Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
March 2024 Quarterly Activities Report
The following is a summary of the activities conducted by VRX Silica Limited (VRX or
Company) during the March 2024 quarter at its silica sand projects at Arrowsmith (located
270 km north of Perth), Muchea (located 50 km from Perth) and Boyatup (located 100 km east
of Esperance), all situated in Western Australia.
VRX Silica Sand Resources
VRX is a Western Australian based pure-play silica sand exploration and development
company with five high-value, advanced, very long-term silica sand projects in Western
Australia, a Tier 1 mining region.
The Company has multi-decade scale contiguous sand deposits on granted Mining Leases
with secure tenure and a combined 1.4Bn tonne Mineral Resource of 99.6% to 99.9% SiO2
grade silica sand.1
The Company and its management team is based in Western Australia, as are its five large
scale, high-grade and low impurity silica sand projects. Each project can be run independently
and supply high-grade silica sand to many diverse markets.
Figure 1: VRX Projects Locations
Applications of Silica Sand
Silica sand is the most-used commodity on the planet after air and water. It is the main
ingredient in all types of glassmaking, including specialty solar panel and high-tech glass.
1 See Resources and Reserves Table
The glass manufacturing industry demand is increasing at a rate of 5-6% per year, or about
8-10 million tonnes pa. Around 47% of the world’s glass is manufactured in Asia.
Silica sand is an essential component of the foundry and casting industries. The largest
foundry industry is in Korea where it dominates the industry particularly for large marine
components. Arrowsmith North can produce three grades of sought after foundry sand. Large
samples have been sent to Korean and Japanese foundry companies and foundry sand
suppliers who have confirmed that the samples meet their rigorous requirements.
Silica sand is also the main ingredient in concrete and is the largest user of available supplies
and a primary reason for depleted resources in Asia including silica sand reserves that may
be beneficiated to glassmaking and foundry quality.
Silica sand is a finite resource that is rapidly being exhausted and the Asia-Pacific region is
currently experiencing increasing demand at a time of a global supply shortfall.
Environmental Approvals Process
On 31 October 2023, VRX provided an update on its application for environmental approval
at Arrowsmith North (Proposal). The update noted that VRX had submitted its Response to
Submissions (RtS) document for review by the State Environmental Protection Authority
(EPA).
The EPA has collated comments from all relevant State Government departments and the
Commonwealth Department of Climate Change, Energy, the Environment and Water
(DCCEEW). The EPA had provided informal preliminary feedback 18 January 2024, and the
Company lodged a response to address these comments.
Subsequent to the end of the quarter, the Company received formal comments on the RtS
from the EPA and DCCEEW. As is standard procedure, the Company is required to update its
RtS document to consider the formal comments provided by the EPA.
Subject to review and acceptance of the updated RtS by the EPA, the EPA will prepare an
assessment report recommending whether the Proposal should be approved by the Western
Australian Environment Minister and provide recommended conditions.
High Grade Silica Flour Testwork
In the previous quarter the Company announced that it had airfreighted a 1,000kg sample of
selected Muchea silica sand to a specialist testwork laboratory in Germany, to undertake
comminution testing to determine the yield and quality of silica flour that can be produced from
the raw material selected from the Muchea Silica Sand Project. This testwork follows the grant
to VRX of $2 million in matched funding under the Investment Attraction Fund (IAF), part of
the State Government’s Diversify WA initiative, a collaboration between government, industry
and the community supporting the WA Government’s focus on creating secure, quality jobs,
growing and diversifying the economy and attracting new investment.
The testwork program followed a typical flow sheet of ball mill grinding followed by air
classification and sizing to produce the specific particle size required by LCD glass
manufacturers. The target specification, provided by VRX, conforms to the requirements of
major producers of LCD screens in Asia.
The testing resulted in determining two critical outcomes; the bond work index (BWI) required
to reduce the particle size of the Muchea sand feed to that required for the product
specification, and the preferred product yield.
The BWI has been determined at 23.7kw/t, with a product yield of 44.1%. These figures are
consistent with VRX expectations for this level of study. The BWI now allows VRX to determine
2
a pilot plant scaled list of equipment’ and basic layouts, and VRX will employ a local
engineering company to design and construct the pilot plant. Once operational, the pilot plant
will be fine-tuned to provide the required specification and an expectation of an increase in
product yield.
