Boyatup Silica Sand Project Maiden Mineral Resource
Released
Released
Announcement PDF
18 August 2022
ASX ANNOUNCEMENT
Boyatup Silica Sand Project
Maiden Mineral Resource
Highlights:
Inferred Mineral Resource of 60 million tonnes @
97.8% SiO2
Result from shallow vacuum drilling and hand
auger
Testwork demonstrates that the Resource can be
processed to high-quality glass-making sand
Increases total VRX Silica Sand Resources to
approx. 1.12 billion tonnes
VRX Silica Limited (ASX: VRX) (VRX or Company) is pleased
to announce the Mineral Resource Estimate (MRE) for its
Boyatup Silica Sand Project, located 125km east of Esperance.
The MRE is based on a drilling program of 46 hand-held auger
and 160 vacuum drill holes to a depth of 3-4 metres for a total
of 312 metres conducted in March 2022.
The estimate has utilised a comprehensive collation of assays
and Particle Size Distribution (PSD) on the drill samples
collected.
VRX Silica Managing Director Bruce Maluish said: “The
Boyatup mineral resource has confirmed our belief that this is
a significant silica sand project for VRX. This maiden mineral
resource estimate has added significantly to our current
inventory, bringing our total silica sand resources to 1.12 billion
tonnes.
“The sand identified at Boyatup is different in nature to our
existing identified deposits and can open up new supply
markets that differ from our other Projects. Boyatup ultimately
will export through the Esperance Port meaning production is
not limited to the logistical constraints of the Kwinana and
Geraldton Ports. The Esperance Port is capable of handling
Cape sized vessels of up to 200,000 tonnes.
“VRX continues to investigate other silica sand opportunities in
Australia as it progresses its approvals processes at its
Arrowsmith and Muchea Silica Sand Projects.”
ASX: VRX
Capital Structure
Shares on Issue:
558.4 million
Unlisted Options:
35.3 million
Corporate Directory
Paul Boyatzis
Non-Executive Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica
sand projects in
Australia.
Executive Summary
In March 2022 VRX completed a drilling program targeting a potential silica sand deposit at
the Boyatup Project located 125km east of the Port of Esperance (Figure 1). The drilling
program consisted of 46 hand-held auger and 160 vacuum drill holes to a depth of 3-4 metres
for a total of 312 metres. Drilling intersected high quality silica sand which has been assayed
and modelled and resulted in a maiden mineral resource estimate for the Project.
Figure 1 - Boyatup Project Location
The Boyatup MRE is reported in accordance with the JORC Code 2012 Edition. Drilling was
completed typically on a 400m x 800m grid and defines a band of mixed yellow and white sand
above a clay/gravel layer. The potential silica sand products from the Boyatup Project are
expected to be suitable for industries such as glass making.
The MRE results are shown in Table 1. Summary information is included in this announcement
and a JORC 2012 Table 1 is included in Appendix 1. Drill hole results are tabulated in Appendix
2.
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Inferred
60
97.8
0.83
0.23
0.13
0.88
Total
60
97.8
0.83
0.23
0.13
0.88
*Note: Interpreted mineralisation is above a basal layer of clay and/or gravel. Depletion zones include the
upper 0.3 m excluded for rehabilitation purposes. Only areas with a minimum sand depth of 1m were
included. Differences may occur due to rounding.
Table 1:
Boyatup Mineral Resource
Competent Person’s Statement
The information in this document that relates to Boyatup Exploration Results and Mineral
Resource Estimate is based on data collected under the supervision of Mr David Reid, in his
capacity as Exploration Manager. Mr Reid, BSc (Geology), is a registered member of the
Australian Institute of Geoscientists and has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and the activity being undertaken to
qualify as a Competent Person under the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr Reid consents to the
inclusion of the data in the form and context in which it appears.
ASX Listing Rule 5.8.1 Summary
The following summary presents a fair and balanced representation of the information
contained within the Mineral Resource Estimate (MRE) technical report:
• Silica sand mineralisation at Boyatup occurs within an interpreted paleo coastline covered
by the Eocene Plantagenet Beds, in particular the Pallinup Siltstone which overlays the
Werillup Formation which sits unconformably on the Proterozoic granite basement.
• Samples were obtained from auger and vacuum drilling. Quality of drilling/sampling and
analysis, as assessed by the Competent Person, is of an acceptable standard for use in a
Mineral Resource estimate publicly reported in accordance with the JORC Code.
