Silica Sand Bulk Testwork Reults
Released
Released
Announcement PDF
20 September 2018
ASX ANNOUNCEMENT
Silica Sand Bulk Testwork Results
Highlights:
•
Bulk testwork completed on all projects
ASX: VRX
•
Testwork has confirmed high-grade products with samples
sent to potential customers
Capital Structure
•
Third iteration testwork to confirm circuit design to enable
engineering
•
Equipment list and cost estimates by end of year
Ventnor Resources Limited (Ventnor or Company) (ASX: VRX) is
pleased to announce positive bulk sampling results from its Arrowsmith
Silica Sand Project, located 270km north of Perth, and Muchea Silica
Sand Project, 50km north of Perth.
Shares on Issue:
365 million
Unlisted Options:
46.25 million
Corporate Directory
Paul Boyatzis
Non-Executive
Chairman
The results of the testwork have confirmed that Arrowsmith North and
Arrowsmith Central, part of the Arrowsmith Project, and Muchea can
produce sought-after product for glassmaking.
Bruce Maluish
Managing Director
Ventnor had collected a bulk sample of 300kg from each of its four
granted tenements across the Arrowsmith and Muchea projects for bulk
metallurgical testwork.
Peter Pawlowitsch
Non-Executive Director
The testwork program was developed from laboratory scale testwork that
had been undertaken by Nagrom in Perth. The initial results justified a
further program on a larger sample.
John Geary
Company Secretary
The bulk samples were sent to a specialist sand metallurgical testing
laboratory, CDE Global.
The intention of this program was to gain a better understanding of the
sand characteristics when subjected to standard processing techniques.
A significant result of the testwork was the apparent effect of high- density
attritioning and also the recovery of magnetic grains by a high-intensity
magnetic separator on the quality of the final product.
Results from this testwork will also support the Mineral Resource
Estimates for reporting under the JORC 2012 code.
Ventnor has engaged experienced geological consultancy CSA Global to
undertake the Maiden Resource Estimate for Arrowsmith North. The
Estimate is expected later this month.
Ventnor Managing Director Bruce Maluish said: “These testwork results
not only confirm our expectations for glassmaking quality sand at
Arrowsmith and higher-quality sand at Muchea but also justify a further
iteration of testwork to investigate the potential for even higher-grade and
higher-value products.”
This testwork program has enabled the Company to send samples to
prospective customers. The third iteration of bulk testwork is under way,
with results expected in October 2018.
Company Projects
Arrowsmith Silica Sands
Project, 270km north of
Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Biranup base metals
and gold Project
adjacent to the
Tropicana Gold Mine,
WA.
Warrawanda Nickel
Project south of
Newman, WA.
The Company is actively
assessing other projects
in Australia.
Detailed Information
Ventnor has two silica sand projects – at Arrowsmith and Muchea, 270km and 50km north of
Perth, respectively. See locations below:
Muchea (Left) and Arrowsmith (Right) Silica Sand Projects
Ventnor has completed bulk sampling at both projects – air core drilling and hand auger at
Muchea, and hand auger at Arrowsmith – as announced to ASX on 30 July 2018 “Muchea
Acquisition and Capital Raising” and 30 August 2018 “Arrowsmith Silica Sand Project”.
The drill samples were used to generate four bulk composites for metallurgical testwork for
Muchea (air core drilling only sampling), Arrowsmith North, Arrowsmith Central and
Arrowsmith South (hand auger sampling), location maps showing the location of the
composites are on the following page, and drill hole locations tabulated in Appendix 1.
