Arrowsmith North Updated BFS
Released
Released
Announcement PDF
6 March 2024
Arrowsmith North Updated BFS
Highlights:
ASX: VRX
Updated BFS demonstrates robust financial metrics
for a World-class silica sand project
Ungeared NPV10 of $167m based on 25 years mining
of a +100 year Resource
Capital Structure
Shares on Issue:
583 million
Unlisted Options:
58.7 million
Proved and Probable Ore Reserve of 221Mt @
99.5% SiO2
Corporate Directory
Four products for international foundry and
glassmaking industries
Bruce Maluish
Managing Director
Environmental approvals process nearing
completion and VDT trials to commence
VRX Silica Limited (VRX or Company) (ASX: VRX) is pleased to
announce details of its updated Bankable Feasibility Study
(Updated BFS) at its Arrowsmith North Silica Sand Project
(Arrowsmith North) located 270km north of Perth, WA, leading
the development of the Company’s five silica sand projects.
The initial BFS prepared in August 20191 (2019 BFS) has been
updated following detailed engineering with all capital and
operating components recently re-tendered.
Paul Boyatzis
Non-Executive Chairman
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
VRX Managing Director Bruce Maluish said:
Muchea Silica Sand
Project, 50km north of
Perth, WA.
“The updated BFS confirms that the Arrowsmith North project
maintains robust economic metrics that will potentially supply up
to four silica sand products for a growing Asian market.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
“The capex update incorporates final engineered equipment and
supporting infrastructure as well as the purchase of offset land
required to finalise the approvals process. The opex update is
based on budgeted estimates by noted contractors and
incorporates our unique VDT rehabilitation methodology.
“With a Proved and Probable Ore Reserve of 221Mt @ 99.6%
SiO2, and a potential mine life in excess of 100 years, Arrowsmith
North remains a World-class silica sand project.”
1
ASX Announcement of 28 August 2019, Arrowsmith North BFS and Maiden Ore Reserve
Geothermal Energy
Dandaragan Geothermal
Energy Permit, 145km
north of Perth, WA
The Company is actively
assessing other silica sand
and downstream
processing projects in
Australia.
Key Outcomes from Updated BFS
Post Tax, ungeared NPV10
$166,700,000
Post Tax, ungeared IRR
35%
Payback period (yrs) (post tax) (ramp up rate)
4.4
Exchange Rate US$/A$
$0.66
Life of Mine (yrs) (BFS Study)
EBIT
Total Sales (25 years) no escalation
25
$965,000,000
$2,691,000,000
Life of Mine C1 costs, FOB Geraldton (inc Royalties)
$31.43
Cashflow after finance and tax
$650,000,000
Capex (2 mtpa)
$66,787,100
Capex contingency (inc)
Life of Mine C1 costs, FOB Geraldton (inc Royalties)
20%
$31.43
Tonnes Processed (million tonnes) (BFS Study)
52
Probable Reserves (million tonnes) @ 99.7% SiO2
Reserve life (yrs)
JORC Resources (million tonnes)
221
111
512
Capital expenditure has increased materially since the 2019 BFS, however this remains
modest with an approx. 4.4 year payback. The increase is largely driven by:
•
a significant change to the process circuit from gravity spirals to attritioning and
HydrofloatTM that will produce superior products but has a higher initial capital cost
component;
•
a significant rise in steel, concrete and construction labour costs for the processing plant,
with prices for fabricated steel having doubled since 2019;
•
additional costs associated with power reticulation, flotation reagent storage and additional
supporting infrastructure for administration and laboratory services;
•
additional costs for the construction of the road and designed and approved Brand
Highway intersection, and
•
purchase of Offset land to conform with State Offsets Policy guidelines.
Figures 1 and 2 show renders of the proposed operating plant and surrounding area.
Capex also includes a 20% contingency, notwithstanding the recent re-tendering of supplied
capital components. This reflects the Company’s conservative approach to pricing when
modelling the financial metrics for the project. In efforts to reduce the capex, the Company
continues to seek out second-hand equipment for refurbishment and to-date has sourced a
feed trommel and final screen, with significant cost-savings as compared to new equipment.
2
Operating expenditure has increased marginally from the 2019 BFS.
Sale prices for silica sand products have been left unchanged towards the lower end of the
range of estimates provided for in the 2019 BFS, despite the growing market for silica sand
products in Asia and upward pricing pressures. Again, this reflects the Company’s
conservative approach to pricing when modelling the financial metrics for the project as well
as providing an additional contingency.