• Major and trace elements apart from SiO2 were analysed using a four acid digest followed
by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry (ICP-OES)
analysis at the Intertek Genalysis, Perth laboratory. Loss on Ignition at 1000°C (LOI) was
analysed by Thermal Gravimetric Analyser. SiO2 was back-calculated by subtracting all
ICP major and trace elements plus LOI from 100%, as this is the most accurate way of
determining SiO2 content for samples with very high SiO2.
• Particle size distribution and a full 49 element analysis via 4A/MS including LOD via
LOD/GR was completed on 14 samples from four of the deeper drill holes completed.
• The Mineral Resource was estimated between an overburden of 300mm excluded for
rehabilitation requirements and basal layer that was geologically logged as clay/gravel.
Multiple minimum mineable depths were modelled with the final resource based on a
>1.0m depth.
• No cut-off parameters have been applied, as the sand is readily amenable to beneficiation
to a suitable product specification through relatively simple metallurgical processes as
demonstrated by initial reported metallurgical testing results. Grade estimation was
completed using inverse distance squared weighting.
•
•
•
•
•
The Mineral Resource is quoted from an interpolated 40m grid over the VRX Silica
tenements above the defined basal surface and below the overburden surface layer.
The Mineral Resource was classified as Inferred based on drill hole logging, drill hole
sample analytical results, drill spacing, geostatistical analysis, confidence in geological
continuity, and metallurgical / process test results.
Roughly <5% of the interpreted mineralisation is extrapolated.
The JORC Code Clause 49 requires that industrial minerals must be reported “in terms of
the mineral or minerals on which the project is to be based and must include the
specification of those minerals” and that “It may be necessary, prior to the reporting of a
Mineral Resource or Ore Reserve, to take particular account of certain key characteristics
or qualities such as likely product specifications, proximity to markets and general product
marketability.” (ASX LR 5.8.1 Mining, metallurgy & economic modifying factors)
Therefore, the likelihood of eventual economic extraction was considered in terms of
possible open pit mining, likely product specifications, possible product marketability and
potentially favourable logistics and it is concluded that Boyatup is an Industrial Mineral
Resource in terms of Clause 49. (ASX LR 5.8.1 Mining, metallurgy & economic modifying
factors)
Detailed Information
Geology
Boyatup is interpreted as a paleo coastline covered by the Eocene Plantagenet Beds,
Figure 2, in particular the Pallinup Siltstone which overlays the Werillup Formation which sits
unconformably on the Proterozoic granite basement. The Pallinup Siltstone is a said to have
3 facies units; Spongolite, Sand/Silt and Siltstone (Johnson and Baddock, 1998).
Figure 2 - Cenozoic Sediments over Boyatup Project defining the paleo coastline
Metallurgical Testwork
Initial metallurgical testwork has been completed on the drill samples from the Boyatup
Project. This work has demonstrated the Project can be upgraded using a simple flowchart to
produce glass grade silica sand of an appropriate particle size.
Simple washing and screening of the raw sand followed by sieve analysis indicates the in-situ
silica sand can be upgraded to glass grade quality,
Sizing
SiO₂
(%)
Al₂O₃
(%)
Fe₂O₃
(%)
LOI
(%)
TiO₂
(%)
Washed sand
99.5
0.15
0.03
0.2
0.1
300 to 210um
99.9
0.07
0.02
0.1
0
+150um
99.8
0.09
0.02
0.1
0.1
+100um
99.8
0.11
0.02
0.2
0.1
+75um
99.5
0.22
0.04
0.4
0.2
Table 2: Boyatup PSD and Mineral Analysis
As part of the drilling program particle size distribution sampling was completed on 14 samples
across four drill holes BAU014, BAV046, BAV102 and BAV 111, Figure 3.
Figure 3: Boyatup Metallurgical Drill Holes
A graphical representation of the PSD of these samples is shown in Figure 4 and confirms the
material conforms with the size specifications for glass making.
The size distribution indicates a “fine” product and differs from products at the Arrowsmith and
Muchea Silica Sand Projects, and will be attractive to different glassmaking industry markets.
Figure 4 – Particle size distribution
Mineral Resource Estimate
Drilling
Drilling over the Boyatup Project area has been completed via a hand auger and vacuum drill
rig, Figure 5, with hole depths ranging from 0.5 m to 4 m and an average depth of 1.5 m
(Appendix 2 sets out the drill hole listing).
