The following is a summary of the activities conducted by VRX Silica Ltd (VRX Silica or Company)
(ASX:VRX) during the quarter ending 30 June 2019.
Exploration and Project Development
On 16 April 2019 VRX Silica announced the Company had received strong interest for the purchase
of significant tonnages of silica sand products from its Arrowsmith and Muchea Projects following the
appointment of Mr Yoonil Kim as its International Sales Manager in November 2018. Mr Kim is a
South Korean national with over 15 years’ experience marketing and selling silica sand products to
glass manufacturers and foundries across the Asia-Pacific region.
The Company has identified numerous markets in the Asia-Pacific region and met with a number of
potential offtake customers for the sale of silica sand products from the Arrowsmith and Muchea
Projects. The Company will be able to commit to binding offtake agreements following the approval of
Mining Permits at its silica sand projects.
VRX Silica has received enquiries and expressions of interest from manufacturers and purchasing
agents for smaller shipments of silica sand product for glassmaking in the following countries:
China (3)
Philippines (2)
Thailand (2)
India (1)
Japan (1)
Korea (1)
Malaysia (1)
Taiwan (1)
With over 270 glassmaking facilities the Chinese glassmaking industry is the most dominant in the
Asia-Pacific region.
Interest to-date for glassmaking quality silica sand totals 1,675,000 tonnes per annum and such
interest is expected to increase as the product catalogue is further distributed. The Company has
also received enquiries and expressions of interest from organisations in the foundry industry in:
South Korea (5)
Japan (1)
Philippines (1)
Taiwan (1)
The highest level of demand was from South Korea, which is the world’s largest foundry market,
predominately in the automobile and ship building industries. Interest to-date for foundry quality silica
sand totals 888,000 tonnes per annum and, as for glassmaking silica sand, such interest is expected
to increase.
Whilst these expressions of interest may not all lead to binding contracts, the Company is confident of
securing adequate offtake to justify the development of its silica sand projects. Further enquiries are
expected and the Company will look to progress this strong interest into binding offtake agreements
before committing to funding arrangements for processing plant requirements.
Testwork Results
On 2 May 2019 VRX Silica Limited announced the results of testwork and confirmation assays for
recoveries of silica sand commercial products from its Arrowsmith Projects (Arrowsmith), located
270km north of Perth, WA, and Muchea (Muchea), 50km north of Perth, WA Silica Sand Projects.
The Company has now conducted three iterations of testwork, with the final iteration completed in
March of this year by CDE Global, a renowned testwork laboratory and process plant fabricator based
in Northern Ireland. The Company has since completed confirmation assays on final products from
that testwork through Nagrom Laboratories in Perth, WA.
During the June quarter the Company released a process circuit design, engineering and cost estimate
by CDE Global for a plant based on this testwork and the final determination of recoveries is based on
this circuit design, which included the attritioning step being conducted twice.
Attritioning is a high energy interaction of grains rubbing on grains which liberates attached fine
particles and reduces particle size by breakage on corners and grain boundaries. This reduces
contaminants and improves particle shape.
VRX Silica is now confident in the process circuit design and the final silica sand products capable of
production. These have been compiled into the products catalogue which the Company continues to
distribute and gauge the response, which to-date has been extremely positive.
Based on the testwork and process circuit mass balance data, the following table summarises the
recovered products:
Arrowsmith North
Product
Industry
Recovery
Arrowsmith - N20
Foundry
24%
Arrowsmith - N40 / NF500
Foundry/Glass
60%
Local Market/Filter/Bunker
Filter/Bunker
6%
Arrowsmith Central
Product
Industry
Recovery
Arrowsmith - C20
Foundry
34%
Arrowsmith - C50/CF400
Foundry/Glass
34%
High TiO2
Mineral Sands
9%
Muchea
Product
Industry
Recovery
Muchea F80C
LCD/Foundry
20%
Muchea F80
Glassmaking
48%
Muchea F150
Glassmaking
20%
Recoveries based on CDE Global/Nagrom Testwork Mass Balance Data
The Company has had strong interest for potential offtake of silica sand products from the Asian region
and these recoveries are of products which will comply with the requirements of interested customers
to date.
Muchea Mineral Resource Estimate Upgrade
On 20 November 2018 VRX Silica reported a maiden Mineral Resource Estimate (MRE) for the
Muchea Silica Sand Project (Muchea), located 50km north of Perth, WA. Since then, during March
2019 the Company conducted a close spaced aircore drill program at Muchea and on 17 June 2019
the Company announced the results of that program.