Figure 1: An aerial view render of the proposed Arrowsmith North processing plant and facilities
Figure 2: Close up render of proposed processing plant at Arrowsmith North
3
The Updated BFS also incorporates production from upgraded Reserves following a new
Mineral Resource Estimate completed in November 20222. This followed a program of close
spaced grade control drill holes to increase the confidence in the early mining stages with
approximately 6 years of initial production from Proved Reserves.
A summary of Arrowsmith North Proved and Probable Reserves is set out in Table 1.
Arrowsmith North Ore Reserves - as at 11/11/2022*
Classification
Foundry
Product
AFS20
AFS35
AFS55
Glass
Product
Process
Rejects
Mt
Probable Ore Reserve
0.8
3.9
2.7
1.8
9.2
24.2
102.5
51.1
34.1
212
Arrowsmith North Ore Reserve
221
Proved
NF500
Local
Proved Ore Reserve
AFS20
AFS35
Probable
AFS55
NF500
Local
SiO2
%
99.5
99.5
99.2
Al2O3
%
0.25
0.5
0.5
Fe2O3
%
0.07
0.06
0.1
TiO2
%
0.05
0.05
0.05
LOI
%
0.1
0.1
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
Million Tonnes
Million Tonnes
Table 1: Arrowsmith North Ore Reserves as at 11 November 2022
* The estimation and reporting of the Ore Reserves for Arrowsmith North is extracted from releases to ASX on 28 August 2019
and 11 November 2022. The Company is not aware of any new information or data that materially affects the above information
and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
The Updated BFS can be viewed on the Company’s website at:
https://vrxsilica.com.au/resources/reports/.
Environmental Approvals Process
On 31 October 2023, VRX provided an update on its application for environmental approval
at Arrowsmith North (Proposal). The update noted that VRX had submitted its ‘Response to
Submissions’ document for review by the State Environmental Protection Authority (EPA).3
The EPA has collated comments from all relevant State Government departments and
awaiting comments from the Commonwealth Department of Climate Change, Energy, the
Environment and Water. In the interim, the EPA has provided preliminary comments, and the
Company has lodged a response to address these comments. As is standard procedure, the
Company will be required to update its ‘Response to Submissions’ document in response to
all formal comments once they are provided by the EPA.
Subject to review and acceptance of the updated ‘Response to Submissions’ document by the
EPA, the EPA will prepare an assessment report recommending whether the Proposal should
be approved by the Western Australian Environment Minister and provide recommended
conditions.
2
3
ASX Announcement of 11 November 2022, Arrowsmith North Mineral Resource and Ore Reserve Update.
ASX Announcement of 31 October 2023, Update on Arrowsmith North Environmental Approvals Process.
4
VDT Trials
VRX has applied to undertake trials of its vegetation direct transfer (VDT) mining method. This
has been approved by the Department of Energy, Mines, Industry Regulation and Safety and
Commonwealth and State environmental authorities for Arrowsmith North and Muchea.
To this end the Company commissioned fabrication of a modified front-end loader bucket that
can be hitched to a Cat 980 loader. This was recently completed – see Figure 3.
The trial will allow VRX to test alternative approaches to height of mulching prior to VDT and
different depths of excavation by VDT. It will also validate the design of the bucket to enable
the best possible rehabilitation outcome.
Figure 3: Modified front-end loader bucket for VDT mining method
5
Updated BFS Summary
The Updated BFS details the project and financial attributes supporting the development of
Arrowsmith North (see Figure 4).
Figure 4: Arrowsmith North Project Area
6
Silica sand markets
Globally, silica sand remains in a growth phase, with both volume and value having increased
worldwide. Increasing use of flat glass in photovoltaic modules, solar panels and e-glass,
owing to rising need for clean energy, is expected to be a key factor driving market growth.
Technological developments in terms of energy harnessing coupled with superior properties
including recyclability and sustainability will positively affect market growth.
Construction spending and manufacturing output worldwide are expected to drive growth in
important silica sand-consuming industries, including the glass, foundry and building products
sectors.
The Asia-Pacific region is expected to remain the largest regional consumer of industrial sand.
The container glass industry will drive further silica sand sales, supported by rising production
of glass bottles, particularly in the alcoholic beverage sector including wine and beer.