The 4 x 300kg composites were sent to the CDE Global Testwork Facility in Cookstown,
Northern Ireland, and were tested using the following flowsheet:
+4mm dry screening and
De-sliming (-63um)
Attritioning (75% solids)
Spiral Separation
Magnetic Separation
Final Product (Non-Magnetic)
Muchea bulk composite drill hole locations
Arrowsmith bulk composite drill hole locations
The table below shows the average calculated composite grade from the drilling assays for each project area;
Al2O3
CaO
Fe2O3
K2O
MgO
MnO Na2O
TiO2
LOI1000C SiO2Calc. SiO2+LOI
No. Samples in
Project
Composite
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
%
%
%
Muchea
163
729
6
285
64
36
9
14
970
0.22
99.57
99.79
Arrowsmith North
120
9,081
33
3,290
960
107
20
90
1,648
0.43
98.04
98.47
Arrowsmith Central
58
10,992
92
2,711
2,582
107
64
208
2,487
0.42
97.65
98.07
Arrowsmith South
104
26,117 322
5,861
6,669
259
41
532
2,824
0.85
94.88
95.73
The table below shows the 4Acid ICP assay analysis for the Raw Material and Final Product (Non-Magnetic) for each composite;
CDE Global – Bulk Testwork Results
Al2O3
CaO
Fe2O3
K2O
MgO
MnO
Na2O
TiO2
LOI1000C
Raw Material
Non-magnetic
ppm
562
262
ppm
39
49
ppm
175
68
ppm
54
38
ppm
20
12
ppm
4
1
ppm
35
21
ppm
414
179
ARROWSMITH NORTH
Raw Material
Non-magnetic
11,313
1,797
104
46
3,885
414
881
276
100
20
17
2
88
33
ARROWSMITH CENTRAL
Raw Material
Non-magnetic
12,683
2,566
153
68
2,452
341
3,270
785
93
22
23
2
ARROWSMITH SOUTH
Raw Material
Non-magnetic
15,066
7,311
194
149
3,603
470
3,822
3,847
126
32
36
2
SAMPLE MATERIAL
SAMPLE
DESCRIPTION
MUCHEA
%
SiO2
Calc.
SiO2 +
LOI
0.23
0.10
99.64
99.84
99.87
99.94
1,096
198
0.58
0.09
97.67
99.63
98.25
99.72
228
69
1,889
267
0.57
0.13
97.35
99.46
97.92
99.59
262
289
2,043
193
0.62
0.15
96.86
98.62
97.48
98.77
These results clearly demonstrate that glass-quality silica sand product (+99.5% SiO2) can be produced from all project areas, with the exception of
Arrowsmith South.
The silica sand from Muchea will produce a high-quality product with very low impurities, particularly iron.
The testwork completed by CDE Global has highlighted the potential for further improvements
by utilising specialist processing equipment in the attritioning and magnetic separation steps.
The attrition test uses a high-speed shaft with paddles (see image below) at a high slurry
density of 75% solids to liberate fine particles.
CDE Global Lab scale attrition cell
The particle size distribution charts (PSD), below, for the 4 Projects areas show the effect of
attritioning at high densities with a high-energy attritioning cell.
PSD comparison of Muchea raw material Vs attritioned and washed sample
PSD comparison of Arrowsmith North raw material Vs attritioned and washed sample
PSD comparison of Arrowsmith Central raw material Vs attritioned and washed sample
PSD comparison of Arrowsmith South raw material Vs attritioned and washed sample
The magnetic separation step involved pumping a slurry through a magnetised matrix “Hi
Intensity Magnetic Filter”, which separates the feed into three distinct fractions: magnetics,
middlings and non-magnetics, dependant on the magnetic susceptibility of the individual sand
grains.
The table below shows the results of the magnetic separation tests for the 4 project areas.
The results demonstrate that a HI Filter can very effectively separate out the pure quartz grains
from those which contain deleterious elements.
