RIU Sydney Resources Round Up Presentation
Released
Released
Announcement PDF
Silica Sand
An Emerging Mining Sector
Western Australian
Silica Sand Projects
May 2023
Important information
Disclaimer
This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be read in that context.
The information contained in this document is not investment or financial product advice and is not intended to be used as the basis for making an investment decision In preparing and providing this document, VRX has not considered the objectives,
investment profile, financial position or needs of any particular recipient Mineral exploration is subject to significant risk. There is no guarantee of exploration success, and even if exploration success is achieved, there is no guarantee that development
of any mineral deposit will be economically viable VRX strongly suggests that investors consult a financial advisor prior to making an investment decision.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation To the maximum extent permitted by law, none of VRX, its
related bodies corporate, or their shareholders, directors, officers, employees, contractors, agents or advisors, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from
the use of information contained in this document.
This document may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions Forward looking statements can generally be identified by the use of the words “anticipate“, believe”,“ expect”,“ project”,“
forecast”,“ estimate”,“ likely”,“ intend”,“ should”,“ could”,“ may”,“ target”,“ plan”,“ guideline”,“ and other similar expressions Indications of, and guidance on, revenue models, pricing, earnings and financial position and performance are also forward
looking statements.
Such forward looking statements are not guarantees of future pricing, performance and events, and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of VRX, its related bodies corporate, and their
directors, officers, employees, contractors, agents and advisors, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or achievements may vary materially from any projections
and forward looking statements and the assumptions on which those statements are based In particular, potential revenue opportunities and guideline pricing models set out in this document are based on certain assumptions which may in time prove
to be false, inaccurate or incorrect Readers are cautioned not to place undue reliance on forward looking statements and VRX assumes no obligation to update such information.
This document is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities in any jurisdiction, and neither this presentation nor anything contained in it forms the basis of any contract or
commitment. Without limiting the foregoing, this document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States The securities of VRX have not been, and will not be, registered under the US Securities
Act of 1933 as amended (Securities Act) or the securities laws of any state or other jurisdiction of the United States, and may not be offered or sold in the United States except in compliance with the registration requirements of the Securities Act and
any other applicable securities laws or pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws.
Competent Persons Statement
The information in this document that relates to Arrowsmith North, Arrowsmith Central, Arrowsmith Brand and Muchea Exploration Results, and Arrowsmith Brand and Muchea Aircore Drilling Area Mineral Resources, are based on data collected and
compiled under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr Reid, BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code). Mr Reid consents to the inclusion of the data in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Auger area Mineral Resources is based on information compiled by Mr Grant Louw who is a full-time employee of CSA Global, under the direction and
supervision of Dr Andrew Scogings, who is an Associate of CSA Global. Dr Scogings is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. He is a Registered Professional Geologist in
Industrial Minerals. Dr Scogings has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the
Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Dr Scogings consents to the disclosure of information in this report in the form and context in which it appears.
The information in this report that relates to Arrowsmith North, Arrowsmith Central and Muchea Probable Ore Reserves is based on data collected and compiled under the supervision of Mr David Reid, who is a full-time employee of VRX Silica. Mr Reid,
BSc (Geology), is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a
Competent Person under the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Reid consents to the inclusion of the data in the form and context in which it appears.
Assumptions Underpinning Mineral Resources and Ore Reserves
The information in this document that relates to the estimation and reporting of the Mineral Resources and Ore Reserves for the Company’s silica sand projects is extracted from releases to ASX on 28 August 2019 and 11 November 2022 (Arrowsmith