Drilling has been completed along mulched tracks that form a nominal 800 metre line spacing
and a drill spacing of 400 metre along lines, Figure 6. For every 10 holes drilled an additional
hole was drilled close by (<1m) to twin the hole for drill and assay quality control purposes.
Figure 5: Vacuum Rig
Figure 6:
Boyatup Drill Hole Locations
Mineral Resource Modelling
Drill holes composites were calculated over the resource depth, after excluding the surface
300mm, and to the basal gravel/clay layer. The average depth, and grades for each element,
were also calculated. A nominal 40m x 40m grid was created over the area drilled with the
depth and grade of each point estimated by an inversed distance squared interpolation with a
2,500 metre search radius to fill the grid. The depth contours were then interrogated to
delineate a continuous area of <1 metre of resource depth. Figure 6 shows the defined
resource area totalling 2,720 Ha. All grid points within this resource area were used to estimate
the average depth and grades of the various elements which represents the mineral resource.
An in-situ dry bulk density of 1.65t/m3 was used and is based on work completed at other VRX
projects and is considered appropriate for this mineral resource.
Figure 6 Modelled extents of minealisation
Mineral Resource Classification
The Mineral Resource has been classified in accordance with the JORC Code (2012 Edition)
using a qualitative approach and is classified as Inferred. This classification accounts for the
level of geological understanding of the deposit, quality of samples, density data, drillhole
spacing and geostatistical parameters.
Future Work
A comprehensive metallurgical testwork program is planned to determine the specification of
the potential products that can be produced from the in-situ sand resource at Boyatup. Initial
work suggests that the potential products are different from those from the other VRX silica
sand projects, due to the different particle size, shape and quality.
Once the potential products that can be produced are identified a marketing study will be
completed to determine the focus to maximise the economic value of the project.
Summary of total VRX Silica Sand Mineral Resources
Table 3 sets out a summary of the MREs for VRX’s four silica sand projects, highlighting an
aggregate MRE of 1.116 billion tonnes.
Classification
Mt
SiO₂
%
Al₂O₃
%
Fe₂O₃
%
TiO₂
%
LOI
%
Indicated
Inferred
Total
Indicated
Inferred
Total
29
172
208
248
523
771
28.2
48.3
76.5
60
60
99.6
99.6
99.6
97.7
98.2
98.0
96.6
96.9
96.8
97.8
97.8
0.09
0.05
0.06
1.00
0.80
0.86
1.70
1.50
1.50
0.83
0.83
0.03
0.02
0.02
0.40
0.30
0.30
0.40
0.40
0.40
0.23
0.23
0.07
0.10
0.10
0.20
0.20
0.17
0.20
0.20
0.20
0.13
0.13
0.22
0.23
0.23
0.50
0.40
0.41
0.70
0.70
0.70
0.88
0.88
Total Mineral Resources
1.116
Billion Tonnes
Project
Muchea
Arrowsmith
North
Arrowsmith
Central
Boyatup
Total
Indicated
Inferred
Total
Inferred
Table 3. Aggregate VRX Mineral Resource Estimates
Information that relates to the estimation and reporting of the Mineral Resources for the
Arrowsmith North, Arrowsmith Central and Muchea Silica Sand Projects is extracted from
releases to ASX on 28 August 2019, 17 September 2019 and 18 October 2019, respectively.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in this document and all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
This announcement has been authorised for release to ASX by the Managing Director, Bruce
Maluish.
Further information:
Bruce Maluish
Managing Director
brucem@vrxsilica.com.au
0418 940 417
Peter Klinger
Cannings Purple
pklinger@canningspurple.com.au
0411 251 540
About VRX Silica
VRX Silica Ltd (ASX: VRX) is developing world-class, high-grade silica sand projects in Western Australia.
The Arrowsmith North and Arrowsmith Central Silica Sand Projects, 270km north of Perth, comprise five granted
exploration licences and two granted mining leases. Bankable feasibility studies for both projects have demonstrated
exceptional financial metrics.
The Muchea Silica Sand Project, 50km north of Perth, comprises two granted and one under-application exploration
licences as well as one granted mining lease. Muchea is a world-class project with high-purity silica sand in situ. A
bankable feasibility study has demonstrated outstanding financial metrics.
The Boyatup Silica Sand Project, 100km east of Esperance, comprises two adjacent granted exploration licences.
Initial indications are that this project can complement the Arrowsmith and Muchea projects and add to the range of
silica products VRX Silica may be capable of producing.