Products
High-grade silica sand is a key raw material in the industrial development of the world,
especially in the glass, metal casting, and ceramics industries. High-grade silica sand contains
a high portion of silica (over 99% SiO2) and is used for applications other than construction
aggregates. Unlike construction sands, which are used for their physical properties alone,
high-grade silica sands are valued for a combination of chemical and physical properties.
Glassmaking
Silica sand is the primary component of all types of standard and specialty glass. It provides
the essential SiO2 component of glass formulation; its chemical purity is the primary
determinant of colour, clarity and strength in glass. Industrial sand is used to produce flat glass
for building and automotive use, container glass for foods and beverages, and tableware. In
its pulverised form, ground silica is required in the production of fibreglass insulation and for
reinforcing glass fibres. Specialty glass applications include test tubes and other scientific
tools, incandescent and fluorescent lamps.
Foundry Sand
Silica sand is an essential part of both the ferrous and non-ferrous foundry industries. Metal
parts ranging from engine blocks, heads and manifolds to sink faucets are cast in a sand-andclay mould to produce their external shape, often using a resin coat to create the desired
internal shape. Silica’s high fusion point (1,760°C) and low rate of thermal expansion produce
stable cores and moulds compatible with all pouring temperatures. Its chemical purity also
helps prevent interaction with catalysts or affecting the curing rate of chemical binders, for that
reason, customers are looking for high quality silica sand that meets their specifications for
size and shape. Silica sand is an essential part of both the ferrous and non-ferrous foundry
industries. Metal parts ranging from engine blocks to sink faucets are cast in a sand-and-clay
mould to produce their external shape, often using a resin coat to create the desired internal
shape. Silica’s high fusion point (1,760°C) and low rate of thermal expansion produce stable
cores and moulds compatible with all pouring temperatures. Its chemical purity also helps
prevent interaction with catalysts or affecting the curing rate of chemical binders, for that
reason, customers are looking for high quality silica sand that meets their specifications for
size and shape.
7
Paint Fillers
Paint formulators select micron-sized silica sand to improve the appearance and durability of
architectural and silica paint and coatings. High purity silica produces critical performance
properties such as brightness and reflectance and colour consistency. In architectural or
exposed paints (Ship and Container especially), silica fillers improve tint retention, durability,
and resistance to dirt, mildew, cracking and weathering. Low oil absorption allows increased
pigment loading for improved finish colour. In marine and maintenance coatings, the durability
of silica imparts excellent abrasion and corrosion resistance.
Filtration and Water Production
Silica sand is used to filter water to become drinkable. It is also necessary in the processing
of wastewater and the production of clean water from wells. Uniform grain shapes and grain
size distributions produce efficient filtration bed operations for the removal of contaminants
from wastewater to provide potable water. As silica is chemically inert, it will not degrade or
react when it encounters acids, contaminants, volatile organics or solvents. Silica is used as
packing material in deep-water wells to increase yield from the aquifer by expanding the
permeable zone around the well screen and by preventing the infiltration of fine particles from
the formation.
Glass Manufacturing Basics
Manufactured glass is the single largest use of silica sand after construction/concrete sands.
The key to well manufactured glass is to have the correct particle size (below 600µm).
Size segregation of silica sand represents a major processing function. Each glass maker may
have slightly different requirements for their gradation, but generally they want raw materials
to range from 0.106 to 0.60mm. After processing to remove impurities, and classifying the
product into its proper size range, the next step is drying the product. Glass producers
generally prefer the raw materials to contain less than 5% moisture.
The physical specifications deal exclusively with particle size. The grain size of batch materials
strongly affects the amount of energy required for melting. Glass makers prefer a near uniform
size within the batch ingredients to ensure efficient melting. However, in reinforcing fiberglass,
more than 99.5% of the raw material grains are smaller than 0.045 mm (45μm). There is
consideration to tighten these limits from 0.5% larger than 45μm, especially for coarse
particles that are the most difficult component to melt. Grain shape of the sand also affects
melting. If the majority of the batch is coarser than the specified range, incomplete melting
often occurs, which results in a poor-quality product.
Glassmaking is a major sector which needs consistent quality, correctly sized, and low iron
content silica sand. Silica sand is the major raw material used in glassmaking, comprising
some 65 to 75% by volume of raw material, but far less percentage than that by value. Glass
manufacturers usually classify silica sand into separate groups on the basis of chemical and
physical properties.
8
Key points and assumptions
The Updated BFS is based on only 25 years production from a considerable +100 year mine
life.