North) , 17 September 2019 (Arrowsmith Central) , 9 May 2023 (Arrowsmith Brand), 18 October 2019 (Muchea) and 18 August 2022 (Boyatup). The Company confirms that it is not aware of any new information or data that materially affects the
information included in this document and all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Silica Sand - the Second-most
Consumed Material on Earth
3
Portfolio Highlights
WA-based, pure-play silica sand company with advanced silica sand projects
100+ year production life
❑ 100% owner of five high value silica sand projects in Western Australia - Tier 1 mining
region
❑ Multi-decade-scale contiguous sand deposits with significant high-grade Resources
❑ Most-advanced non-private silica sand projects in Australia
❑ Mining Leases granted over three projects and another pending with permitting and
infrastructure preparations well-advanced
❑ Arrowsmith North to lead staggered development. First production expected 2023
– followed by Muchea, Arrowsmith Central, Boyatup and Arrowsmith Brand
❑ Strong interest from customers in Southeast Asia at a time of diminishing global
supply and increasing demand
4
Silica Sand – World Class Projects
Project development pipeline to ensure disciplined, staged
development of world-class assets
❑ WA-based company and management team
❑ Most advanced non-private silica sand projects in Australia
❑ Five very large scale, high grade and low impurity silica sand
projects each project capable of independent operation to supply
processed material to diverse markets
❑ Simple, low impact mining and processing
❑ Access to established infrastructure (logistics, power, water and
gas)
– rail lines to port run adjacent to all project tenements
– gas pipelines run adjacent to each of the project areas
❑ Scale of projects provides long-term opportunity for silica sand
export and potential glass manufacturing and downstream
5
industries in Western Australia
Arrowsmith North
Near-term development opportunity for a world-class silica sand project
❑ Production expected to commence 2023 (subject to final environmental approvals)
❑ 221Mt Ore Reserve @99.7% SiO2 (100-year production) (See Reserve Table)
❑ Grade controlled Proved Ore Reserve 9.2Mt for first 6 years of production
❑ Tailored 2Mtpa processing plant with patented process circuit, revised capital estimate and DFS
underway
❑ Access to established infrastructure –
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer
❑ Access by adjacent Brand Highway
❑ Hybrid gas and solar power supply
6
Arrowsmith North
Environmental and Mining Approvals
❑ Confirmation by Commonwealth Department of Agriculture, Water and the Environment of
accredited State approval under the EPBC Act
❑ State Department of Water and Environmental Regulation and Environmental Protection Authority
(EPA) require PER assessment
❑ Environmental Scoping Document (ESD) approved in March 2022
❑ Environmental Review Document (ERD) lodged in April 2022 and amended June 2022
❑ VRX responded December 2022 to comments from other Govt Agencies and again in May 2023
with confirmation for publication of ERD for public consultation expected on the latest version
❑ Mining proposal for DMIRS lodged for assessment in parallel with ERD
7
Responsible Mining – the VRX Way
A made-for-purpose mining method
designed around continuous rehabilitation
❑ VRX has developed a unique and progressive
mining method for its silica sand projects
❑ The Vegetation Direct Transfer (VDT) method
provides a rapid and comprehensive regeneration
of mined areas based on continuous rehabilitation
as mining progresses
❑ The VDT method removes a 400mm-deep sod
with topsoil containing the vast majority of native
flora and invertebrate fauna remaining intact
❑ Root structures in the loose sand are relatively
shallow at 200-300mm in depth
8
Arrowsmith Central
Environmental and Mining Approvals
❑Confirmation by Commonwealth Department of Agriculture, Water and
the Environment of accredited approval under the EPBC Act
❑State Department of Water and Environmental Regulation and
Environmental Protection Authority (EPA) require PER assessment
❑Environmental Scoping Document (ESD) lodged with EPA in June 2022
❑Environmental Review Document (ERD) prepared and will lodge on ESD
approval
9
Exploration
10
Arrowsmith Brand
Long-term future development opportunity for another world-class silica sand
project
❑ Production in conjunction with Arrowsmith North by independent processing or an expanded
Arrowsmith North processing plant
❑ 523Mt Inferred Resource @97.3% SiO2 (See Resource Table)
❑ Access to infrastructure at Arrowsmith North–
❑ Unused rail line (from Eneabba to Geraldton) runs adjacent to project tenements
❑ Water from Yarragadee North deep aquifer bore at Arrwosmith North
❑ Adjacent to Arrowsmith North access road to Brand Highway
❑ Power supply can be extended to either Arrowsmith Brand independent processing or an
expanded Arrowsmith North processing plant
11
Muchea
Large scale, world class high-grade and low impurity silica sand project
❑ Production to follow Arrowsmith North subject to EPA approval
❑ Utilise VDT and duplicate plant
❑ Access to established infrastructure
❑ Underutilised railway connects to Kwinana (100km)
❑ Grid power
❑ Water from Yaragadee deep aquifer
❑ Adjacent to Brand Highway
❑ Granted Mining Lease and Miscellaneous Licences for access