Proven Management
VRX Silica’s Board and Leadership Team have extensive experience in mineral exploration and mine developmentto-production and in the management of publicly listed mining and exploration companies.
Silica Sand Projects Locations
APPENDIX 1 – JORC 2012 Table 1
Section 1: Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
Auger and vacuum drilling samples are nominally 1m down hole but is
reduced when a change in sand is noted. Auger drill samples were
collected in a plastic tub which received the full sample, ~5kg, from the
hole. The sand was homogenised prior to sub sampling, two subsamples, A and B, of ~200g were taken from the drill samples. A bulk
sample of ~4.5kg was retained for each 1m interval for metallurgical
testwork. Vacuum drilling the sand sample is collected in a calico bag of
~5kg. The sand was sub sampled to two samples, A and B, of ~200g.
The remaining sample of ~4.5kg was retained for each sample interval
for metallurgical testwork.
The “A” sample was submitted to the Intertek Laboratory in Maddington,
Perth for drying, splitting (if required), pulverisation in a zircon bowl and
a specialised silica sand 4 Acid digest and ICP analysis and the “B”
sample is retained.
The targeted mineralisation is unconsolidated paleo-coastline silica
sand, the sampling techniques are “industry standard”.
Due to the visual nature of the material, geological logging of the drill
material is the primary method of identifying mineralisation.
A 100mm diameter hand screw auger was used to drill until hole collapse
or refusal.
A 50mm track/trailer mounted vacuum rig was also used to drill to refusal
due to water or a clay/gravel layer.
All material from the hole is recovered. Hole collapse was not an issue.
No relationship is evident between sample recovery and grade.
Geological logging of drill samples is done by the field geologist with
samples retained in chip trays for later interpretation.
Logging is captured in an excel spreadsheet, validated and uploaded into
an Access database.
All drill material, ~5kg, is collected and 2 x 200g sub-samples, A and B,
are taken from the drill material. The A sample is submitted to the
laboratory and the B sample is retained for repeat analysis and QAQC
purposes. The 4.5kg bulk sample is retained for later metallurgical
testwork.
The sample size is considered appropriate for the material sampled.
The 200g samples are submitted to the Intertek Laboratory in
Maddington, Intertek use a zircon bowl pulveriser to reduce the particle
size to -75µm.
Samples were submitted for analysis to the Intertek Laboratory in
Maddington in Perth WA. The assay methods used by Intertek are as
follows: multi-elements are determined by a specialised four-acid digest
including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids in Teflon
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
Quality of
analytical data
and laboratory
tests
Criteria
Verification of
sampling and
analyses
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
Commentary
tubes. Analysed by Inductively Coupled Plasma Mass Spectrometry,
silica is reported by difference.
The assay results have also undergone internal laboratory QAQC, which
includes the analysis of standards, blanks, and repeat measurements.
The Company has been validating a high-purity silica standard that was
created for the Company by OREAS Pty Ltd. This was required as there
is no commercial standard available for high purity silica sand. The
standard was “round robin” assayed at several laboratory’s in Perth prior
to the commencement of drilling.
The standard was then included in the drill sample submissions to
Intertek, in sequence, on a ratio of 1:20. Field duplicate samples were
submitted in a ratio of 1:20 and in addition to this Intertek routinely
duplicated analysis from the pulverised samples in a ratio of 1:25. The
number of QAQC samples therefore represents ~14% of the total
assays.
A full analysis of all the quality control data has been undertaken. This
analysis validates the drill assay dataset and conforms with the
guidelines for reporting under the JORC 2012 code.
Significant intersections validated against geological logging.
Drill holes are twinned at a ratio of 1:10 in drilling order.
Drill hole locations were measured by hand-held GPS with the expected
relative accuracy; GDA94 MGA Zone 51 grid coordinate system is used.
The reduced level (RL) of the drilling collars is generated from publicly
available SRTM data. The SRTM data is compared to the available
Landgate Geodetic Survey Marks to validate the data that it is
appropriate for use.
Drill holes were spaced 400 m apart along 800m spaced mulched lines.
Due to the relatively low variability of assays between drill holes the
current spacing is sufficient for the estimation of a Mineral Resource.
No sample compositing (down hole) has been done.
Sampling is being done on paleo-coastline sand, the drilling orientation
is therefore considered appropriate.
All samples are selected onsite under the supervision of VRX Geological
staff.
