code. Proved and Probable Ore Reserves have been
derived from the Measured and Indicated Mineral Resources respectively contained within the
mining lease area M70/1389. The Arrowsmith North updated Ore Reserve estimate is shown in
Table 2.
Table 2 Arrowsmith North Open Pit Ore Reserve Estimate – November 2022
Arrowsmith North - Ore Reserves
Updated Estimate
Classification
2019
Ore
Reserve
Proved
Probable
Total
223
223
2022
Update
AFS20
AFS35
AFS55
Local
Mt
9.2
211.8
221.0
Mt
0.8
24.2
25.0
Mt
3.9
102.5
106.4
Mt
2.7
51.1
53.8
Mt
1.8
34.1
35.9
The rounding in the above table is an attempt to represent levels of precision implied in the estimation
process which may result in apparent errors of summation in totals shown in rows or columns.
The prior estimate relies on VRX’s bankable feasibility study for Arrowsmith North announced to
ASX on 28 August 20193. Given the immaterial change to the updated Ore Reserve, all material
assumptions contained in that study continue to apply and have not materially changed from the
date of release of that study. While VRX considers all of the material assumptions to be based on
reasonable grounds, there is no certainty they will be correct or that the range of outcomes indicated
within the study will be achieved.
3 ASX announcement of 28 August 2019, “Arrowsmith North BFS and Maiden Ore Reserve”.
7
Year 8
Year 9
Year 10
Year 11
Year 12
Year 13
Year 14
Year 15
Year 16
Year 17
Year 18
Year 19
Year 20
Year 21
Year 22
Year 23
Year 24
Year 25
Year 26
Year 27
Year 28
Year 29
Year 30
Year 31
Year 32
Year 33
Year 34
Year 35
Year 36
Year 37
Year 38
Year 39
Year 40
Year 41
Year 42
Year 43
Year 44
Year 45
AFS20
AFS20
AFS35
AFS35
AFS55
AFS55
Local Product
Local Product
Overburden Waste
Figure 3 Years 8 to 45 Production Profile
8
Y7_Q4
Y7_Q3
Y7_Q2
Y7_Q1
Y6_Q4
Y6_Q3
Y6_Q2
Y6_Q1
Y5_Q4
Y5_Q3
Y5_Q2
Y5_Q1
Y4_Q4
Y4_Q3
Y4_Q2
Y4_Q1
Y3_Q4
Y3_Q3
Y3_Q2
Y3_Q1
Y2_Q4
Y2_Q3
Y2_Q2
Y2_Q1
Y1_Q4
Y1_Q3
Y1_Q2
Y1_Q1
Year 1 to 7 Quarterly Material Mined by Product
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
Overburden Waste
Figure 2 First 7 Years Production Profile
Year 8 to 45 Annual Material Mined by Product
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
Mining Parameters and Scheduling
The development of the life of mine schedule and ore reserves for the project does not follow
a conventional open pit approach which would normally consist of open pit optimisations and
detailed pit designs prior to the scheduling. This is due to the fact that the entire resource is
planned to be mined and processed into four distinct product categories.
The mined product material is fed onto a conveyor which delivers it to the processing facility
where it to sorted into four product categories as shown in Figure 4.
Figure 4 Product Summary
The Tails, Local Product, shown in Table 3 result from sizing processes for the -150μm size
and from the hydrofloat for the coarser sizings. This mass deportment can therefore be used
to estimate the yield of each of the 4 products from the information contained within the Mineral
Resource Estimate (MRE) blockmodel.
Table 3 Nominal Feed Sizing
The MRE block model has estimated within each block attributes representing the following;
1. % of sand -150μm
2. % of sand +300μm
3. % of sand +600μm
9
New attributes were generated in the Ore Reserve block model to represent 4 sizing groups,
the formula refers to above:
A. % of sand +600μm = 3
B. % of sand -600μm +300μm = 2 – 3
C. % of sand -300μm +150μm = (100- 1) – 2
D. % of sand -150μm = 1
E. There should be a check attribute created adding A, B, C, D which should = 100%
The yield of each final product was then generated by using the mass deportment from Table
6, rounded as follows:
•
•
•
•
+600μm = 17%
-600μm +300μm = 14%
-300μm +150μm = 9%
-150μm = 97.5%
New attributes were then generated in the Ore Reserve block model to reflect the products
shown in Figure 4, and the % calculation of each final product is therefore:
• AFS20 = A x (100% - 17%)
• AFS35 = B x (100% - 14%) + (C x 10%)
• AFS55 = C x (100% - (9% + 10%)
Local Product = D + (A x 17%) + (B x 14%) + (C x 9%)
The next step in the process was to divide the resource into schedule ‘blocks’ to enable the
schedule to achieve mining in a specified sequence to satisfy practical and strategic
objectives. The primary guide for the schedule was to commence mining in the southwest
corner of the project, where the initial processing facility is planned to be set up. The next
target for the schedule is the Development Envelope which is an area specifically delineated
in support of the primary EPA approvals. This area is to be the source of production for
approximately the first 25 years of the operations. Following the depletion of the Development
Envelope area, the remainder of the deposit is to be mined out in a northerly direction.