On 8 January 2024 VRX announced preliminary results of the testwork were largely in line with
VRX’s expectations and determined that Muchea silica sand is suitable for producing high
grade silica flour for the rapidly expanding LCD glass market.
All testing material and products have been returned to VRX for elemental testing to determine
they conform to product specification for key elements, in particular iron. It is not expected that
the precursor sand has been significantly changed as all media used in testing was ceramic.
Samples of the final products will be sent to the major silica flour customers in Asia to confirm
they conform to their specifications. The overground fines, or “by-product”, will also be
marketed in Asia and in local industries such as fibreglass, paint and epoxy filler applications.
These research and development activities, which start with the production of silica flour, will
ultimately result in high value downstream processing opportunities that will maximise the
value of VRX’s world-class high-quality Muchea Silica Sand Project.
Subsequent to the end of the quarter VRX announced assay results for the high-grade silica
flour produced from Muchea (see below).
VDT Trials
In the previous quarter VRX applied to undertake trials of its vegetation direct transfer (VDT)
mining method and this was approved by the Department of Energy, Mines, Industry
Regulation and Safety and Commonwealth and State environmental authorities for
Arrowsmith North and Muchea.
The Company commissioned fabrication of a modified front-end loader bucket that can be
hitched to a Cat 980 loader. This was completed during the quarter – see Figure 1.
The trial will allow VRX to test alternative approaches to height of mulching prior to VDT and
different depths of excavation by VDT. It will also validate the design of the bucket to enable
the best possible rehabilitation outcome.
3
Figure 2: Modified front-end loader bucket for VDT mining method
Arrowsmith North Updated BFS
On 6 March 2024 VRX announced details of its updated Bankable Feasibility Study (Updated
BFS) at Arrowsmith North, leading the development of the Company’s five silica sand projects.
The initial BFS prepared in August 20192 (2019 BFS) has been updated following detailed
engineering with all capital and operating components recently re-tendered.
The updated BFS confirms that the Arrowsmith North project maintains robust economic
metrics that will potentially supply up to four silica sand products for a growing Asian market.
The capex update incorporates final engineered equipment and supporting infrastructure as
well as the purchase of offset land required to finalise the approvals process. The operating
cost update is based on budgeted estimates by noted contractors and incorporates VRX’s
unique VDT rehabilitation methodology.
Arrowsmith North remains a World-class silica sand project with a Proved and Probable Ore
Reserve of 221Mt @ 99.6% SiO23, and a potential mine life in excess of 100 years.
2
ASX Announcement of 28 August 2019, Arrowsmith North BFS and Maiden Ore Reserve
3 See Resources and Reserves Table
4
Key Outcomes from Updated BFS
Post Tax, ungeared NPV10
$166,700,000
Post Tax, ungeared IRR
35%
Payback period (yrs) (post tax) (ramp up rate)
4.4
Exchange Rate US$/A$
$0.66
Life of Mine (yrs) (BFS Study)
EBIT
Total Sales (25 years) no escalation
25
$965,000,000
$2,691,000,000
Life of Mine C1 costs, FOB Geraldton (inc Royalties)
$31.43
Cashflow after finance and tax
$650,000,000
Capex (2 mtpa)
$66,787,100
Capex contingency (inc)
Life of Mine C1 costs, FOB Geraldton (inc Royalties)
20%
$31.43
Tonnes Processed (million tonnes) (BFS Study)
52
Probable Reserves (million tonnes) @ 99.7% SiO2
Reserve life (yrs)
JORC Resources (million tonnes)
221
111
512
Capital expenditure has increased materially since the 2019 BFS, however this remains
modest with an approx. 4.4 year payback. The increase is largely driven by:
•
a significant change to the process circuit from gravity spirals to attritioning and
HydrofloatTM that will produce superior products but has a higher initial capital cost
component;
•
a significant rise in steel, concrete and construction labour costs for the processing plant,
with prices for fabricated steel having doubled since 2019;
•
additional costs associated with power reticulation, flotation reagent storage and additional
supporting infrastructure for administration and laboratory services;
•
additional costs for the construction of the road and designed and approved Brand
Highway intersection, and
•
purchase of Offset land to conform with State Offsets Policy guidelines.
Figures 3 and 4 show renders of the proposed operating plant and surrounding area.