The aircore drill program was over an area of 217ha, which is a small portion of the 2,900ha Mining
Lease Application area and the most likely starting area for mining. Receipt of the assay results
enabled a new JORC 2012 compliant Mineral Resource Estimate (MRE) to be determined for the
Muchea Silica Sand Project.
The MRE has increased the JORC 2012 Indicated Mineral Resource by 49% to 29 Mt @ 99.6%
SiO2 and the JORC 2012 Inferred Mineral Resource by 4% to 179 Mt @ 99.6% SiO2 for a Total
MRE of 208 Mt @ 99.6% SiO2, an overall increase of 9%, see Tables 1 and 2 below.
This MRE update is based on the results of the March 2019 drilling, combined with a reinterpretation
of the previously modelled sand layer. The reinterpretation investigated layers of low iron sand which
were previously discounted due to colour, and higher levels of clay and organic matter; represented
as Al2O3 and LOI1000C in the assay dataset. The prior MRE was estimated purely on the percentage of
SiO2 rather than defining all material that was amenable to beneficiation to produce glass and foundry
grade silica sand.
The Resource estimate only includes sand three metres above the year 2000 mapped water table
level and discounts the top half metre of topsoil which will be used for rehabilitation.
The low variability of results over the Resource area supports the Company expectation that the
majority of the Indicated Resource will convert to Probable Reserves in our impending BFS.
Testwork indicates that high-grade silica sand can be produced from Muchea, for which there is strong
demand for glassmaking in Asia. Metallurgical testwork to-date has also demonstrated that a section
of sand in the Resource, previously discounted due to logged discoloration, can be beneficiated to
high-grade silica sand products via conventional washing and screening methods. Future drilling and
estimations will include this sand zone which is expected to significantly add to the Resource inventory.
Metallurgical testwork completed to-date confirms this updated silica sand model is considered readily
amenable to upgrading by conventional washing and screening methods to produce a high-purity
silica sand product with high mass recoveries. The high-purity silica sand product specifications are
expected to be suitable for industries such as the glass making and foundry industries.
It is anticipated that further testwork focusing on currently discounted sand layers may result in further
reinterpretation and upgrades to the Muchea MRE.
A more extensive PoW has been lodged to enable an aircore drill program over areas that have been
previously hand augered. Drilling is planned for the September quarter 2019.
Work is ongoing to complete the process for the Mining Lease Applications and Environmental
Approvals at both the Arrowsmith and Muchea Silica Sand Projects.
Figure 1 below shows the MRE separated into two areas defined by the type of drill testing. The
Auger drilling area has not changed since first reported on 20 November 2018 however the Aircore
drilling area has been updated with the additional drilling and reinterpretation.
Figure 1:
Muchea Project schematic geology map showing MRE with separate drill type areas
The MRE results are shown in Table 1, and a plan showing the resource areas and classification is
shown in Figure 2.
Table 1:
Muchea Silica Sand Mineral Resource Estimate as at June 2019
Classification
Million Tonnes
SiO2%
Al2O3%
Fe2O3%
LOI%
TiO2%
Indicated
29
99.6
0.09
0.03
0.22
0.07
Inferred
179
99.6
0.05
0.02
0.23
0.1
Indicated + Inferred
208
99.6
0.06
0.02
0.23
0.1
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe. The upper
(overburden) layer within 0.5 m of surface is depleted from the modelled silica sand unit, being reserved for
rehabilitation purposes. All classified silica sand blocks in the model are reported. Differences may occur due
to rounding.
Table 2:
Tonnage Comparison with Prior estimate
Maiden MRE
June 2019 Update
Difference
(Mt)
(Mt)
Indicated
19
29
+49%
Aircore
Inferred
60
67
+12%
Indicated + Inferred
79
96
+21%
Hand Auger
Inferred
112
112
Indicated
19
29
+49%
Total
Inferred
172
179
+4%
Indicated + Inferred
191
208
+9%
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe. The
upper (overburden) layer within 0.5 m of surface is depleted from the modelled silica sand unit,
being reserved for rehabilitation purposes. All classified silica sand blocks in the model are
reported. Differences may occur due to rounding.
Drill Area
Figure 2:
Classification
Muchea Updated MRE areas and classification
Events Subsequent
Arrowsmith North Mineral Resource Estimate Upgrade
VRX Silica Limited reported a maiden Mineral Resource Estimate (MRE) for Arrowsmith North in
October 2018 based on shallow hand auger drilling. However, on 9 July 2019 VRX Silica announced
the results of an aircore drill program completed during March 2019 at the Arrowsmith North Silica
Sand Project (Arrowsmith North), located 270km north of Perth, WA.