Samples are delivered to the Intertek laboratory in Maddington. Intertek
receipt received samples against the sample dispatch documents and
issued a reconciliation report for every sample batch.
There has been no audit or review of sampling techniques and data yet.
Section 2: Reporting of Exploration Results
Criteria
Commentary
Mineral tenement
and land tenure
status
Auger and vacuum drilling was done on Tenement E69/3560 which are
100% held by a wholly owned subsidiary of VRX Silica Limited.
The tenements were granted on 17/04/2018, and all drilling was
conducted on vacant Crown land.
No exploration for silica sand has been done.
Exploration done
by other parties
Geology
Drillhole
information
Data aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
reporting
Other substantive
exploration data
Further work
Boyatup is interpreted as a paleo coastline covered by the Eocene
Plantagenet Beds, in particular the Pallinup Siltstone which overlays
the Werillup Formation which sits unconformably on the Proterozoic
granite basement. The Pallinup Siltstone is a said to have 3 facies units;
Spongolite, Sand/Silt and Siltstone (Johnson and Baddock, 1998).
The targeted silica sand deposits are within the weathered Pallinup
Siltstone.
A tabulation of the Aircore drill holes used in this MRE update included
as an attachment to this announcement.
The assay data presented for the silica sand is an arithmetic
determination of the downhole composites.
As the mineralisation is associated with flat lying sands the majority will
be essentially horizontal.
All drilling is vertical; hence the drill intersection is essentially equivalent
to the true width of mineralisation
Refer to figures within the main body of this report.
The accompanying document is considered to represent a balanced
report.
Geological observations are consistent with paleo-coastline
mineralisation.
A basal damp gravel/clay layer determined a maximum achievable drill
depth.
Groundwater was intersected in the southeast during drilling.
The mineralisation is unconsolidated sand.
A comprehensive metallurgical testwork program is planned to
determine the specification of the potential products that can be
produced from the in-situ sand resource at Boyatup. Initial work
suggests that the potential products are different from those from the
other VRX silica sand projects, due to the different particle size, shape
and quality.
Once the potential products that can be produced are identified a
marketing study will be completed to determine the focus to maximise
the economic value of the project.
Section 3: Estimation and Reporting of Mineral Resources
Criteria
Commentary
Database
integrity
Site visits
Geological
interpretation
Dimensions
Data used in the MRE is sourced from a Microsoft Access database.
Relevant tables from the Microsoft Access database are exported to
Microsoft Excel format and converted to csv format for import into GIS
software.
Validation of the data imported comprises checks for overlapping
intervals, missing survey data, missing analytical data, missing
lithological data, and missing collars.
The Competent Person for the estimate is a full-time employee of the
Company and has made multiple visits to the Project area.
Silica sand mineralisation at Boyatup occurs within the coastal regions
of the Bremer Basin, and the targeted silica sand deposits are paleo
coastline covered by the Eocene Plantagenet Beds, in particular the
Pallinup Siltstone which overlays the Werillup Formation which sits
unconformably on the Proterozoic granite basement.
The Mineral Resource was estimated between an overburden of 300mm
removed for rehabilitation requirements and basal layer that was
geologically logged as clay/gravel.
Assumptions have been made on the horizontal extents of the
mineralisation based on the soil mapping data and the spacing and
extents of the drilling information. A nominal maximum horizontal
extrapolation limit of 200 m past known drill data points has been applied
with the material types additionally constrained within the VRX
nominated target area and by the mapped material type boundaries.
Although it is understood that the thickness of the sand layers is likely
to be much more than current auger drilling depths over significant areas
of the modelled area, the vertical extents have been nominally limited to
the current auger drilling depths. Approximately 5% of the modelled
mineralisation zones can be considered to be extrapolated.
Alternative interpretations based on the currently available data are
considered unlikely to have a significant influence on the global MRE.
Continuity of geology and grade can be identified and traced between
drillholes by visual and geochemical characteristics. Confidence in the
grade and geological continuity is reflected in the Mineral Resource
classification.
The modelled and classified extents of the sand material within the
target area are roughly 6.4 km north to south, and on average roughly
10.4 km west to east.
The modelled paleo-coastline sand is roughly horizontal, with low relief.
The currently modelled thickness of the sands is on average about 1.3
m, ranging up to the maximum drill depth of 4 m.