The project remains a potentially new long-term industry for Western Australia with substantial
economic benefits, including long-term employment and royalties with a significant economic
contribution to the local and Mid West region.
The Company has met with the local Shires, Mid West Development Commission, Mid West
Chamber of Commerce & Industry and various Members of State and Federal Parliament with
substantial support for the project.
VRX has developed a mining and rehabilitation methodology (vegetation direct transfer or VDT)
specific to the environment at Arrowsmith North which will enable a superior restoration of
mined areas: https://vrxsilica.com.au/miningandrehabilitationmethodology/
A key challenge for industrial minerals projects is meeting market specifications. The silica sand
market has specifications for parameters such as purity (e.g. SiO 2 content) in addition to tight
specifications for trace elements such as Fe, Ti, Al and Cr in the glass industry.
The Company is confident that it can meet these specifications from Arrowsmith North and will
maintain the integrity of the quality with a comprehensive continuous QA/QC regime.
Key economic assumptions for the BFS are as follows:
Currency
Australian dollars
Sales contracts in Asia for silica sand are invariably based on $US
and a A$0.66 exchange rate has been applied
Project life
25 years
Total probable Ore Reserve is well in-excess of this time period,
however the model is conservatively restricted to 25 years
Depreciation
15% rate on capital
Corporate tax rate
27% on taxable profit
Production
Steady state of production from Proven Ore Reserves for 6 years and
Probable Ore Reserves over the remaining life of mine. The production
rate for the first 2 years at 1 million tonnes per year and thereafter at 2
million tonnes per year
The Company has currently non-binding Terms and Conditions for
offtake of 200,000 tonnes per year of Arrowsmith North products and
expects further interest once the environmental approvals have been
finalised.
Shares on Issue
583,319,725
NPV estimation discount
rates
Standard financial modelling conducted at a 10% discount rate.
Capital cost
Based on estimates ±10% from engineering companies with extensive
experience in sand separation
Operating costs
A$31.56 C1 costs, including royalties
Based on first principles and current rates for equipment
9
Sales revenue
US$38-43 per dry metric tonne dependent on product type, product
quality, contract terms and quantity
Revenue is constant, based on current prices and ignores any
projected growth in prices
Maximum debt
A$55 million
Borrowing rates
12%
Accounts receivable
30 days
Accounts payable
30 days
Plant maintenance
2% of capital cost per year
Environmental bond
Substituted by the WA Department of Mines, Industry Regulation and
Safety’s “Mining Rehabilitation Fund”
Capex contingency
20%
Yield
AFS 20 Foundry sand
AFS 35 Foundry sand
AFS 55 Foundry sand
11%
48%
24%
(AFS35 and AFS55 can be combined and sold as glass sand)
Yields are based on multiple bulk testwork programs ±3%
Ore Reserves and Mineral Resources
The BFS Update is based the Company’s Ore Reserves (Table 2) and Mineral Resources
(Table 3) as follows:
Arrowsmith North Ore Reserves as at 11/11/22
Classification
Total
AFS20
AFS35
AFS55
Local
Mt
Mt
Mt
Mt
Mt
Proved
9.2
0.8
3.9
2.7
1.8
Probable
211.8
24.2
102.5
51.1
34.1
Total
221.0
25.0
106.4
53.8
35.9
Table 2: Arrowsmith North Open Pit Ore Reserve Estimate as at 11 November 2022
* The estimation and reporting of the Ore Reserves for Arrowsmith North is extracted from releases to ASX on 28 August 2019
and 11 November 2022. The Company is not aware of any new information or data that materially affects the above information
and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
10
Arrowsmith North Mineral Resource as at 09/05/23
Classification
Mt
SiO₂ %
Al₂O₃ %
Fe₂O₃ %
TiO₂
%
LOI
%
Measured
10
95.9
1.9
0.7
0.3
0.7
Indicated
237
97.7
1.0
0.4
0.2
0.5
Inferred
266
98.4
0.7
0.3
0.2
0.4
Total
513
98.0
0.9
0.3
0.2
0.4
Table 3: Arrowsmith North Mineral Resource Estimate as at 9 May 2023
* The estimation and reporting of the Mineral Resources for Arrowsmith North is extracted from releases to ASX on 28 August
2019, 11 November 2022 and 9 May 2023. The Company is not aware of any new information or data that materially affects
the above information and all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Mining Parameters and Scheduling
The development of the life of mine schedule and ore reserves for the project does not follow
a conventional open pit approach which would normally consist of open pit optimisations and
detailed pit designs prior to the scheduling. This is due to the fact that the entire resource is
planned to be mined and processed into four distinct product categories.