Upon receipt of the analytical results a new Mineral Resource Estimate (MRE) for the Arrowsmith
North Silica Sand Project was upgraded to a JORC Code 2012 compliant Indicated Mineral
Resource of 248 Mt @ 97.7% SiO2 in addition to an Inferred Mineral Resource of 523 Mt @ 98.2%
SiO2 for a Total MRE of 771 Mt @ 98.0% SiO2, an overall increase of 398% on the maiden
estimate, see Tables 3 and 4 below.
The MRE is wholly within granted tenements E70/5109 and E70/5027 which are 100% owned by VRX
Silica and is significant in that it includes an unpredicted 313 million tonnes of white sand at 98.7%
silica. The model defines two different sand types, “Yellow” and “White” sand (Tables 3 and 4), which
are different with respect to their chemistry and particle size distribution.
The Indicated Mineral Resource is predominately within the Mining Lease application area and most
of it is anticipated to convert to Probable Reserves and hence an extremely long-life mining project.
Metallurgical testwork completed to-date confirms this updated silica sand model is considered readily
amenable to upgrading by conventional washing and screening methods to produce a high-purity
silica sand product with high mass recoveries. The high-purity silica sand product specifications are
expected to be suitable for industries such as the glass making, foundry and ceramics industries.
No more drilling is required before the Company will commence mining operations. However, the
Company will undertake a further testwork program on the white sand.
This MRE will now allow the Company to finalise estimates of Ore Reserves which will support the
impending BFS and work is ongoing to complete the process for the Mining Lease Applications and
Environmental Approvals at both the Arrowsmith North and Arrowsmith Central Silica Sand Projects.
Figure 3:
Arrowsmith North Project Location
The Arrowsmith Project area has a mining depth limitation to be above the water table which is 10
metres below the drilling. The MRE has been estimated to a nominal depth well above the water table
and the top half metre of topsoil has been discounted in the MRE as it will be used for rehabilitation.
Figure 4 below shows the drill coverage over the tenements with the underlying sand types shown.
The Arrowsmith North Target Area defines the area to which the MRE is constrained and represents
the area where there are no current restrictions to mining.
Figure 4:
Arrowsmith North Project schematic geology map showing MRE with separate drill
type, Black dots = aircore, Blue dots = auger
The MRE results are shown in Table 13, and a plan showing the resource areas and classification is
shown in Figure 4.
Million
SiO2%
Al2O3%
Fe2O3%
TiO2%
LOI%
Tonnes
33
98.7
0.50
0.20
0.20
0.20
White Sand
215
97.5
1.10
0.40
0.20
0.50
Indicated
Yellow Sand
248
97.7
1.00
0.40
0.20
0.50
All Sand
280
98.7
0.50
0.10
0.20
0.20
White Sand
243
97.7
1.00
0.40
0.20
0.50
Inferred
Yellow Sand
523
98.2
0.80
0.30
0.20
0.40
All Sand
313
98.7
0.54
0.15
0.18
0.24
White Sand
Indicated +
458
97.6
1.08
0.40
0.17
0.52
Yellow Sand
Inferred
771
98.0
0.86
0.30
0.17
0.41
All Sand
*Note: Interpreted silica sand mineralisation is domained above a basal surface wireframe defined based on
drill logging data. The upper (Topsoil) layer within 0.5 m of surface is depleted from the modelled silica sand
unit, being reserved for rehabilitation purposes. All classified silica sand blocks in the model are reported.
Differences may occur due to rounding.
Classification
Domain
Table 3:
Arrowsmith North Silica Sand Mineral Resource Estimate as at July 2019
Classification
Indicated
Inferred
Indicated +
Inferred
Table 4:
Figure 5:
Domain
Maiden
MRE (Mt)
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
White Sand
Yellow Sand
All Sand
44
149
194
44
149
194
Updated
MRE (Mt)
33
215
248
280
243
523
313
458
771
Difference
633%
163%
270%
708%
307%
398%
Tonnage Comparison with Prior estimate
Arrowsmith North Updated MRE by classification.
China Southern Glass Strategic Alliance
On 11 July VRX Silica Limited announced it had entered into a memorandum of understanding (MOU)
with CSG Holding Co Ltd (China Southern Glass or CSG) to form a strategic alliance in connection
with the Company’s Muchea Silica Sand Project, 50km north of Perth (Muchea Project).
China Southern Glass is the largest architectural glass manufacturer in the Peoples’ Republic of China
(PRC), involved in the manufacture and sale of glass products including float glass, display glass,
automotive glass, coated glass, mirrors, colour filter glass, solar glass and conservation glass.
