Grant of Arrowsmith Brand Mining Lease
Released
Released
Announcement PDF
ASX Announcement
19 July 2023
Grant of Arrowsmith Brand Mining Lease
ASX: VRX
Highlights:
Capital Structure
Mining Lease M70/1418 granted for
Arrowsmith Brand Silica Sand Project
Shares on Issue:
560.4 million
Unlisted Options:
48.5 million
Includes Mineral Resource Estimate for silica
sand within the Mining Lease boundary of
312 Mt @ 97.2% SiO2.
Corporate Directory
Prior testwork demonstrates that the
Resource can be processed to high-quality
glassmaking sand
VRX Silica Limited (VRX Silica or Company) (ASX: VRX) is
pleased to announce the Company has been granted its
fourth silica sand Mining Lease at its new Arrowsmith Brand
Silica Sand Project, which is located 270km north of Perth in
the VRX Silica Arrowsmith Silica Sand Projects precinct.
The Mining Lease includes a portion of the previously
announced Arrowsmith Brand Resource of 523 Mt @ 97.3%
SiO21.
VRX Silica Managing Director Bruce Maluish said: “This
application for a Mining Lease at Arrowsmith Brand is another
extensive application of 1,995 hectares and substantially
covers the previously identified Mineral Resource. The
combined Mining Leases over the Company’s Arrowsmith
Silica Sand Projects now amount to 5,623 Ha with a
significant inventory of over 1.11Bt2 of silica sand at an
average 97.6% SiO2 which can be upgraded to glassmaking
quality.”
“The Arrowsmith Brand Mining Lease is part of the very longterm planning that VRX Silica has at Arrowsmith that allows
for flexibility in selecting low impact areas for development”,
said Maluish.
Paul Boyatzis
Non-Executive
Chairman
Bruce Maluish
Managing Director
Peter Pawlowitsch
Non-Executive Director
David Welch
Non-Executive Director
Ian Hobson
Company Secretary
Silica Sand Projects
Arrowsmith Silica Sand
Projects, 270km north
of Perth, WA.
Muchea Silica Sand
Project, 50km north of
Perth, WA.
Boyatup Silica Sand
Project, 100km east of
Esperance, WA.
The Company is actively
assessing other silica
sand projects in
Australia.
ASX announcement of 9 May 2023, “Arrowsmith Brand Mineral Resource Estimate”. 2See Resource table on
page 5
1&2
This is the last of three approved Mining Lease Applications that the Company has lodged at
Arrowsmith.
The Arrowsmith Brand Mining Lease M 70/1418 has an area of 1,995 Ha, see Table 1 below,
and covers part of and wholly within Exploration Licence E70/5027. It is contiguous with and
to the south of the Arrowsmith North Mining Lease M70/1389, see Figure 1 below.
Table 1: Arrowsmith Brand Mining Lease details
Tenement
Holders
Grant Date
Term
Area (Ha)
M 70/1418
Ventnor Mining Pty Ltd
18/07/2023
21 Years
1,995
On 9 May 2023 VRX Silica announced a Mineral Resource Estimate for Arrowsmith Brand2,
see Table 2.
Arrowsmith Brand Mineral Resource Estimate – as at 09/05/2023
Classification
Inferred
Zone
Mt
SiO₂ %
Al₂O₃ %
Fe₂O₃ %
TiO₂ %
LOI %
White
144
98.4
0.8
0.2
0.2
0.4
Yellow
379
96.9
1.6
0.5
0.2
0.7
523
97.3
1.4
0.4
0.2
0.6
Total
*Note: Interpreted mineralisation is above a basal layer of clay and/or limestone. Depletion zones include the upper
0.3 m excluded for rehabilitation purposes. Only areas with a minimum sand depth of 1m were included. Differences
may occur due to rounding.
Table 2: Arrowsmith Brand Silica Sand Mineral Resource Estimate
Mining Lease M70/1418 contains a portion of the total Mineral Resource Estimate at
Arrowsmith Brand presented in Table 2. This portion is presented below in Table 3.
Arrowsmith Brand Mineral Resource Estimate – within M70/1418
Zone
Mt
SiO₂ %
Al₂O₃ % Fe₂O₃ %
TiO₂ %
LOI %
White
80
98.2
0.8
0.2
0.2
0.4
Yellow
232
96.9
1.5
0.5
0.2
0.7
Total
312
97.2
1.4
0.4
0.2
0.6
Table 3: Arrowsmith Brand Mineral Resource Estimate within M70/1418
2 ASX announcement of 9 May 2023, “Arrowsmith Brand Mineral Resource Estimate”.
2
Figure 1: Arrowsmith Brand Silica Sand Project Location
3
Future Work
VRX expects to advance Arrowsmith Brand using the well-developed process that has been
followed at its other silica sand projects currently being actively developed.