The schedule mines out the total resource which includes approximately 10Mt outside of the
mining lease area, however the Ore Reserves estimated and reported here were limited to
inside the mining lease area M70/1389. The total blocks scheduled together with the target
Development Area and the Mining Lease are shown in Figure 5 together with the sequencing
of the schedule shown in various progressive increments of Years 1-7; Years 8 to 25 and
Years 25 to 45.
10
Figure 5 Mine Schedule Blocks, Development area and Mining Lease Area
11
The schedule targets total product tonnes of 2.2 Mt per annum over the full mine life with the
exception of the first 2 years which are scheduled at half of the full production target as part
of a conservative ramp up plan. The total material mined averages just over the target of
product tonnes, which is due to the very low volumes of overburden waste to be moved to
expose the target product material. Total material movements planned are shown for the first
seven years, in quarters in Figure 2 and annually for years eight to forty five in Figure 3.
Ore Reserve Estimate
At the conclusion of this study, it was demonstrated that the project is economically viable
considering all relevant factors, test work and design criteria, culminating in a financial analysis
with favourable economic metrics.
The work completed supports the reporting of an updated Ore Reserve estimate for this project
in accordance with the guidelines in the JORC Code. Proved and Probable Ore Reserves
have been derived from the Measured and Indicated Mineral Resources respectively,
contained within the mining lease area M70/1389. The Arrowsmith North updated Ore Reserve
estimate is shown in Table 4.
Table 4 Arrowsmith North Open Pit Ore Reserve Estimate – November 2022
Ore Reserve
Classification
Proved
Probable
Total
Total
Mt
9.2
211.8
221.0
AFS20
Mt
0.8
24.2
25.0
Product
AFS35
Mt
3.9
102.5
106.4
AFS55
Mt
2.7
51.1
53.8
Local
Mt
1.8
34.1
35.9
The rounding in the above table is an attempt to represent levels of precision implied in the
estimation process which can result in apparent errors of summation in some columns.
Figure 6 shows the Arrowsmith North ore reserve area.
12
Figure 6 Arrowsmith North Ore Reserve Area
Future Work
VRX has now completed all mining and processing pre-production works as well as the
production of bulk material of the various final products and detailed engineering design of the
planned processing plant is close to completion. VRX in in the final stages of gaining regulatory
approval to commence construction in 2023.
13
Competent Person’s Statement
The information in this announcement that relates to Arrowsmith Exploration Results are
based on data collected and complied under the supervision of Mr David Reid, in his capacity
as Exploration Manager. Mr Reid, BSc (Geology), is a registered member of the Australian
Institute of Geoscientists and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and the activity being undertaken to
qualify as a Competent Person under the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the
inclusion of the data in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on, and fairly reflects,
information compiled by Mr David Williams, a Competent Person, who is an employee of CSA
Global and a Member of the Australian Institute of Geoscientists. Mr Williams has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as Competent Person as defined in the 2012
Edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources,
and Ore Reserves (JORC Code). Mr Williams consents to the disclosure of information in this
report in the form and context in which it appears.
The information in this report that relates to Industrial Minerals considerations with respect to
Clause 49 of the JORC Code is based on, and fairly reflects, information compiled by Dr
Andrew Scogings, a Competent Person, who is an employee of CSA Global, a Member of the
Australian Institute of Geoscientists and is a Registered Professional Geoscientist (RP Geo.
Industrial Minerals). Dr Scogings has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian
Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Dr Scogings consents to the disclosure of information in this report in the form and
context in which it appears.
The information in this report that relates to metallurgical test work is based on information
compiled by Mr Steven Hoban who is the Principal Metallurgist and a Director of BHM Process
Consultants. Mr. Hoban is a Member of the Australasian Institute of Mining and Metallurgy. Mr
Hoban has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as Competent Person
as defined in the 2012 Edition of the Australasian Code for the Reporting of Exploration
Results, Mineral Resources, and Ore Reserves (JORC Code). Mr Hoban consents to the
disclosure of information in this report in the form and context in which it appears.
The information in this announcement that relates to Ore Reserves is based on information
compiled by Mr Quinton de Klerk, who is employed by Cube Consulting. Mr de Klerk is a
fellow of the Australasian Institute of Mining and Metallurgy and has sufficient experience
which is relevant to the activity he is undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (the JORC Code). Mr de Klerk consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears
14
This announcement has been authorised for release to ASX by the Managing Director, Bruce
Maluish.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
15
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Proje