PROCESS STAGE
Muchea
Magnetic Separation
Arrowsmith North
Magnetic Separation
Arrowsmith Central
Magnetic Separation
Arrowsmith South
Magnetic Separation
SAMPLE
DESCRIPTION
Magnetics
Middlings
Non magnetic
Magnetics
Mids
Non magnetic
Magnetics
Middlings
Non magnetic
Magnetics
Mids
Non magnetic
Mass Al 2O3
%
ppm
0.41%
1,245
7.31%
335
92.27%
262
0.63%
5,069
9.33%
1,762
90.04% 1,797
0.71% 16,006
11.24% 2,863
88.06% 2,566
0.70% 15,696
8.26%
6,104
91.04% 7,311
CaO
ppm
175
50
49
403
48
46
424
71
68
1,873
135
149
Cr2O3 Fe 2O3
ppm
ppm
14 2,521
2
90
2
68
75 15,456
3
453
3
414
419 44,243
5
749
3
341
254 43,891
5
624
4
470
K2O
ppm
196
51
38
904
238
276
1,379
827
785
4,046
2,972
3,847
MgO
ppm
128
14
12
518
22
20
471
31
22
1,553
45
32
MnO
ppm
57
1
1
433
2
2
834
7
2
1,301
5
2
Na2O
TiO2
ppm
ppm
117 3,756
30
207
21
179
126 22,668
36
255
33
198
141 36,954
74
676
69
267
405 54,561
225
476
289
193
LOI1000C
SiO2 + LOI
%
0.21
99.18
0.05
99.92
0.10
99.94
0.39
95.43
0.10
99.72
0.09
99.72
1.08
89.91
0.18
99.47
0.13
99.59
0.74
87.64
0.22
98.94
0.15
98.77
Future Work
The results of the CDE Global testwork has confirmed that the Muchea, Arrowsmith North and
Arrowsmith Central projects can produce a sought-after product for glassmaking. This now
enables a JORC compliant Mineral Resource to be estimated for these projects. CSA Global
has been engaged to commence work on the Arrowsmith North Mineral Resource estimate,
which will be completed later this month.
The Arrowsmith North Mineral Resource Estimate will be followed by the Mineral Resource
Estimate at Muchea, to be completed in the December quarter.
A further iteration of testwork has been commenced by CDE Global using a refined flow sheet
to incorporate additional attritioning to further improve the quality of the potential final products
for Muchea, Arrowsmith North and Arrowsmith Central. The proposed testwork flow sheet is
available in Appendix 2. The results of this work are expected to be available early in the
December quarter. Process circuit design and engineering will then follow, allowing for capital
cost estimates to be generated before the end of 2018.
Further information:
Bruce Maluish
Managing Director
Ventnor Resources
0418 940 417
Andrew Rowell
Cannings Purple
arowell@canningspurple.com.au
0400 466 226
Competent Person’s Statement
The information in this release that relates to exploration results and exploration targets is based on,
and fairly represents, information compiled by Mr David Reid who is a Member of the Australian Institute
of Geoscientists (MAIG). Mr Reid is an employee of Ventnor Resources Limited. Mr Reid has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the “2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.”
Mr Reid consents to the inclusion in this release of the matters based on information provided by him
and in the form and context in which they appear.
About Ventnor
Ventnor Resources Ltd (Ventnor) (ASX: VRX) has significant silica sand projects including four granted
exploration licences and one application pending over the Arrowsmith Silica Sands Project, located
270km north of Perth, Western Australia. Initial testwork has confirmed that the projects’ sand can be
upgraded to glassmaking quality. Further work is under way to enable feasibility studies to be completed.
The Company has also completed the acquisition of the Muchea Silica Sand Project, 50km north of Perth,
which complements the Arrowsmith Silica Sands Project with additional significant silica sand resources.
Further work is also under way at this project to enable a feasibility study to be completed.
Ventnor also granted tenements adjacent to the Tropicana Gold Mine in Western Australia’s Goldfields
that are prospective for gold and base metals (Biranup Project), with prospects identified following an
extensive review of historical data.
Also in Western Australia, 40km south of Newman, is Ventnor’s Warrawanda Nickel Project, which is
prospective for nickel sulphides.
Proven Management
The Ventnor directors have extensive experience in mineral exploration and production and in the
management of publicly listed mining and exploration companies.