These activities include environmental surveys, further metallurgical testwork, marketing
studies and mine planning studies, which will inform scoping and pre-feasibility studies.
Notice regarding estimates and reporting
The information in this document that relates to the estimation and reporting of the Mineral
Resources and Ore Reserves for the Company’s projects are extracted from the Company’s
announcement to ASX lodged 9 May 2023. The Company confirms that it is not aware of any
new information or data that materially affects the information included in this document and
all material assumptions and technical parameters underpinning the estimates continue to
apply and have not materially changed.
4
Mineral Resources - as at 09/05/2023
Project
Mt
SiO₂
%
29
179
208
10
237
266
513
523
523
28.2
48.3
76.5
60
60
1,381
99.6
0.1
0.0
99.6
0.1
0.0
99.6
0.1
0.0
95.9
1.9
0.7
97.7
1.0
0.4
98.4
0.7
0.3
98.0
0.9
0.3
97.3
1.4
0.4
97.3
1.4
0.4
96.6
1.7
0.4
96.9
1.5
0.4
96.8
1.5
0.4
67.8
0.8
0.2
67.8
0.8
0.2
Million Tonnes
Classification
Muchea
Arrowsmith
North
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Inferred
Arrowsmith
Brand
Total
Indicated
Arrowsmith
Inferred
Central
Total
Inferred
Boyatup
Total
Total Mineral Resource
Al₂O₃
%
Fe₂O₃
%
Ore Reserves
Project
Classification
Product
Mt
Muchea
Probable
F80
F80C
F150
AFS20
AFS35
Proved
AFS55
Local
Proved Ore Reserve
Arrowsmith
North
AFS20
AFS35
Probable
AFS55
Local
Probable Ore Reserve
Arrowsmith North Ore Reserve
CF400
C20
Arrowsmith
Probable
C40
Central
High TiO2
10.2
4.25
4.25
18.7
0.8
3.9
2.7
1.8
9.2
24.2
102.5
51.1
34.1
212
221
4.2
8.4
4.2
2.2
Arrowsmith Central Ore Reserve
Total Ore Reserve
18.9
259
Muchea Ore Reserve
SiO2
%
Al2O3
%
Fe2O3
%
TiO2
%
LOI
%
99.9
0.02
0.008
0.03
0.1
99.8
0.07
0.015
0.035
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
Million Tonnes
99.5
0.25
0.07
99.5
0.5
0.06
99.2
0.5
0.1
0.05
0.05
0.05
0.1
0.1
0.1
0.04
0.03
0.1
<1%
2%
Million Tonnes
Million Tonnes
99.6
0.25
Million Tonnes
Million Tonnes
This announcement has been authorised for release to ASX by the Managing Director,
Bruce Maluish.
5
About VRX Silica Limited
VRX Silica Limited (ASX: VRX) is the most advanced pureplay silica sand company listed on the
ASX, developing its 100% owned silica sand projects at Arrowsmith (North, Brand and Central),
Muchea and Boyatup in Western Australia.
Silica sand is the most used commodity
on the planet after air and water. It is
the main ingredient in all types of
glassmaking, including specialty solar
panel and high-tech glass, and foundry
casting. It is a finite resource that is
running out, with the Asia-Pacific
region experiencing an ever-growing
supply shortfall that is driving up prices.
Arrowsmith is located 270km north of
Perth. Arrowsmith North boasts a
minimum 25-year mine life capable of
producing more than 2Mt tonnes per
year of high-grade (99.7% SiO2)* silica
sand for export to the foundry,
container glass and flat glass markets
in Asia, with permitting well advanced,
and will lead production.
Muchea, located 50km north of Perth,
is an ultra-high-grade (99.9% SiO2)*
silica sand project capable of producing
sand required for ultra-clear glass for
solar panels and other high-tech glass
applications.
Boyatup, located 100km east of
Esperance, is under
development and capable of producing
sand for the glass market.
*Information relating to grades are extracted from releases to ASX on 28 August 2019 and 11 November 2022
(Arrowsmith North) and 18 October 2019 (Muchea). The company is not aware of any new information or data that
materially affects this information.
6
Share your feedback
Discover