Criteria
Estimation and
modelling
techniques
Moisture
Cut-off
parameters
Mining factors or
assumptions
Metallurgical
factors or
assumptions
Environmental
factors or
assumptions
Commentary
Drill holes composites were calculated over the resource depth, after
excluding the surface 300mm, and to the basal gravel/clay layer. The
average depth, and grades for each element, were also calculated. A
nominal 40m x 40m grid was created over the area drilled with the depth
and grade of each point estimated by an inversed distance squared
interpolation with a 2,500 metre search radius to fill the grid. The depth
contours were then interrogated to delineate a continuous area of <1
metre of resource depth. All grid points within this resource area were
used to estimate the average depth and grades of the various elements
which represents the mineral resource.
Tonnages have been estimated on a dry, in-situ, basis.
The sampled sand material was generally reasonably dry, with data
collected from the density testing of fourteen intervals showing an
average moisture content of 2.9%.
No cut-off parameters have been applied, as the sand appears to be
readily amenable to beneficiation to a suitable product specification
through relatively simple metallurgical processes as demonstrated by
initial reported metallurgical testing results.
It has been assumed that these deposits will be amenable to open cut
mining methods and are economic to exploit to the depths currently
modelled.
No assumptions regarding minimum mining widths and dilution have
been made.
No mining has yet taken place.
Particle size distribution sampling was completed on 14 samples across
four drill holes BAU014, BAV046, BAV102 and BAV 111, and confirms
the material conforms with the specifications for glass production. Simple
washing and screening of the raw sand followed by sieve analysis
indicates the in-situ silica sand can be upgraded to glass grade quality.
No obvious environmental impediments are known that would restrict
potential exploitation of the silica sand mineral resource.
An Environmental desktop study over the project area has been
completed utilising databases from the Department of Biodiversity
Conservation and Attractions (DBCA) to review regional data on:
1.
Priority flora
2.
Priority ecological communities
3.
Threatened ecological communities; and
4.
Significant fauna.
The desktop study is over an extensive area including the drill targets
and surrounding vegetation and habitats. This study will enable future
planning of environmental studies to support an application for
environmental and mining applications.
Criteria
Bulk density
Commentary
An in-situ dry bulk density of 1.65t/m3 was used and is based on work
completed at other VRX Silica projects and is considered appropriate for
this mineral resource.
Classification
The Mineral Resource has been classified in accordance with the JORC
Code (2012 Edition) using a qualitative approach and is classified as
Inferred. This classification accounts for the level of geological
understanding of the deposit, quality of samples, density data, drillhole
spacing and geostatistical parameters.
All factors that have been considered have been adequately
communicated in Section 1 and Section 3 of this Table.
Overall the mineralisation trends are reasonably consistent over the drill
sections.
The mineral resource estimate appropriately reflects the view of the
Competent Person.
Audits or reviews Internal audits were completed by VRX Staff, which verified the technical
inputs, methodology, parameters, and results of the estimate.
No external audits have been undertaken.
Discussion of
The relative accuracy of the mineral resource estimate is reflected in the
relative accuracy/ reporting of the Mineral Resource as per the guidelines of the JORC
confidence
Code (2012).
The Mineral Resource statement relates to global estimates of in-situ
tonnes and grade.
APPENDIX 2 – Drill hole results from surface
Hole ID
BAU001
BAU002
BAU003
BAU004
BAU005
BAU006
BAU007
BAU008
BAU009
BAU010
BAU010A
BAU011
BAU012
BAU013
BAU014
BAU015
BAU016
BAU017
BAU018
BAU019
BAU020
BAU021
BAU021A
BAU022
BAU023
BAU024
BAU025
BAU026
BAU027
BAU028
BAU029
BAU030
BAU030A
BAU031
BAU032
BAU033
BAU034
BAU035
BAU036
BAU037
BAU038
BAU039
BAU040
BAU040A
BAU041
BAU042
BAV001
BAV002
BAV003
BAV004
BAV005
BAV006
MGA_East
508413
508800
509205
509602
509998
510397
510792
511199
511600
512003
511993
506402
506799
507200
507598
508001
508405
508809
509200
509600
510004
510399
510408
510801
511203
511593
512003
512396
512800
513209
513598
514001
514010
514400
514801
515200
515200
515196
514801
514397
514000
513606
513201
513201
512812
512401
512000
511600
511200
510800
510400
512000
MGA_Nth
6273403
6273400
6273402
6273400
6273402
6273403
6273401
6273401
6273405
6273399
6273400
6272601
6272603
6272602
6272604
6272604
6272601
6272601
6272602
Share your feedback
Discover