Quarterly Activity Report
The following is a summary of the activities conducted by VRX
Silica Ltd (VRX Silica or Company) (ASX: VRX) during the
quarter ending 31 March 2020.
ASX: VRX
Capital Structure
Shares on Issue:
445.1 million
Listed Options:
23.9 million
Unlisted Options:
69.5 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
John Geary
Company Secretary
Company Projects
Arrowsmith Silica Sand
Project, 270km north of Perth,
WA.
Muchea Silica Sand Project,
50km north of Perth, WA.
Boyatup Silica Sand Project,
100km east of Esperance, WA.
Biranup base metals and gold
Project adjacent to the
Tropicana Gold Mine, WA.
Figure 1: Muchea Project Location
Muchea Silica Sand Project
The Company is actively
assessing other silica sand
projects in Australia.
During the quarter, the Company through its wholly-owned subsidiary, Wisecat Pty Ltd,
entered into a Native Title Mining Project Agreement for the Muchea Silica Sand Project
(Muchea Project). This was announced to ASX on 31 January 2020.
The Muchea Project is located 50km north of Perth (see Figure 1).
The agreement was entered into with the Whadjuk People Native Title Claim Applicants
under Application WAD242/2011 (as the authorised representatives of the Whadjuk People
Native Title Claim Group) and the South West Aboriginal Land & Sea Council Aboriginal
Corporation (SWALSC) in its capacity as agent for the Whadjuk People. It represents a
significant milestone in the development of the Muchea Project and was the result of
negotiations conducted in good faith with the Whadjuk People and SWALSC.
Under the terms of the agreement, the Whadjuk People give their consent to the grant of the
Mining Lease and the Miscellaneous Licences for the Muchea Project within the Native Title
claim area and the conduct of silica sand mining operations at the Muchea Project. The
agreement also provides for a set of shared long-term objectives for the parties and a range
of measures designed to achieve those objectives over the term of the agreement (being the
life of the Muchea Project). These include:
the preservation and management of Aboriginal heritage within the Mining Lease area
wherever possible pursuant to an agreed Heritage Protocol;
the promotion of awareness of the Whadjuk People’s traditional laws and customs and
facilitation of cross-cultural exchange between the members of the Whadjuk People
and the tenement holder and its employees and contractors;
ensuring the environmental impact of agreed mining operations is managed in
accordance with relevant statutory obligations;
maximising employment and contracting opportunities for Whadjuk People contractors
in connection with agreed mining operations; and
the provision of agreed initial and ongoing compensation to the Whadjuk People for the
effects on Native Title arising from the grant of the Mining Lease and Miscellaneous
Licences within the Native Title claim area, the conduct of mining operations and the
issue of agreed project approvals.
In addition, the agreement contains provisions that are customary for an agreement of this
nature, including as to confidentiality, warranties, force majeure and dispute resolution
procedures.
Signing of this agreement has cleared the path for grant of the Mining Lease and the
Miscellaneous Licences for the Muchea Project. The parties have commenced the formal
process with the National Native Title Tribunal required under this agreement to obtain the
approval of the Minister for Mines for the grant of the Mining Lease. Despite delays caused
by the COVID-19 crisis, the Company expects consent orders to be issued by the Tribunal
and the Mining Lease to be granted in the June quarter.
In parallel, as part of the environmental approvals process for the grant of a Mining Permit at
the Muchea Project, during the quarter the Company has continued to compile necessary
data to support referrals to the Federal Department of Environment and Energy (DotEE) and
the State Environmental Protection Authority (EPA). The Company and its environmental
consultants held pre-referral meetings with representatives from DotEE and received valuable
feedback as to requirements for the referral.
Arrowsmith Silica Sand Projects
Figure 2: Arrowsmith Projects Location
The Company’s Arrowsmith North and Arrowsmith Central Silica Sand Projects (Arrowsmith
Projects) are located 270km north of Perth, WA (see Figure 2).
During the quarter the Company has progressed negotiations with the Southern Yamatji
Native Title Claimants and their representative, the Yamatji Marlpa Aboriginal Corporation
(YMAC), in respect of a proposed mining project agreement for the Arrowsmith Projects and
consent for the grant of the Mining Leases and Miscellaneous Licences for the projects.
Delays caused by the COVID-19 crisis, particularly regulations prohibiting movement in and
out of Aboriginal communities and restrictions on public gatherings hampered progress and
presented unique challenges for completing the process, however the Company continues to
work constructively with YMAC and the Southern Yamatji working party to find a pathway
forward to finalise and sign the formal agreement. The Company expects this process to
conclude in the June quarter, which will clear the path to grant of the Mining Leases for the
Arrowsmith Projects.