Project Locations
Appendix 1 – Bulk Composite Drill Hole Locations
Area
Hole_ID
MGA East
MGA Nth
RL
Arrowsmith Central
AC001
6718810
326157
66
Arrowsmith Central
AC002
6718806
325403
62
Arrowsmith Central
AC004
6718801
323714
58
Arrowsmith Central
AC006
6718796
322039
54
Arrowsmith Central
AC007
6718788
321130
51
Arrowsmith Central
AC008
6717779
321568
53
Arrowsmith Central
AC009
6717752
322193
54
Arrowsmith Central
AC010
6717622
322397
54
Arrowsmith Central
AC011
6717186
322052
52
Arrowsmith Central
AC012
6716544
322559
52
Arrowsmith Central
AC013
6715908
323068
54
Arrowsmith Central
AC014
6715291
323573
54
Arrowsmith Central
AC015
6714668
324066
55
Arrowsmith Central
AC016
6714039
324567
55
Arrowsmith Central
AC017
6713406
325085
54
Arrowsmith Central
AC018
6716735
327054
64
Arrowsmith Central
AC019
6715910
327247
63
Arrowsmith Central
AC020
6715126
327430
62
Arrowsmith North
AN001
6730807
319594
51
Arrowsmith North
AN002
6730800
319173
52
Arrowsmith North
AN003
6730793
318763
49
Arrowsmith North
AN004
6730785
318344
42
Arrowsmith North
AN005
6730784
317953
38
Arrowsmith North
AN006
6730775
317537
35
Arrowsmith North
AN020
6734273
317762
41
Arrowsmith North
AN021
6734270
317339
38
Arrowsmith North
AN022
6734269
316933
47
Arrowsmith North
AN023
6734266
316540
47
Arrowsmith North
AN024
6734266
316145
47
Arrowsmith North
AN025
6734268
315764
40
Arrowsmith North
AN026
6734267
315354
48
Arrowsmith North
AN031
6736324
317699
36
Arrowsmith North
AN032
6736308
316909
36
Arrowsmith North
AN033
6736302
316565
41
Arrowsmith North
AN034
6736294
316125
47
Arrowsmith North
AN035
6736284
315716
43
Arrowsmith North
AN036
6736276
315310
47
Arrowsmith North
AN037
6736268
314900
40
Arrowsmith North
AN038
6736261
314518
36
Arrowsmith North
AN045
6738166
318080
35
Arrowsmith North
AN046
6738144
317282
35
Arrowsmith North
AN047
6738144
316440
37
Arrowsmith North
AN048
6738140
316007
44
Arrowsmith North
AN049
6738121
315634
42
Arrowsmith North
AN050
6738115
315289
37
Arrowsmith North
AN051
6738111
314864
39
Arrowsmith North
AN052
6738108
314477
34
Arrowsmith South
AS001
6712067
318822
35
Arrowsmith South
AS002
6711770
318472
34
Arrowsmith South
AS003
6711248
317758
35
Arrowsmith South
AS004
6711380
317417
33
Arrowsmith South
AS005
6710593
317547
32
Arrowsmith South
AS006
6709797
317515
32
Arrowsmith South
AS007
6708221
317794
36
Arrowsmith South
AS008
6705195
320632
68
Arrowsmith South
AS009
6705475
321451
45
Arrowsmith South
AS010
6705732
322206
49
Arrowsmith South
AS011
6704584
323100
46
Arrowsmith South
AS012
6703992
322611
45
Arrowsmith South
AS013
6703346
322095
44
Arrowsmith South
AS014
6702656
322130
44
Arrowsmith South
AS015
6702744
322934
48
Arrowsmith South
AS016
6704318
323354
47
Arrowsmith South
AS017
6703365
323379
50
Arrowsmith South
AS018
6703028
323221
51
Arrowsmith South
AS019
6703114
323407
51
Arrowsmith South
AS020
6702589
323523
51
Arrowsmith South
AS022
6702688
321448
41
Arrowsmith South
AS023
6702675
320467
38
Arrowsmith South
AS024
6703451
320424
54
Arrowsmith South
AS025
6704175
320380
59
Arrowsmith South
AS026
6705770
320314
69
Arrowsmith South
AS027
6706539
320057
68
Arrowsmith South
AS028
6707316
320079
71
Arrowsmith South
AS029
6707996
320080
69
Arrowsmith South
AS030
6708551