The production schedule was completed in quarterly increments for the first 7 years, followed
by annual increments for the following 38 years after which the schedule was aggregated and
reported in 5 year increments to the end of the mine’s 111 year life.
Total material movements planned are shown for the first seven years in quarterly increments
in Figure 5 and annually for years 8 to 45 in Figure 6.
Year 1 to 7 Quarterly Material Mined by Product
700,000
600,000
500,000
400,000
300,000
200,000
100,000
Y1_Q1
Y1_Q2
Y1_Q3
Y1_Q4
Y2_Q1
Y2_Q2
Y2_Q3
Y2_Q4
Y3_Q1
Y3_Q2
Y3_Q3
Y3_Q4
Y4_Q1
Y4_Q2
Y4_Q3
Y4_Q4
Y5_Q1
Y5_Q2
Y5_Q3
Y5_Q4
Y6_Q1
Y6_Q2
Y6_Q3
Y6_Q4
Y7_Q1
Y7_Q2
Y7_Q3
Y7_Q4
0
AFS20
AFS35
AFS55
Local Product
Overburden Waste
Figure 5: First 7 Years Production Profile
11
Year 8 to 45 Annual Material Mined by Product
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year
8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44
AFS20
AFS35
AFS55
Local Product
Overburden Waste
Figure 6: Years 8 to 45 Production Profile
The schedule targets total product tonnes of 2.2 Mt per annum over the full mine life with the
exception of the first 2 years which are scheduled at half of the full production target as part
of a conservative ramp up plan. The total material mined averages just over the target of
product tonnes, which is due to the very low volumes of overburden waste to be moved to
expose the target product material. Total material movements planned are shown for the first
seven years, in quarters in Figure 5 and annually for years eight to 45 in Figure 6.
At the conclusion of this study, it was demonstrated that the project is economically viable
considering all relevant factors, test work and design criteria, culminating in a financial analysis
with favourable economic metrics.
The work completed supports the reporting of the Ore Reserve estimate for this project in
accordance with the guidelines in the JORC Code. Proved and Probable Ore Reserves have
been derived from the Measured and Indicated Mineral Resources respectively, contained
within the mining lease area M70/1389.
Material Modifying Factors – Mining Factors
The mining method chosen for Arrowsmith North is a rubber wheeled front-end loader, feeding
into a 2 mm trommel screen to remove oversize particles and organics. The undersize sand
is slurried and pumped to a sand processing plant which is located in the south west corner of
the Mining Development Envelope within M70/1389. After processing, the silica sand is loaded
into trucks for bulk export from Geraldton Port.
Mining of the sand dune will extract to the base of the Proven/Probable Ore Reserve and will
leave a slightly undulating surface. On the eastern side of the mining area the sand will slope
upward as a 10% gradient to the top of the adjacent dunes.
12
Figure 7: Mining method
Material Modifying Factors – Environmental Studies
Development location:
•
South of the Yardongo Nature Reserve
•
Approximately 10 km inland of the coast
•
North of the Arrowsmith River (Registered Aboriginal Heritage Site)
•
Outside of World Heritage Areas, National Heritage Places, Ramsar Wetlands,
Conservation Reserves or Commonwealth Marine Reserves
The Proven/Probable Ore Reserve is located within an area of deep loose, pale yellow sands,
leached of nutrients. The vegetation is coastal low scrub heath (known as Kwongan Heath).
There are relict dune structures which are represented as low rolling hills.
