Quarterly Activities Report
Released
Released
Announcement PDF
The following is a summary of the activities of Ventnor Resources Limited (ASX: VRX) (Ventnor or
the Company) for the quarter ending 30 June 2018.
Exploration
Muchea
During the June quarter, (5 April 2018) Ventnor released results from its preliminary due diligence
drilling program over the Muchea Silica Sand Project which is located on tenement E70/4886 (refer
Figure 1 below), located in the Muchea area, 50km north of Perth.
Figure 1: Muchea Silica Sand Project Location
As part of its initial due diligence investigations into Tenement E70/4886, Ventnor conducted an
aircore (AC) and hand auger drilling program within the Tenement area to confirm the potential of the
project as indicated by previous work undertaken by Australian Silica.
Ventnor’s drilling included 46 aircore holes for 522 metres and 43 hand auger holes for 249 metres
with an average intercept grade of 99.5% SiO2.
The results of the preliminary due diligence drilling program have confirmed the results provided by
Australian Silica and also that this project has the potential for a very large high-grade silica sand
resource.
Included in Ventnor’s due diligence investigations, the Company commenced a testwork program to
ascertain the potential products that could be produced and marketed from the project and undertook
an environmental desktop study.
The targeted silica sand deposits are the aeolian sand dunes that overlie the Pleistocene limestones
and paleo-coastline, which host the Gingin heavy mineral deposits.
Figure 2 below is a schematic section showing the silica sand dune that is targeted for exploration.
The targeted dune is the area above the surrounding natural surface and well above the standing
water table.
Figure 2: Schematic section of Silica Sand Dune Exploration Target
Detailed information on the Muchea Silica Sand Project has been included in the Company’s ASX
announcement on 05 April 2018.
Arrowsmith
On 12 April 2018 Ventnor announced the first two tenements had been granted at its Arrowsmith
Silica Sands Project, located 270km north of Perth, Western Australia. The two tenements comprise
the Arrowsmith Central and Arrowsmith South prospects which form part of the Arrowsmith Silica
Sand Project area.
Figure 3 below shows a map of the Project area.
Table 1 – Arrowsmith Tenement Details
Figure 3 – Arrowsmith Project Location
On 22 June 2018 Ventnor announced a further tenement had been granted at the Arrowsmith
Silica Sand Project, located 270km north of Perth, Western Australia. The tenement, E70/5027covers
the Arrowsmith North project area and comprises 56 blocks.
The final
quarter.
tenement
application
(ELA70/5109) is expected to be granted in the September 2018
Ventnor has lodged PoW’s for exploration approval on the tenements to enable a JORC compliant
Resource drilling program to be undertaken in the September 2018 Quarter. The three contiguous
granted tenements covering the Arrowsmith North, Central and South project areas have a total
granted area of 112 blocks or approximately 360km².
The Arrowsmith area potentially has low environmental impact mining propositions; with
well established rehabilitation techniques in the nearby mineral sands industry.
Tenement details for the entire Arrowsmith Silica Sand Project are below in Table 1:
Tenement
Holders
Application
Date
Grant Date
Area
(BL)
E70/4986
Ventnor Mining Pty Ltd
25/05/2017
06/04/2018
27
E70/4987
Ventnor Mining Pty Ltd
25/04/2017
06/04/2018
29
E70/5027
Ventnor Mining Pty Ltd
29/08/2017
06/06/2018
56
ELA70/5109
Ventnor Mining Pty Ltd
02/01/2018
Pending Grant
12
Table 1 – Arrowsmith Silica Sand Project Tenement Details
Corporate Events
On 2 February 2018, ASX suspended the Company’s securities from trading at the request of the
Company. As per the Company’s announcement dated 30 July 2018 the Company is working with
the ASX to enable to recommencement of trading in the Company’s Shares as soon as possible.
Interests in Mining Tenements as at 30 June 2018
WESTERN AUSTRALIA
Arrowsmith Project – Silica
Tenement
Status
E70/4986
E70/4987
E70/5027
ELA70/5109
Granted
Granted
Granted
Application
Interest at
beginning of
quarter
(%)
100
100
100
-
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
100
Interest at end
of quarter
(%)
100
100
100
100
Interest at
beginning of
quarter
(%)
-
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
100
Interest at end
of quarter
(%)
100
Interest at
beginning of
quarter
(%)
100
100
Interests
relinquished,
reduced or lapsed
(%)
-
Muchea Project – Silica
Tenement
Status
ELA70/5157
Application
Warrawanda Project - Nickel
Tenement
Status
E52/2372
E52/3447
Granted
Granted
Interests
acquired or
increased
(%)
-
Interest at end of
quarter
(%)
100
100
Biranup Project – Base Metals/Gold
Tenement
Status
E39/1828
E38/3191
E39/2000
E39/2001
E39/2003
ELA38/3294
Granted
Granted
Granted
Granted
Granted
Application
Interest at
beginning of
quarter
(%)
100
100
100
100
100
100
Interests
relinquished,
reduced or lapsed
(%)
-
Interests
acquired or
increased
(%)
-
Interest at end
of quarter
(%)
100
100
100
100
100
100
Share your feedback