Capex also includes a 20% contingency, notwithstanding the recent re-tendering of supplied
capital components. This reflects the Company’s conservative approach to pricing when
modelling the financial metrics for the project. In efforts to reduce the capex, the Company
continues to seek out second-hand equipment for refurbishment and to-date has sourced a
feed trommel and final screen, with significant cost-savings as compared to new equipment.
5
Operating expenditure has increased marginally from the 2019 BFS.
Sale prices for silica sand products have been left unchanged towards the lower end of the
range of estimates provided for in the 2019 BFS, despite the growing market for silica sand
products in Asia and upward pricing pressures. Again, this reflects the Company’s
conservative approach to pricing when modelling the financial metrics for the project as well
as providing an additional contingency.
Figure 3: An aerial view render of the proposed Arrowsmith North processing plant and facilities
Figure 4: Close up render of proposed processing plant at Arrowsmith North
The Updated BFS also incorporates production from upgraded Reserves following a new
Mineral Resource Estimate completed in November 20223. This followed a program of close
3
ASX Announcement of 11 November 2022, Arrowsmith North Mineral Resource and Ore Reserve Update.
6
spaced grade control drill holes to increase the confidence in the early mining stages with
approximately 6 years of initial production from Proved Reserves.
A summary of Arrowsmith North Proved and Probable Reserves is set out in Table 1.
Arrowsmith North Ore Reserves - as at 11/11/2022
Classification
Foundry
Product
AFS20
AFS35
AFS55
Glass
Product
Process
Rejects
Mt
Probable Ore Reserve
0.8
3.9
2.7
1.8
9.2
24.2
102.5
51.1
34.1
212
Arrowsmith North Ore Reserve
221
Proved
NF500
Local
Proved Ore Reserve
AFS20
AFS35
Probable
AFS55
NF500
Local
SiO2
%
99.5
99.5
99.2
Al2O3
%
0.25
0.5
0.5
Fe2O3
%
0.07
0.06
0.1
TiO2
%
0.05
0.05
0.05
LOI
%
0.1
0.1
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
Million Tonnes
Million Tonnes
Table 1: Arrowsmith North Ore Reserves as at 11 November 2022
The Updated BFS can be viewed on the Company’s website at:
https://vrxsilica.com.au/resources/reports/.
Key points and assumptions
The Updated BFS is based on only 25 years production from a considerable +100 year mine
life.
Key economic assumptions for the BFS are as follows:
Currency
Australian dollars
Sales contracts in Asia for silica sand are invariably based on $US
and a A$0.66 exchange rate has been applied
Project life
25 years
Total probable Ore Reserve is well in-excess of this time period,
however the model is conservatively restricted to 25 years
Depreciation
15% rate on capital
Corporate tax rate
27% on taxable profit
Production
Steady state of production from Proven Ore Reserves for 6 years and
Probable Ore Reserves over the remaining life of mine. The production
rate for the first 2 years at 1 million tonnes per year and thereafter at 2
million tonnes per year
The Company has currently non-binding Terms and Conditions for
offtake of 200,000 tonnes per year of Arrowsmith North products and
expects further interest once the environmental approvals have been
finalised.
Shares on Issue
583,319,725
NPV estimation discount
rates
Standard financial modelling conducted at a 10% discount rate.
7
Capital cost
Based on estimates ±10% from engineering companies with extensive
experience in sand separation
Operating costs
A$31.56 C1 costs, including royalties
Based on first principles and current rates for equipment
Sales revenue
US$38-43 per dry metric tonne dependent on product type, product
quality, contract terms and quantity
Revenue is constant, based on current prices and ignores any
projected growth in prices
Maximum debt
A$55 million
Borrowing rates
12%
Accounts receivable
30 days
Accounts payable
30 days
Plant maintenance
2% of capital cost per year
Environmental bond
Substituted by the WA Department of Mines, Industry Regulation and
Safety’s “Mining Rehabilitation Fund”
Capex contingency
20%
Yield
AFS 20 Foundry sand
AFS 35 Foundry sand
AFS 55 Foundry sand
11%
48%
24%
(AFS35 and AFS55 can be combined and sold as glass sand)
Yields are based on multiple bulk testwork programs ±3%
Corporate
There was no corporate activity during the March quarter.