320533
70
Arrowsmith South
AS031
6705171
319937
59
Arrowsmith South
AS032
6704992
319161
49
Arrowsmith South
AS033
6705173
318517
36
Arrowsmith South
AS034
6705972
318549
33
Arrowsmith South
AS035
6706742
318483
33
Arrowsmith South
AS036
6707248
318514
34
Arrowsmith South
AS037
6711500
318504
34
Arrowsmith South
AS038
6710701
318404
42
Muchea
MAC005
6515740
394750
71
Muchea
MAC006
6515745
394339
71
Muchea
MAC007
6515769
393931
73
Muchea
MAC009
6516076
393393
73
Muchea
MAC010
6516481
393389
73
Muchea
MAC011
6516835
393389
82
Muchea
MAC012
6517032
393158
77
Muchea
MAC013
6517020
392764
74
Muchea
MAC014
6517005
392327
76
Muchea
MAC017
6514493
396209
67
Muchea
MAC018
6514062
395743
68
Muchea
MAC019
6513774
395428
70
Muchea
MAC020
6513720
396525
68
Muchea
MAC021
6513201
396536
69
Muchea
MAC022
6512853
396609
69
Muchea
MAC023
6512368
396707
71
Muchea
MAC025
6511885
396685
72
Muchea
MAC026
6516560
394339
70
Muchea
MAC027
6516998
394346
73
Muchea
MAC028
6517404
394337
73
Muchea
MAC029
6517670
394103
73
Muchea
MAC030
6517937
393792
73
Muchea
MAC031
6517628
393567
73
Muchea
MAC032
6517276
393384
76
Muchea
MAC033
6517038
393516
79
Muchea
MAC036
6515267
395659
66
Muchea
MAC040
6514065
397298
67
Muchea
MAC041
6515221
394715
69
Muchea
MAC042
6514592
394493
69
Muchea
MAC044
6514457
395052
69
Muchea
MAC046
6516085
394337
71
Appendix 2 – CDE Testwork Program 3
Silica Sand Testwork Program 3
PSD Analysis
Sieve Size mm
+1.7
+1.18
+0.85
+0.600
+0.425
+0.300
+0.212
+0.150
+0.106
+0.075
+0.053
-0.053/Pan
+2mm
Discard
Dry Mass
Prep Zircon Bowl (95% P75 micron)
Level of
Detection
Dry Mass
0.001 g
SiO2
0.001%
Al 2O3
20ppm
Al 2O3
0.001%
CaO
5ppm
CaO
0.001%
Cr2O3
5ppm
Fe 2O3
0.001%
Fe 2O3
5ppm
K2 O
0.001%
K2 O
20ppm
TiO2
0.001%
Li 2O
1ppm
LOI1000
0.01%
MgO
5ppm
1ppm
20ppm
TiO2
5ppm
V 2 O5
1ppm
Sieve Separation
2mm
PSD AND Analysis
25kg
<3mm Attrition 75% Solids by Weight
<3mm Attrition 75% Solids by Weight
5 minutes
10 minutes
Repeat for Each Attritioned Sample
4 Acid/ICP
Analysis
MnO
3 Sand Composites (Arrowsmith North,
Arrowsmith Central, Muchea)
25kg
Analysis
Na2O
Sand Composite
51kg
XRF
Level of
Analysis Detection
4 Acid/ICP AND XRF
Analysis on each Sieve
Size
PSD Analysis
-0.212 mm
+0.850 mm
Sieve to +0.212 mm to -0.850mm
Analysis
Analysis
+0.212 mm to -0.850mm
Spiral Separation
Analysis
High Grade, Low Yield
Low Grade, High Yield
Analysis
Heavies
Heavies
Analysis
Analysis
Middlings
Middlings
Analysis
Analysis
Lights
Lights
Analysis
Stop and wait for results
Analysis
Stop and wait for results
Combine Middlings and
Lights
Subject to spirals
results
Combine Middlings and
Lights
Magnetic Separation
Mag separation by
HI Filter
Magnetic Separation
Magnetics
Magnetics
Analysis
PSD AND
Analysis
Middlings
Middlings
PSD AND
Analysis
PSD AND
Analysis
Non-Magnetics
Non-Magnetics
PSD AND
Analysis
APPENDIX A – JORC 2012 Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
•
Commentary
Nature and quality of sampling (eg cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Muchea
•
AC drilling samples are 1m down hole intervals with sand
collected from a cyclone mounted rotary cone splitter, ~2-3kg
(representing 50% of the drilled sand) was collected. Two subsamples, A and B, of ~200g were taken from the drill samples.