Separately in respect of permitting for the Arrowsmith Projects, during the quarter all field
work required to support the environmental referrals for assessment by DotEE was completed
and the formal referral for Arrowsmith North is imminent. The Company understands that the
assessment process with DotEE will not be materially affected by the COVID-19 crisis, and
the Company expects that this procedure for Arrowsmith North will complete and referral to
the State EPA will follow in the June quarter, to be followed by Arrowsmith Central.
During the quarter, the Company has continued discussions with potential customers in Asia
for long-term contracts for offtake of products from both its Arrowsmith and Muchea Projects.
These customers are in Malaysia, Thailand, Taiwan and South Korea. A planned February
road trip through Asia for this purpose was postponed due to the outbreak of COVID-19,
however the Company has progressed discussions via video conferencing and interest
remains strong despite the current economic climate in those countries.
Warrawanda Project
A review of assays conducted on cores from the diamond drilling program undertaken at the
Warrawanda Project indicated that the previously identified quartz outcrops are not of an
economic grade and of insufficient tonnage to warrant further exploration.
During the quarter the Company relinquished exploration licence E52/2372 and surrendered
E52/3447. The Company no longer holds any tenements at the Warrawanda Project.
Corporate
On 29 January 2020, the Company held a general meeting of shareholders seeking Listing
Rule 7.4 ratification of the issue of the shares to a range of sophisticated and institutional
investors pursuant to its November 2019 placement which raised $4 million (before costs).
The Company also sought and received Listing Rule 7.1 approval for the issue of freeattaching options under the placement and options to the lead manager for the placement.
All resolutions were passed following the conduct of a poll.
The options were issued on 31 January 2020 and quoted on ASX from 4 February 2020
under code “VRXO”.
Specific disclosure required under GN23
Details of mining exploration activities
Details of exploration activities are set out above.
The $21,000 expensed for exploration and evaluation expenditure was mainly tenement
rents. The $186,000 amount of exploration and evaluation expenditure capitalised is
comprised of environmental approvals (including flora and fauna assessments, drainage and
dieback studies) ($75,000), heritage surveys and native title approvals ($93,000), water well
design ($9,000) with the balance being sample assays and storage.
Details of mining production and development activities
No production and development activities were undertaken during the quarter.
Details of tenement activities
The tenement schedule on the following page shows all holdings and changes for the
Company and its subsidiaries. The changes during the quarter were the grant of E70/5157 at
the Muchea Project and changes at the Warrawanda Project detailed above.
Details of related party payments
The aggregate amount of payments to related parties and their associates of $101,857
represents directors’ fees and salaries paid during the quarter. These are as follows:
Related Party
Salary and
fees
$
Securities based
payments
$
Superannuation
$
Total
$
Paul Boyatzis
15,000
-
-
15,000
Bruce Maluish
70,053
5,937
-
75,990
Peter Pawlowitsch
10,000
867
-
10,867
--------------------------------This report has been authorised for release to ASX by the Board of Directors.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
M/1389
M/1392
L70/198
L70/199
L70/202
L70/203
L70/208
Granted
Granted
Granted
Granted
Granted
Application
Application
Granted
Granted
Application
Application
Application
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
100%
-
100%
100%
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
100%
100%
-
-
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
Muchea Project – Silica
Tenement
Status
E70/4886
E70/5157
M/1390
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Application
Application
Application
Application
Application
Interest at
beginning of
quarter
100%
-
Boyatup Project – Silica
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
Warrawanda Project - Nickel
Tenement
Status
E52/2372
E52/3447
Relinquished
Surrendered
Interest at
beginning of
quarter
100%
100%
Biranup Project – Base Metals/Gold
Interest at
Tenement
Status
beginning of
quarter
E39/1828
Granted
100%
E38/3191
Granted
100%
E39/2000
Granted
100%
E39/2001
Granted
100%
E39/2003
Granted
100%
E38/3294
Granted
100%
About VRX Silica
VRX Silica Ltd (VRX Silica) (ASX: VRX) has significant silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, located 270km north of Perth, comprise five
granted exploration licences and two mining lease applications pending. Bankable feasibility studies for both
projects have been released, each demonstrating exceptional financial metrics.
The Muchea Silica Sand Project, located 50km north of Perth, comprises two granted exploration licences, with
one mining lease application pending. Muchea is a world-class project with high purity silica sand in situ. A
bankable feasibility study for the project has been released demonstrating outstanding financial metrics.
The Boyatup Silica Sand Project, located 100km east of Esperance, comprises two adjacent granted exploration
licences. Initial indications are that this project will complement the Arrowsmith and Muchea projects while adding
to the range of silica products capable of production.
The Biranup Project, adjacent to the Tropicana Gold Mine in WA’s Goldfields, is prospective for gold and base
metals.
Proven Management
The VRX Silica Board and management team have extensive experience in mineral exploration and mine
development into production and in the management of publicly listed mining and exploration companies.
Project Locations
Share your feedback
Discover