Events Subsequent to the End of the Quarter
Capital Raising
On 10 April 2024 VRX announced a renounceable pro-rata entitlement issue to eligible
shareholders on the basis of one new fully paid ordinary share in the Company (New Shares)
for every 13 Shares held on the record date, at $0.07 per New Share , together with one free
attaching option (Attaching Option) for every two New Shares subscribed for and issued with
an exercise price of $0.18 each and expiring on 31 August 2025, to raise up to approx. $3.14
million (before expenses) (Entitlement Offer).
Canaccord Genuity (Australia) Limited (AFSL 234666) has been appointed as lead manager
and underwriter to the Entitlement Offer. The Entitlement Offer is partially underwritten to the
amount of $2.6 million by Canaccord.
The proceeds of the Entitlement Offer will be applied towards the Company’s Muchea project,
Arrowsmith North project, VDT trials and environmental follow-up, working capital and
expenses of the Entitlement Offer.
8
Assay Results for High-Grade Silica Flour
On 22 April 2024 VRX announced the assay results for the high-grade silica flour produced
from Muchea.
Table 2 sets out these results.
Silica Flour
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
99.9
0.09
0.01
0.01
0.03
Table 2: Assay Results
The Company has received a number of enquiries for silica flour products and samples have
been dispatched to a select number of potential customers in Asia.
ASX Listing Rule 5.3 Disclosures
Details of mining exploration activities:
Payments for exploration & evaluation under operating activities of $18K related mainly to
tenement rents.
Payments for exploration & evaluation under investing activities of $277K consists mainly of
environmental surveys and approvals costs, and drilling assays.
There were no substantive mining production and development activities during the quarter.
Details of tenement activities:
During the quarter, Exploration Licence E70/6504 was granted.
Details of related party payments:
The aggregate amount of payments to related parties and their associates of $152K
represents directors’ fees and salaries paid during the quarter.
9
Combined 1.4Bn tonne Mineral Resource
Mineral Resources - as at 09/05/2023
Project
Classification
Indicated
Inferred
Total
Measured
Arrowsmith
Indicated
North
Inferred
Total
Arrowsmith
Inferred
Brand
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup
Total
Total Mineral Resource
Muchea
Mt
SiO₂
%
Al₂O₃ Fe₂O₃
%
%
29
99.6
0.1
179
99.6
0.1
208
99.6
0.1
10
95.9
1.9
237
97.7
1.0
266
98.4
0.7
513
98.0
0.9
523
97.3
1.4
523
97.3
1.4
28.2
96.6
1.7
48.3
96.9
1.5
76.5
96.8
1.5
60
67.8
0.8
60
67.8
0.8
1,381 Million Tonnes
0.0
0.0
0.0
0.7
0.4
0.3
0.3
0.4
0.4
0.4
0.4
0.4
0.2
0.2
TiO₂
%
LOI
%
0.1
0.1
0.1
0.3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.7
0.5
0.4
0.4
0.6
0.6
0.7
0.7
0.7
0.9
0.9
Ore Reserves - as at 09/05/2023
Project
Classification
Product
Mt
SiO2
%
Al2O3 Fe2O3
%
%
F80
10.2
99.9
0.02 0.008
F80C
4.25
F150
4.25
99.8
0.07 0.015
Muchea Ore Reserve
18.7 Million Tonnes
AFS20
0.8
99.5
0.25
0.07
AFS35
3.9
99.5
0.5
0.06
Proved
AFS55
2.7
99.2
0.5
0.1
Local
1.8
Arrowsmith
Proved Ore Reserve
9.2 Million Tonnes
North
AFS20
24.2
99.5
0.25
0.07
AFS35
102.5 99.5
0.5
0.06
Probable
AFS55
51.1
99.2
0.5
0.1
Local
34.1
Probable Ore Reserve
212 Million Tonnes
Arrowsmith North Ore Reserve
221 Million Tonnes
CF400
4.2
99.6
0.25
0.04
C20
8.4
Arrowsmith
Probable
C40
4.2
Central
High TiO2
2.2
<1%
Arrowsmith Central Ore Reserve
18.9 Million Tonnes
Total Ore Reserve 259 Million Tonnes
Muchea
Probable
TiO2
%
LOI
%
0.03
0.1
0.035
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.03
0.1
2%
10
Compliance Statement
The information in this document that relates to the estimation and reporting of the Mineral
Resource and Ore Reserves for the Company’s silica sands projects is extracted from releases
to ASX on 28 August 2019 and 11 November 2022 (Arrowsmith North), 17 September 2019
(Arrowsmith Central), 9 May 2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and
Boyatup (18 August 2022). The Company confirms that it is not aware of any new information
or data that materially affects the information included in this document and all material
assumptions and technical parameters underpinning the estimates continue to apply and have
not materially changed.