The remainder was retained for metallurgical testwork.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
Aspects of the determination of mineralisation that are Material
to the Public Report.
•
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Auger drilling samples are 1m down hole intervals with sand
collected from a plastic tub which received the full sample,
~8kg, from the hole. The sand was homogenised prior to sub
sampling, two sub-samples, A and B, of ~200g were taken from
the drill samples. A bulk sample of ~5kg was retained for each
1m interval for metallurgical testwork.
•
The “A” sample was submitted to the Intertek Laboratory in
Maddington, Perth for drying, splitting (if required), pulverisation
in a zircon bowl and a specialised silica sand 4 Acid digest and
ICP analysis.
•
All auger samples were weighed to determine if down hole
collapse was occurring, if the samples weights increased
significantly the hole was terminated to avoid up hole
contamination.
Arrowsmith
•
•
Auger drilling was to a depth of 1m with the top 30cm
humus layer excluded
The targeted mineralisation is unconsolidated silica sand
dunes, the sampling techniques are considered to be “industry
standard”.
Criteria
JORC Code explanation
Commentary
•
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc).
Due to the visual nature of the material, geological logging of
the drill material is the primary method of identifying
mineralisation.
Muchea
•
Vertical NQ sized aircore drilling was completed by Wallis
Drilling using a Landcruiser mounted Mantis 82 drill rig.
•
A 100mm diameter hand screw auger was used to drill until hole
collapse.
Arrowsmith
•
Drill sample
recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
A 100mm diameter hand screw auger was used to drill 1m
Aircore
•
Visual assessment and logging of sample recovery and sample
quality
•
Reaming of hole and clearance of drill string after every 3m drill
rod
•
Sample splitter and cyclone cleaned regularly to prevent
sample contamination
•
No relationship is evident between sample recovery and grade
Hand Auger
Logging
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
•
All material recovered from the hole is collected in a plastic
drum and weighed, the weights are used to determine when the
hole is collapsing, and drilling is terminated.
•
No relationship is evident between sample recovery and grade
•
Geological logging of drill samples is done by the field geologist
with samples retained in chip trays for later interpretation.
•
Logging is captured in an excel spreadsheet, validated and
uploaded into an Access database
Criteria
Sub-sampling
techniques
and sample
preparation
Quality of
assay data and
laboratory
tests
JORC Code explanation
•
Whether logging is qualitative of quantitative in nature. Core (or
costean, channel, etc) photography.
•
The total length and percentage of the relevant intersections
logged.
•
If core, whether cut or sawn and whether quarter, half of all core
taken.
•
If non-core, whether fiffled, tube-sampled wet or dry.
•
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
•
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
•
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results for
field duplicates/second-half sampling.
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their deviations, etc.
•
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Commentary
•
AC drill samples are rotary split 50:50 into a calico bag resulting
in 2-3kg of dry sample, 2 x 200g sub-samples, A and B, are
taken from the drill sample. The A sample is submitted to the
laboratory and the B sample is retained for repeat analysis and
QAQC purposes. The bulk sample is retained for later
metallurgical testwork.