Assessment Process:
•
Referral submission to the Federal Department of the Environment and Energy (DotEE)
since renamed Commonwealth Department of Climate Change, Energy, the Environment
and Water (DCCEEW);
•
Submission of Section 38 referral to State Environmental Protection Authority (EPA);
•
Confirmed an Accredited Environment Protection and Biodiversity Conservation Act 1999
(Cth) Assessment under the State Environmental Protection Act 1986 (WA) via an
Environmental Review Document (ERD) with a 30 day public environmental review (PER)
period ;
•
ERD lodged in April 2022 with updates submitted in June 2022 and February 2023;
13
•
PER period ended July 2023 and Summary of Submissions from PER provided by EPA to
VRX in September 2023;
•
VRX lodged its ‘Response to Submissions’ (RtS) October 2023 for further assessment by
EPA and other authorities;
•
VRX awaiting formal notice of comments on RtS from State Government Departments and
DCCEEW, being collated by EPA
Mining proposal and Works Approval lodged for assessment in parallel with the ERD
Mitigation Strategies
•
Proposed Action lies within a large Development Envelope, allowing for the flexibility to
target areas of lower significance to matters of national environmental significance;
•
Disturbance will be kept to a minimum, up to 25 ha per year and 14 ha cleared for the
duration of the project;
•
Progressive rehabilitation using topsoil re-location via the VDT mining method to ensure
topsoil and plants are translocated intact to previously mined areas;
•
Conduct further surveys required under approval commitments.
There are no mine tailings storage requirements.
There are no waste dumps.
Processing requires no toxic chemicals.
Material Modifying Factors – Infrastructure
The project is located on Unallocated Crown Land which is east of freehold land and bounded
to the north by a Nature Reserve and by the 100% held VRX Mining Lease M70/1418. The
east boundary of the project area is the limit of tenure of Mining Lease M70/1389. The Brand
Highway is proximal to the area and access is via either the Mount Adams Road from the north
or a proposed southern access road to Brand Highway to the south. The Eneabba/Geraldton
railway line lies to the south west of the project and will be considered for future use to
transport the processed silica sand to Geraldton Port for bulk export.
The project will require its own installed power and water infrastructure.
Labour will be sourced from the nearest towns Dongara and Eneabba (approximately 30km
from the mine site) and there will be no accommodation installed at the mine site.
Costs
Operating costs
Operating costs have been determined from first principles and are estimated to include all
costs to mine, process, transport and load product on to ships. They are estimated on one
million tonnes per year throughput, with expected unit cost savings if throughput is increased
as anticipated to potentially 2 million tonnes per year.
14
Royalties
The prevailing rate of royalty due to the State is used in the Company’s economic
assessments. The State Royalty rate is A$1.17 per dry metric tonne and reviewed every
5 years (next due in 2025). There are no other royalties payable (including private).
Revenue
Product Quality
Multiple products will be differentiated during processing subject to required particle size
distribution by screening. Recovery of products has been independently assessed by BHM
Metallurgical Consultants.
Commodity Prices
Maintaining its conservative approach to pricing for silica sand products, the Company has
based pricing at the same level as in the 2019 BFS.
The industry standard is that sales contracts are in US dollars. The exchange rate to convert
to Australian dollars will be the prevailing rate at the time of payment.
Subject to final quality produced, the prices for the commodity will range from US$38 to US$43
per dry metric tonne Incoterms Free on Board (FOB) international contracts of sale. There are
no shipping cost estimates with all contracts to be based on FOB rates.
Revenue will be based on a negotiated per shipment basis per dry metric tonne FOB with
payment by demand on an accredited bank letter of credit.
There will be no other treatment, smelting or refining charges.
Market Assessment
The global value and volume of the silica sand market indicated growing demand for supply
of silica sand as shown in Figure 8. The future tightening of supply of suitable quality silica
sand, particularly for glassmaking, is commensurate with future increases in price.
Figure 8: Global Washed Silica Sand Market by Value and Volume (2018 to 2031). Report by Report Ocean Pvt
Ltd, 2023.
15
Economic Factors
The Company’s economic analysis has calculated a 10% discounted ungeared post tax net
present value (NPV).
The assessment has not considered any escalated future product prices nor any inflation to
operating costs. The analysis has used a US$/A$ exchange rate of US$0.66/A$1.00.
The analysis is based on a 25-year production profile despite the Probable Ore Reserve far
exceeding that project life.
Capital requirements are based on independent estimates following detailed engineering and
re-tendered prices late 2023 and early 2024.
The analysis is most sensitive to the exchange rate and sales prices.
The analysis indicates the financials of the project are robust and there is a high confidence
that a viable long-term mining operation can be justified.
Social Factors
The Company was granted a mining lease (M70/1389) in November 2020.
The Mining Lease area lies within the former Southern Yamatji Native Title claim boundaries
(WC2017/002), which claim has been superseded by the State and Yamatji Nation Indigenous Land Use Agreement that was executed in February 2020. The Company enjoys
a strong relationship with, and continues to engage with, Traditional Owners and their
representatives.
The project is wholly on Unallocated Crown Land. There is little negative impac