The objectives of the strategic alliance include exploring the potential for marketing, promotion and sale
in the PRC of silica sand products from the Muchea Project and potential sources of capital finance for
the construction of production facilities at the Muchea Project. In addition, the parties will consider
potential for the development of a high-quality glass manufacturing facility in Western Australia for
silica sand products generated from the Muchea Project.
This strategic alliance further highlights the potential for a significant, World-class silica sand mining
operation at Muchea and supports the Company’s assessment of increasing silica sand supply
constraints in the Asia-Pacific region.
The Chinese glassmaking industry is the most dominant in the Asia-Pacific region and China Southern
Glass is the largest architectural glass manufacturer in China and the prospect of working with China
Southern Glass and exploring opportunities in the Chinese silica sand market is a positive opportunity
for VRX Silica.
In April 2019, the Company announced that it received enquiries and expressions of interest from 20
manufacturers across the Asia-Pacific region with potential annual silica sand sales of over 1.6 million
tonnes for glassmaking. The silica sand JORC Mineral Resource identified at both the Company’s
Arrowsmith Silica Sand Project and its Muchea Project is significant and expected to increase and the
Company is capable of producing large quantities of silica sand from each project to satisfy demand.
Under the terms of the MOU, CSG will assist VRX Silica in determining demand and logistics
requirements for silica sand supply in the PRC, including specification for silica sand products and
tonnages, pricing across a range of specifications, contract supply length and transport alternatives.
The MOU provides that the parties are to act in good faith and fair dealing with one another in a cooperative working relationship, however the alliance is non-exclusive and VRX Silica may continue to
deal with other parties in connection with the subject matter of the MOU. In addition, the MOU does
not create a binding commitment by either party to enter into any commercial transaction or
arrangement. The MOU is for an initial term of 6 months, automatically renewed for one additional
period of 6 months. The MOU may be terminated by either party by giving at least 7 days notice.
Corporate
Capital Raising
On 2 April 2019 VRX Silica announced it had received commitments for a capital raising via a share
placement to professional and sophisticated investors together with existing shareholders to raise
approximately $2.26 million before costs (Placement).
The Company used its current placement capacity under Listing Rule 7.1 and 37,666,666 new fully
paid ordinary shares at an issue price of $0.06 per share were issued. VRX Silica directors committed
to subscribe for an aggregate of 4,333,333 shares representing approximately $260,000, subject to
shareholder approval which was given at a general meeting of shareholders held on 30 May 2019.
Funds raised under the Placement have been allocated to completion of feasibility studies and
progression of environmental approvals and mining lease applications at the Company’s Arrowsmith
and Muchea Projects. A portion of the net Placement proceeds will be directed towards exploration
activities at the Boyatup Project and Warrawanda HPQ Project and for general working capital.
Hartleys Limited (AFSL No 230052) acted as lead manager to the Placement.
Interests in Mining Tenements
WESTERN AUSTRALIA
Arrowsmith Project – Silica
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
MLA/1389
MLA/1392
Granted
Granted
Granted
Granted
Granted
Application
Application
Interest at
beginning of
quarter
(%)
100
100
100
100
-
Interests
relinquished,
reduced or
lapsed (%)
-
Interests
acquired or
increased
(%)
100
-
Interest at end
of quarter
(%)
100
100
100
100
100
-
Interest at
beginning of
quarter
(%)
100
-
Interests
relinquished,
reduced or
lapsed (%)
-
Interests
acquired or
increased
(%)
-
Interest at end
of quarter
(%)
100
-
Interest at
beginning of
quarter
(%)
100
-
Interests
relinquished,
reduced or
lapsed (%)
-
Interests
acquired or
increased
(%)
100
Interest at end
of quarter
(%)
100
100
Muchea Project – Silica
Tenement
Status
E70/4886
ELA70/5157
MLA/1390
Granted
Application
Application
Boyatup Project – Silica
Tenement
Status
* E69/3560
E69/3668
Granted
Granted
Tenement transferred subsequent to the June Quarter
Warrawanda Project - Nickel
Tenement
Status
E52/2372
E52/3447
Granted
Granted
Interest at
beginning of
quarter
(%)
Interests
relinquished,
reduced or
lapsed (%)
Interests
acquired or
increased
(%)
100
100
-
-
Interest at
beginning of
quarter
(%)
100
100
100
100
100
100
Interests
relinquished,
reduced or
lapsed (%)
-
Interest at
end of
quarter
(%)
100
100
Biranup Project – Base Metals/Gold
Tenement
Status
E39/1828
E38/3191
E39/2000
E39/2001
E39/2003
E38/3294
Granted
Granted
Granted
Granted
Granted
Granted
Interests
acquired or
increased
(%)
-
Interest at end
of quarter
(%)
100
100
100
100
100
100