❑ Significant metallurgical testwork +99.9% SiO2 - <100ppm Fe2O3 after processing (high-grade,
low impurity)
❑ Raw material for premium ultra-clear cover glass production for solar panels
❑ Potential for manufacturing cover glass from adjacent gas/hydrogen pipeline
12
VRX Silica
13
Processing Flowsheet
Simplified wet processing, multiple products, no dust, 2mtpa processing plant at each site
Processing Plant Design
▪ Arrowsmith North, Arrowsmith
Central and Muchea to each have
2 Mtpa processing capacity
▪ No toxic reagents required
14
Sustainability, Environment,
Social and Governance (ESG)
VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals
CLEAN ENERGY
ECONOMIC
GROWTH
INDUSTRY
INNOVATION
SUSTAINABLE
COMMUNITIES
RESPONSIBLE
PRODUCTION
CLIMATE
ACTION
REHABILITATION
PLAN
Utilising reliable,
renewable
modern energy
Enhancing
economic and
productive
employment
Building
resilient
infrastructure
and fostering
innovation
Respecting
heritage values
Employing
sustainable
mining
methods
Reducing
emissions from
production
Employing direct
vegetation
transfer as
a unique
rehabilitation
method
15
Other Initiatives
VRX is investigating other potential downstream products and cost saving alternatives
❑ IAF Grant - VRX is shortlisted for a grant from the State Innovation Attraction Fund to
investigate the production of silica flour
❑ Critical Minerals Prospectus – VRX projects at Arrowsmith North and Muchea were included in
the Critical Minerals Prospectus published by Austrade
❑ Trials of VDT - VRX has applied for a NVCP at Muchea to trial the practicalities of VDT in
various vegetation types at Muchea
❑ Geothermal power - VRX has made application for three geothermal permits near Arrowsmith
16
Our Team
Board
Person
Role
Executive
Experience
Paul
Boyatzis
Chairman
Governance: over 30 years’ experience in
investment, equity markets and managing
public companies
Bruce
Maluish
Managing
Director
Technical and finance: over 40 years’ experience
in mining industry including previous roles as
ASX MD and General Manager
Peter
Pawlowitsch
NonExecutive
Director
Senior executive: finance and corporate roles
David Welch
NonExecutive
Director
Senior executive: responsible for strategy,
business transformation and performance,
commercial negotiations
Person
Role
Experience
Ryan Baxter
General
Manager
Production: 15 years’ experience in mining
and construction with last 9 years
exporting silica sand
David Reid
Exploration
Manager
Technical: responsible for exploration and
mineral processing
Steven
Papadopoulos
Commercial
Manager
Legal and commercial: over 25 years’
experience as corporate lawyer and
commercial advisor in resources and other
industries
Yoonil Kim
Marketing
Manager
Marketing: 19 years’ experience selling
silica sand in the Asian market
17
Corporate Summary
Capital Structure
Share Price
9.8cps *
Ordinary Shares on Issue
560.4 million
Options on Issue
41.3 million
Market Capitalisation
$55 million*
Cash
$3 million
Debt
Nil
Enterprise Value
$52 million
Shareholders
Board and Management
12%
Top 20 Total
33%
Broker Coverage
Euroz Hartleys
* Closing share price on ASX on 5 May 2023
18
Right Time, Right Place
Opportunity for WA to capture its economic advantages of silica sand and gas reserves to
build world-class glass manufacturing and downstream processing industries
❑ Very long life, high-grade silica sand supply with combined 1.1 billion tonne Resource,
99.6% to 99.9% SiO2 grade
❑ WA domestic gas reserves and burgeoning hydrogen projects in mid-west
❑ Long term supply of essential raw materials and green energy for glass manufacturing
(gas/solar/hydrogen)
❑ High-tech ultra-clear glass production capability from Muchea
❑ Manufacturing of solar panels in WA for a huge and growing market in Australia
19
Thank you
Bruce Maluish
Managing Director
Ground Floor, 52 Kings Park Road
West Perth WA 6005
Phone: 08 9226 3780
Email: info@vrxsilica.com.au
Silica Sand Resources and Reserves
Ore Reserves
Mineral Resources
Project
Muchea
Arrowsmith
North
Arrowsmith
Brand
Arrowsmith
Central
Boyatup
Classification
Mt
SiO₂
%
Al₂O₃ %
Fe₂O₃
%
TiO₂
%
LOI
%
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Inferred
Total
Indicated
Inferred
Total
Inferred
Total
29
179
208
10
237
266
513
523
523
28.2
48.3
76.5
60
60
99.6
99.6
99.6
95.9
97.7
98.4
98.0
97.3
97.3
96.6
96.9
96.8
67.8
67.8
0.1
0.1
0.1
1.9
1.0
0.7
0.9
1.4
1.4
1.7
1.5
1.5
0.8
0.8
0.0
0.0
0.0
0.7
0.4
0.3
0.3
0.4
0.4
0.4
0.4
0.4
0.2
0.2
0.1
0.1
0.1
0.3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.7
0.5
0.4
0.4
0.6
0.6
0.7
0.7
0.7
0.9
0.9
Total Mineral
Resources
1,381 Million Tonnes
Project
Classification
Product
Mt
Muchea
Probable
F80
F80C
F150
AFS20
AFS35
Proved
AFS55
Local
Proved Ore Reserve
Arrowsmith
North
AFS20
AFS35
Probable
AFS55
Local
Probable Ore Reserve
Arrowsmith North Ore Reserve
CF400
C20
Arrowsmith
Probable
C40
Central
High TiO2
10.2
4.25
4.25
18.7
0.8
3.9
2.7
1.8
9.2
24.2
102.5
51.1
34.1
212
221
4.2
8.4
4.2
2.2
Arrowsmith Central Ore Reserve
18.9
Muchea Ore Reserve
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
99.9
0.02
0.008
0.03
0.1
99.8
0.07
0.015
0.035
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.04
0.03
0.1
<1%
2%
Million Tonnes
Million Tonnes
99.6
0.25
Million Tonnes
Total Ore Reserves 259 Million Tonnes
21