The information in this announcement that relates to the previous exploration results have
been cross referenced to the original announcement. The Company is not aware of any new
information or data that materially affects the previous exploration results.
The Company confirms that the form and context in which the Competent Persons’ findings
are presented have not been materially modified.
This quarterly activities report has been approved for release by the Managing Director.
11
Interests in Mining Tenements (Western Australia)
Arrowsmith Project – Silica Sand
Tenement
Status
E70/4986
E70/4987
E70/5027
E70/5109
E70/5197
E70/5817
M70/1389
M70/1392
M70/1418
L70/198
L70/199
L70/202
L70/203
L70/208
L70/229
L70/230
G70/264
G70/265
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Granted
Application
Granted
Granted
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
100%
100%
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
Interests relinquished,
reduced or lapsed
Interests acquired
or increased
Interest at end
of quarter
-
-
100%
100%
100%
-
Muchea Project – Silica Sand
Tenement
Status
E70/4886
E70/5157
E70/5548
E70/5651
M70/1390
M70/1414
L70/200
L70/204
L70/205
L70/206
Granted
Granted
Granted
Application
Granted
Application
Granted
Granted
Application
Granted
Interest at
beginning of
quarter
100%
100%
100%
100%
100%
100%
100%
Boyatup Project – Silica Sand
Tenement
Status
E69/3560
E69/3668
Granted
Granted
Interest at
beginning of
quarter
100%
100%
Dandaragan Project
Tenement
Status
E70/6501
E70/6502
E70/6503
E70/6504
E70/6505
Granted
Granted
Application
Granted
Application
Interest at
beginning of
quarter
100%
100%
-
12
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed
on the ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand
and Central), Muchea and Boyatup in Western Australia.
Silica sand is the most used
commodity on the planet after air and
water. It is the main ingredient in all
types of glassmaking, including
specialty solar panel and high-tech
glass, and foundry casting. It is a
finite resource that is running out,
with the Asia-Pacific region
experiencing an ever-growing supply
shortfall that is driving up prices.
Arrowsmith is located 270km north of
Perth. Arrowsmith North boasts a
minimum 25-year mine life capable
of producing more than 2Mt tonnes
per year of high-grade (99.7% SiO2)*
silica sand for export to the foundry,
container glass and flat glass
markets in Asia, with permitting well
advanced, and will lead production.
Muchea, located 50km north of
Perth, is an ultra-high-grade (99.9%
SiO2)* silica sand project capable of
producing sand required for ultraclear glass for solar panels and other
high-tech glass applications.
Boyatup, located 100km east of Esperance, is under
development and capable of producing sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VRX SILICA LTD
Quarter ended (“current quarter”)
ABN
59 142 014 873
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 March 2024
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
(18)
(264)
(b) development
-
-
(c) production
-
-
(d) staff costs
(410)
(1,106)
(e) administration and corporate costs
(230)
(1,292)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
23
1.5
Interest and other costs of finance paid (on
lease liability)
(6)
(20)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
731
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(660)
(1,928)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(91)
(277)
(903)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Year to date
(9 months)
$A’000
Current quarter
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (bonds deposit)
-
-
2.6
Net cash from / (used in) investing
activities
(277)
(994)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
2,750
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(140)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (repayment of lease liability)
(21)
(60)
3.10
Net cash from / (used in) financing
activities
(21)
2,550
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,168
1,582
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(660)
(1,928)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(277)
(994)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(21)
2,550
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Year to date
(9 months)
$A’000
Current quarter
$A’000
-
-
1,210
1,210
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,210
2,168
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,210
2,168
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
152
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(660)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(277)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(937)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,210
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
1,210
1.29
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
The entity expects the current level of net operating cash flows to reduce slightly for the time
being.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
On 10 April 2024, the entity launched a Renounceable Entitlement Offer based on 1 new
share for every 13 shares held at $0.07 per share to raise approximately $3.14 million
(before expenses). The offer is underwritten up to $2.6 million and expected to be
completed by 7 May 2024.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes, based on the above the entity fully expects to be able to continue its operations and
meet its business objectives.