•
Auger drill material, ~8kg, is collected in a plastic tub and
homogenised, 2 x 200g sub-samples, A and B, are taken from
the drill material. The A sample is submitted to the laboratory
and the B sample is retained for repeat analysis and QAQC
purposes. A 5kg bulk sample is retained for later metallurgical
testwork.
•
The sample size is considered appropriate for the material
sampled.
•
The 200g samples are submitted to the Intertek Laboratory in
Maddington, Intertek use a zircon bowl pulveriser to reduce the
particle size to -75um.
•
Samples were submitted for analysis to the Intertek Laboratory
in Maddington in Perth WA. The assay methods used by
Intertek are as follows: multi-elements are determined by a
specialised four-acid digest including Hydrofluoric, Nitric,
Perchloric and Hydrochloric acids in Teflon tubes. Analysed by
Inductively Coupled Plasma Mass Spectrometry, silica is
reported by difference.
•
The assay results have also undergone internal laboratory
QAQC, which includes the analysis of standards, blanks and
repeat measurements.
Criteria
Verification of
sampling and
assaying
Location of
data points
JORC Code explanation
Commentary
•
The verification of significant intersections
independent of alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
location used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
by
either
•
The Company has been validating a high-purity silica standard
that was created for the Company by OREAS Pty Ltd. This was
required as there is no commercial standard available for high
purity silica sand. The standard was “round robin” assayed at
several laboratory’s in Perth prior to the commencement of
drilling.
•
The standard was then included in the drill sample submissions
to Intertek, in sequence, on a ratio of 1:20. Field duplicate
samples were submitted in a ratio of 1:20 and in addition to this
Intertek routinely duplicated analysis from the pulverised
samples in a ratio of 1:25. The number of QAQC samples
therefore represents ~14% of the total assays.
•
A full analysis of all the quality control data has been
undertaken. This analysis validates the drill assay dataset and
conforms with the guidelines for reporting under the JORC
2012 code.
•
Significant intersections validated against geological logging
•
At Muchea, twinned holes AC Vs Auger were completed
validate the robustness of hand auger as an appropriate
method of testing the in-situ sand. Assay comparisons shown
an acceptable correlation between the 2 drilling methods.
•
At Muchea the drill hole locations were measured by an RTK
GPS system with accuracy in the order of +/-0.2m; GDA94
MGA Zone 50 grid coordinate system is used. The reduced
level (RL) of the drilling collars are generated by overlaying the
drill holes on LIDAR contour data from the Department of
Water.
•
At Arrowsmith drill hole locations were measured by hand-held
GPS with the expected relative accuracy; GDA94 MGA Zone
50 grid coordinate system is used. The reduced level (RL) of
Criteria
JORC Code explanation
Commentary
the drilling collars is generated from publicly available SRTM
data.
Data spacing
and
distribution
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied
•
•
Whether the orientation is sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
•
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample
security
•
The measures taken to ensure sample security.
•
At Muchea drill holes were spaced 400-800m apart along
existing tracks.
•
At Arrowsmith auger holes were spaced depending on the
presence of dune sand, typically no closer than 1,000m.
•
It is believed that due to the relatively low variability of assays
between drill holes that the current spacing maybe sufficient for
the estimation of a Mineral Resource.
•
No sample compositing (down hole) has been done.
•
Sampling is being done on aeolian sand dunes the drill
orientation is therefore considered appropriate.
•
All samples are selected onsite under the supervision of
Ventnor Geological staff.
•
Samples are delivered to the Intertek laboratory in Maddington.
Intertek receipt received samples against the sample dispatch
documents and issued a reconciliation report for every sample
batch.
•
There has been no audit or review of sampling techniques and
data at this time.
Whether sample compositing has been applied.
Orientation of
data in relation
to geological
structure
Audits or
reviews
•
The results of any audits or reviews of sampling techniques and
data.
Section 2 Repor